EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 11 of 14  ELOG logo
Entry  Sat Mar 4 18:02:48 2023, mgb, Runs, , General,  

UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0138.caendat

RU = 6.39 MB/s

LF = 3.42 MB/s

Plunger ;

Planger run = 534

Supposed Dist=10 um

Actual Distance = 9.9 um

micrometer = 11.4 um

Position = 10.3 um

Voltage = 7.933 V

Beam dumb = 1 nA

Collimeter =0.7 nA

Entry  Sat Mar 4 17:09:13 2023, mgb, Runs, , General,  

RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0133.caendat

RU = 6.45 MB/s

LF = 3.45 MB/s

Plunger ;

Planger run = 525

Supposed Dist=10 um

Actual Distance = 9.8 um

micrometer = 11.2 um

Position = 10.1 um

Voltage = 7.943 V

Beam dumb = 1 nA

Collimeter =0.7 nA

Entry  Sat Mar 4 16:06:19 2023, mgb, Runs, , General,  

RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0127.caendat

RU = 6.25

LF = 3.39

Plunger ;

Planger run = 515

Supposed Dist=10 um

Actual Distance = 9.7 um

Position = 10.3 um

Voltage = 7.938 V

Beam dumb = 1 nA

Collimeter =0.7 nA

Entry  Sat Mar 4 15:02:54 2023, mgb, Runs, , General, running stable 

RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0122.caendat

RU = 5.99

LF = 3.35

Plunger ;

Planger run = 504

Supposed Dist=10

Micrometer = 11.1

Position = 10.2

Voltage = 8.964

Beam dumb = 1 nA

Collimeter =0.7 nA

Entry  Sat Mar 4 13:43:20 2023, OST, Runs, , General,  

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0114.caendat

RU = 7.30

LF = 3.70

Plunger ;

Planger run = 491

Supposed Dist=10

Micrometer = 10.9

Position = 10.4

Voltage = 7.924

Beam dumb = 1 nA

Collimeter =0.7 nA

Everythings continues to stable.

Entry  Sat Mar 4 12:34:52 2023, OST, Runs, , General,  

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0107.caendat

RU = 6.17

LF = 3.25

Plunger ;

Planger run = 479

Supposed Dist=10

Micrometer = 10.6

Position = 10.5

Voltage = 7.908

Beam dumb = 0.8 nA

Collimeter =0.7 nA

Everythings continues to stable.

Entry  Sat Mar 4 11:06:31 2023, OST, Runs, , General,  

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0100.caendat

RU = 6.03

LF = 3.36

Plunger ;

Planger run = 465

Supposed Dist=10

Micrometer = 10.5

Position = 10.5

Voltage = 7.91

Beam dumb = 0.75 nA

Collimeter =0.6 nA

Everythings is looking stable.

Entry  Sat Mar 4 09:51:32 2023, OST, Runs, , General,  

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0094.caendat

RU = 6.43

LF = 3.45

Plunger ;

Planger run = 452

Supposed Dist=10

Micrometer = 10.4

Position = 10.4

Voltage = 7.926

Beam dumb = 1 nA

Collimeter =0.5 nA

Everythings is looking stable.

Entry  Sat Mar 4 08:27:23 2023, OST, Runs, , General,  

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0087.caendat

RU = 4.57

LF = 3.11

Plunger ;

Planger run = 437

Supposed Dist=10

Micrometer = 10.1

Position = 10.4

Voltage = 7.923

Beam dumb = 0.75 nA

Collimeter =0.5 nA

Everythings is looking stable.

Entry  Fri Mar 3 23:38:28 2023, SP, Runs, , General, How different Ge count ge_en_cal_230303_2337.png

All germanium detecors look reasonable, as attached.

Entry  Fri Mar 3 20:50:31 2023, IK, MP, GJ, Other, , Data analysis, Ge spectra ge_rings101_117_143_Screenshot_2023-03-03_20-44-07.pngGe_rates_too_high.png

Ge rates increasing, similar to what it was 24h before. Asking to decrease beam intensity by a factor of 2.

Attached Ge spectra before decreasing.
 

Before decreas beam current was 1.75enA, afterwards 1.1enA.

Entry  Fri Mar 3 19:41:27 2023, IK, Problems, , Hardware, Beamdump readout issue Vol.2. 333626140_152534624340296_7230383118242592907_n.jpg

Issue described in #61 continues to persist.

Beam stopped from 19:20 to 19:32, run 36 ongoing; MP, GJ, BS entering the experimental hall. 

They changed the position of the grounding point on the chamber, moving it downstream after a fitting/joining part (A to B on the attached picture [artist: GJ]).

 

Entry  Fri Mar 3 17:52:41 2023, IK, Problem Fixed, , Hardware, Beamdump readout issue - solved 

Current readout issues from beamdump. Beam stopped from 17:46-17:52, run 36 ongoing.

MP & GJ checking the grounding and connection the beamdump readout. No visible issue found in the exp hall, but copper grounding wire was tightened, which seemingly resolved the issue (stability of beamdump readout).   

Entry  Fri Mar 3 16:47:29 2023, IK, Runs, , General, Run 36 started 

Run 36 Started

New Beam energy is 150 MeV

The beam dumb currennt is 2.5 enA.

Plunger run = 282

 

Entry  Fri Mar 3 15:04:33 2023, KWL, Other, , General, run 35 stopped  

Run 35 stopped. An attempt to check if we can get 5 MeV  higher beam energy.

Entry  Fri Mar 3 14:22:12 2023, IP, Runs, , General,  

the beam comes back. The run 35 is still going.

 

plunger run # 257

Beam dump .... enA (given by operators) * 7 (following entry ID#39) = ... enA

Collimator  ....   enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0059.caendat

RU : 6.18 MB/s

LF : 8.44 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.94 V

 

Entry  Fri Mar 3 13:54:41 2023, IP. KWL, Runs, , General, beam energy measurement 

beam stop due to the beam energy measurement

The beam energy: ~145 MeV

Entry  Fri Mar 3 13:43:56 2023, IP. KWL, Runs, , , 511 annihilation and 279 Au lines in Ge rings ge_rings101_117_143_acceptedACS_gold_line_279keV.pngge_rings101_117_143_acceptedACS.png

The counting rate in 511 keV line for sum of the Ge detectors placed at 101, 117 and 143 degrees (with approved ACS). The largest intensity is visible for Ge at 143 degrees, lowest for 101 deg.

=============================== RING 101

Integration in spectrum user_ge_ring101_acceptedACS_clone.spc

RESULT : 3895

=============================== RING 117

Integration in spectrum user_ge_ring117_acceptedACS.spc

RESULT : 9392

=============================== RING 143

Integration in spectrum user_ge_ring143_acceptedACS.spc

RESULT : 15767

 

The Coulex of 197Au (279.5 keV ) line is visible in all rings with a comparable intensity:

=============================== RING 101

Integration in spectrum user_ge_ring101_acceptedACS_clone.spc

RESULT : 12491

=============================== RING 117

Integration in spectrum user_ge_ring117_acceptedACS.spc

RESULT : 11443

===============================RING 143

Integration in spectrum user_ge_ring143_acceptedACS.spc

RESULT : 10460

 

 

 

Entry  Fri Mar 3 12:11:24 2023, IP, Runs, , General,  

the beam comes back.

Entry  Fri Mar 3 11:48:29 2023, IP, Runs, , General, beam stopped 

The beam is gone.

ELOG V3.1.5-fc6679b