EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 11 of 14  ELOG logo
Entry  Fri Mar 10 10:02:30 2023, OST, Runs, , General,  

run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0045.caendat

RU = 6.18 MB/s

LF =   3.24 MB/s

plunger:

plunger run = 1060

actual distance =  434.6 um

supposed distance = 435.0 um

micrometer =   435.1 um

position =  201.3 um

voltage =  1.934 V

 

Beam dump: 1 nA

Colimator :  0.5 nA

Entry  Fri Mar 10 10:03:36 2023, OST, Runs, , General,  

run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0045.caendat

RU = 6.18 MB/s

LF =   3.24 MB/s

plunger:

plunger run = 1060

actual distance =  434.6 um

supposed distance = 435.0 um

micrometer =   435.1 um

position =  201.3 um

voltage =  1.934 V

 

Beam dump: 1 nA

Colimator :  0.5 nA

Entry  Fri Mar 10 11:36:23 2023, OST, Runs, , General,  

run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0053.caendat

RU = 5.69 MB/s

LF =   3.22 MB/s

plunger:

plunger run = 1087

actual distance =  434.2 um

supposed distance = 435.0 um

micrometer =   437.2 um

position =  203.5 um

voltage =  1.934 V

 

Beam dump: 2.5 nA

Colimator :  0.5 nA

Entry  Fri Mar 10 13:35:49 2023, OST, Runs, , General,  

run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0064.caendat

RU = 7.06 MB/s

LF =   3.35 MB/s

plunger:

plunger run = 1105

actual distance =  434.5 um

supposed distance = 435.0 um

micrometer =   436.4 um

position =  201.8 um

voltage =  1.931 V

 

Beam dump: 1 nA

Colimator :  0.5 nA

Entry  Fri Mar 10 15:04:16 2023, OST, Runs, , General,  

run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0074.caendat

RU = 7.17 MB/s

LF =   3.51 MB/s

plunger:

plunger run = 1120

actual distance =  434.8 um

supposed distance = 435.0 um

micrometer =   436.2 um

position =  202.1 um

voltage =  1.93 V

 

Beam dump: 1 nA

Colimator :  0.5 nA

Entry  Fri Mar 10 16:14:19 2023, IP, Other, , General, Ge - the rate is higher Screenshot_2023-03-10_16-10-45.png

From 13:00 the rate of the Ge [the chanel 4] is a bit higher (~2.15 kHz). And also the rate of other detectors.

 

Entry  Fri Mar 10 16:17:57 2023, IP, Runs, , General, run 52 - stopped 

run 52 - stopped

 

  • Run number: 52
  • Start time: Fri Mar 10 01:19:56 2023
  • Stop time: Fri Mar 10 16:16:25 2023
Entry  Fri Mar 10 16:23:21 2023, IP, Runs, , General,  

run control = 53

 

run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0000.caendat

RU = 7.12 MB/s

LF =   3.50 MB/s

 

plunger:

plunger run = 1134

actual distance =  434.3 um

supposed distance = 435.0 um

micrometer =   436.2 um

position =  201.6 um

voltage =  1.932 V

 

Beam dump: 1 nA

Colimator :  0.5 nA

Entry  Fri Mar 10 17:34:07 2023, IP, Runs, , General,  

run control = 53

 

run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0007.caendat

RU = 8.24 MB/s

LF =   4.10 MB/s

 

plunger:

plunger run = 1146

actual distance =  434.7 um

supposed distance = 435.0 um

micrometer =   436.5 um

position =  202.0 um

voltage =  1.932 V

 

Beam dump: 1 nA

Colimator :  0.5 nA

Entry  Fri Mar 10 18:42:02 2023, IP, Runs, , General,  

run control = 53

 

run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0014.caendat

RU = 7.41 MB/s

LF =   3.34 MB/s

 

plunger:

plunger run = 1157

actual distance =  434.4 um

supposed distance = 435.0 um

micrometer =   436.8 um

position =  201.7 um

voltage =  1.931 V

 

Beam dump: 1 nA      (sometimes increase to 1.5 nA)

Colimator :  0.5 nA

Entry  Fri Mar 10 19:30:48 2023, IP, Runs, , Beam, stop beam  

the beam was stopped at 19:27


 

Entry  Fri Mar 10 19:32:01 2023, IP, Runs, , Beam, start beam 

the beam start: 19:31

Entry  Fri Mar 10 19:42:57 2023, IP, Runs, , General,  

run control = 53

 

run data =/onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0020.caendat

RU = 6.77 MB/s

LF =   3.64 MB/s

 

plunger:

plunger run = 1167

actual distance =  434.4 um

supposed distance = 435 um

micrometer =   437.2 um

position =  201.0 um

voltage =  1.934 V

 

Beam dump: 1 nA      (sometimes increase to 1.5 nA)

Colimator :  0.5 nA

Entry  Fri Mar 10 20:54:20 2023, IP, Problems, , Beam, lost the beam 

the beam was lost at 20:46. The operator is working to solve the problem.

Entry  Fri Mar 10 21:00:15 2023, IP, Problem Fixed, , Beam, the beam comes back 

the beam comes back at 20:54

Entry  Fri Mar 10 21:15:01 2023, IP, Runs, , General,  

run control = 53

 

run data =/onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0029.caendat

RU = 7.81 MB/s

LF =   3.94 MB/s

 

plunger:

plunger run = 1182

actual distance =  434.6 um

supposed distance = 435 um

micrometer =   436.4 um

position =  201.9 um

voltage =  1.934 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

Entry  Fri Mar 10 21:24:29 2023, IP, Runs, , Beam, the beam stopped 

the beam is stopped at 21:23.

Entry  Fri Mar 10 21:26:55 2023, IP, Problems, , Beam, problem with focus the beam 

the beam is not the best focused. The operator works on this problem.

Entry  Fri Mar 10 21:29:28 2023, IP, Runs, , Beam, beam start 

the beam starts at 21:27.

But the operators are still working on focusing the beam.

Entry  Fri Mar 10 21:30:42 2023, IP, Problem Fixed, , Beam, the beam is focused 

the beam is now good focused

ELOG V3.1.5-fc6679b