EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 2 of 14  ELOG logo
Entry  Mon Feb 27 12:21:29 2023, MP, BS, Runs, , General, List of runs 
A list of runs, to be filled during the experiment is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing
Entry  Wed Mar 1 19:04:37 2023, BS, Runs, Run, General, Run 26 Started 

Run 26 Started

 

Beam 9 enA on the collimator

Entry  Wed Mar 1 20:10:38 2023, BS, DOD, Other, , General,  

Run 26 is going on but not much for the moment in terms of any useful data.

And half of the EAGLE is opened.

20:50 EAGLE closed.

Entry  Wed Mar 1 21:59:45 2023, MB BS, Other, , General,  

Offset of the plunger is 60 um.

new distcal01_vac_after_opening

Entry  Thu Mar 2 00:30:29 2023, BS, DOD, Runs, , General,  

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0011.caendat

 

RU = 5.58 Mb/s

LF = 3.72 Mb/s

Entry  Thu Mar 2 04:17:40 2023, DOD, Runs, , General,  

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0027.caendat

 

RU = 5.10 Mb/s

LF = 3.75 Mb/s

Nothing really to report. The data rates are slowly decreasing from around 3 am. Still observing the frequent sharp minima in the data rates.

Entry  Thu Mar 2 05:33:34 2023, ost-dod, Runs, , General,  

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0031.caendat

 

RU = 4.70 Mb/s

LF = 3.20 Mb/s

Nothing really to report. The data rates are slowly decreasing from around 3 am. Still observing the frequent sharp minima in the data rates.

Entry  Thu Mar 2 07:40:55 2023, ost-dod, Runs, , General,  

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0038.caendat

 

RU = 4.48 Mb/s

LF = 4.07 Mb/s

Nothing really to report. The data rates have been fairly constant since around 4 am. Still observing the frequent sharp minima in the data rates.

Entry  Thu Mar 2 09:20:17 2023, ost-mgb, Runs, , General, Rates 

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0043.caendat

 

RU = 6.25 Mb/s

LF = 4.06 Mb/s

09:15 beam stopped. data saved

Entry  Thu Mar 2 09:24:47 2023, ost-mgb, Runs, Run 27 stopped, General,  

Run 27 stopped

Entry  Thu Mar 2 09:49:13 2023, BS, Runs, , General, run 28 started 

run 28 started

Entry  Thu Mar 2 10:18:14 2023, ost-mgb, Runs, , General, run 29 started 

Run 29 with single gamma trigger

Plunger feedback system is not connected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0029_02-03-2023_10h28m22s/needleRU_i29_0029_0002.caendat

 

RU = 38.5 Mb/s

LF = 12.0 Mb/s

 

Entry  Thu Mar 2 11:14:44 2023, ost-mgb, Runs, , General,  

un 29 with single gamma trigger

Plunger feedback system is not connected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0029_02-03-2023_10h28m22s/needleRU_i29_0029_0021.caendat

 

RU = 40.1 Mb/s

LF = 12.5 Mb/s

Entry  Thu Mar 2 11:19:06 2023, BS, Runs, , General, Run 30 Starts 

We hane now g-g trigger started.

Run 30 started

Entry  Thu Mar 2 12:09:44 2023, ost-mgb, Runs, , General,  

beam stop,

Entry  Thu Mar 2 13:50:50 2023, BS, Runs, , General, Run 30 Continueed 

EAGLE is closed now

We gave a break to test the cable connection of target, degrader, beam dump and collimator.

Run 30 continues to collect data, we did not stop it.

But not much usefull data in it.

Entry  Thu Mar 2 14:59:32 2023, mgb, Runs, , General,  

 

 

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0030_02-03-2023_11h18m31s/needleRU_i30_0030_0011.caendat

 

RU = 3.53 Mb/s

LF = 2.40 Mb/s

Entry  Thu Mar 2 15:15:40 2023, mgb, Runs, , General, beam stopped. eagle is opened and run 30 continues 

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0030_02-03-2023_11h18m31s/needleRU_i30_0030_0011.caendat

 

RU = 3.53 Mb/s

LF = 2.40 Mb/s

beam off and on and off. eagle is opened and run 30 continues

new cable is stucked

Cable test is going on

Entry  Thu Mar 2 16:06:17 2023, A.T., Runs, , General,  

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0031_02-03-2023_11h18m31s/needleRU_i30_0031_0011.caendat

 

RU = 3.53 Mb/s

LF = 2.40 Mb/s

cables to colimeter are checked and replaced.

Entry  Thu Mar 2 16:40:45 2023, MP, Runs, , General, changing the plunger distance to minimum. 
Run 31 was stopped, because plunger distance is reduced to the mininimal one.
It takes time, in the meantime, after some break, run 32  was started, with no beam.
ELOG V3.1.5-fc6679b