EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 11 of 14  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Type test Categorydown Subject Text Attachments
  248   Sun Mar 12 07:01:31 2023 OSTRuns General run control = 58

run data =xdaq 2254808224 Mar 12
06:59 needleRU_i58_0058_0017.caendat
  
  249   Sun Mar 12 08:03:08 2023 OSTRuns General run control = 58

run data = xdaq 3303602776 Mar
12 08:01 needleRU_i58_0058_0024.caendat
  
  252   Sun Mar 12 17:03:12 2023 OSTRuns General run control = 58

run data =xdaq 1111949504 Mar 12
17:01 needleRU_i58_0058_0083.caendat
  
  253   Sun Mar 12 18:50:37 2023 OSTRuns General run control = 58

run data =xdaq  471656980
Mar 12 18:47 needleRU_i58_0058_0095.caendat
  
  254   Sun Mar 12 19:00:59 2023 OSTRuns GeneralRun 58 stopped and Run 59 started.18:54 Run 58 stopped and 18:55 Run 59 started.

BEAM STOPPED.

END of EXPERIMENT.
  
  255   Sun Mar 12 19:20:37 2023 MPRuns Generalrun 60, radioactivity, Run 59 collected data using gg trigger
radioactivty

Run 60 trigger changed fropm gg
  
  256   Sun Mar 12 20:31:45 2023 GJRuns Generalrun_61 - target and stopper and beam dump dismounted.target and stopper and beam dump dismounted.
only the constructional elements of the plunger
remained. 
  
  258   Sun Mar 12 21:33:54 2023 GJRuns Generalrun 63 - 152 Eu during LN2 filling    
  259   Sun Mar 12 22:52:36 2023 Bahadir SaygiOther GeneralPlunger Run Files Plunger run files for later to calculate
error in the distance
 134Sm_cont.zip134Sm.zip 
  63   Fri Mar 3 20:50:31 2023 IK, MP, GJOther Data analysisGe spectraGe rates increasing, similar to what it
was 24h before. Asking to decrease beam intensity
by a factor of 2.
 ge_rings101_117_143_Screenshot_2023-03-03_20-44-07.pngGe_rates_too_high.png 
  9   Wed Mar 1 00:14:28 2023 MPOther Beambeam energyBeam energy measured:  148.2 MeV
Mind that this may be an overestimate (by
~1-2 MeV)
  
  11   Wed Mar 1 12:51:33 2023 MPRuns Beambeam on the targetBeam on the target:

target+stopper+beam dump: 25 enA   (1.7 pnA)
  
  100   Mon Mar 6 05:15:43 2023 JD, DWProblems BeamNo beam 05:10:00No beam 05:10:00   
  101   Mon Mar 6 05:16:46 2023 JD, DWProblem Fixed Beam Beam back on 05:15   
  107   Mon Mar 6 09:53:06 2023 OSTProblems BeamBeam dump decreased 2.5 nA to 1.5 nA- stopped run 419:20 to 9:50 am beam current stayed 2.5
nA . After 9:50 am decrease 1.5 nA
  
  113   Mon Mar 6 17:19:24 2023 OSTProblems Beambeam unstable and a little high16:30 beam increased 5 mb/s to 9 mb/s
and stayed 1 hour 9 mb/s

17:10 beam fixed. stable
  
  127   Tue Mar 7 09:18:01 2023 OSTProblems Beamrun number 44 crashed and local filter turned red-but data saved 9:08 local filter turned red. Both .caendat
and   LF .adf files still incrementing.
Stopped run 44, started run 45, looks OK.
 run_control_7mar2023_0910.png 
  128   Tue Mar 7 09:20:53 2023 OSTProblem Fixed Beamrun 45 start-local filter turn greenI started run 45, and local filter turn
green everything is ok.
  
  144   Tue Mar 7 20:42:03 2023 IPProblems Beambeam unstableThere was a problem with the beam from
20:19 to 20:30.

Now it is fine.
  
  153   Wed Mar 8 02:45:53 2023 KS, KSzOther Beamincrease in Counting Rates Since 2:32 increased counting rate observed:

Sinde 3:45 decrease to 1.5 kHz
ch4.
  
ELOG V3.1.5-fc6679b