EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 12 of 14  ELOG logo
ID Date Authordown Type test Category Subject
  7   Tue Feb 28 23:08:35 2023 BSOther  SHIFT LIST

https://docs.google.com/spreadsheets/d/1e2homI9RCYrg369z8aaY3VMIPgapUPOv0zKISsl58vQ/edit?usp=sharing


The data from google sheet obtained 14:17 07/03/23

Initials Name Surname e-mail      
DOD Dave O'Donnell
david.odonnell@uws.ac.uk
     
GJ Grzegorz Jaworski
tatrofil@slcj.uw.edu.pl
           
ÖST Ömer Sefa Temiz
ostemiz@ankara.edu.tr
     
BS Bahadır Saygı
bsaygi@ankara.edu.tr
       
KWL Kasia Wrzosek-Lipska
wrzosek@slcj.uw.edu.pl
     
ZCH Zuzanna Chochulska
zuzanna.chochulska.stud@pw.edu.pl
     
MK Małgorzata Kurach
malgorzata.kurach.stud@pw.edu.pl
     
MP Michał Prędota
michal.predota.stud@pw.edu.pl
       
EG Ernest Grodner
grodner.ernest@gmail.com
     
BSK Bartosz Skura
bartosz.skura.stud@pw.edu.pl
     
FS Franziskus Spee
fspee@ikp.uni-koeln.de
     
MB Marcel Beckers
mbeckers@ikp.uni-koeln.de
     
AK Agnieszka Korgul
korgul@fuw.edu.pl
     
SP Serhii Panasenko
sergey.i.panasenko@gmail.com
     
AT Andrzej Tucholski
tucholski@slcj.uw.edu.pl
     
KS Krzysztof Solak
Krzysztof.solak@post.pl
     
AF Aleksandra Fijałkowska
aleksandra.fijalkowska@fuw.edu.pl
       
MGB M. Güray Budak
mgbudak@gmail.com
     
IK István Kuti kuti@atomki.hu      
JSP Justyna Samorajczyk-Pyśk
samorajczyk@slcj.uw.edu.pl
     
JD James Deary
James.Deary@uws.ac.uk
     
DW Dylan White
Dylan.White@uws.ac.uk
     
IP Iwona Piętka
iz.pietka@student.uw.edu.pl
     
WP Wiktor Poklepa
w.poklepa@student.uw.edu.pl
       
KSz Klara Szlęzak
k.szlezak@student.uw.edu.pl
       
       
       

 

  8   Tue Feb 28 23:10:36 2023 BSOther  What we need to include for Plunger

Plunger Run :

Micrometer :

Supposed Distance:

Position :

  12   Wed Mar 1 16:06:50 2023 BSRuns  Run 23 Stopped

Run 23 Stopped due to some unexpected spikes in the

voltage of collimator.

The plunger did not responde to change distance.

The chamber was opened and observed some yellow spots

seen over the Cd target.

  13   Wed Mar 1 16:07:49 2023 BSRuns  Run 24 Started

Run 24 has been started but no beams at the moment.

EAGLE is opened.

Just colecting background.

  14   Wed Mar 1 19:04:37 2023 BSRunsRunGeneralRun 26 Started

Run 26 Started

 

Beam 9 enA on the collimator

  24   Thu Mar 2 09:49:13 2023 BSRuns Generalrun 28 started

run 28 started

  27   Thu Mar 2 11:17:54 2023 BSRuns  Run 29 stopped

We will change the trigger and we stopped the run number 29

  28   Thu Mar 2 11:19:06 2023 BSRuns GeneralRun 30 Starts

We hane now g-g trigger started.

Run 30 started

  30   Thu Mar 2 13:50:50 2023 BSRuns GeneralRun 30 Continueed

EAGLE is closed now

We gave a break to test the cable connection of target, degrader, beam dump and collimator.

Run 30 continues to collect data, we did not stop it.

But not much usefull data in it.

  35   Thu Mar 2 17:23:53 2023 BSRuns GeneralPlunger Informations

Plunger Run : 48

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 6.5 um

Voltage = 7.957 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
 

  36   Thu Mar 2 17:25:36 2023 BSRuns GeneralRun 32 Stopped

Run 32 Stopped

  37   Thu Mar 2 17:28:21 2023 BSRuns  Run 33 Started

Run 33 Started

Plunger Run : 48

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 6.5 um

Voltage = 7.957 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

 

20:50   Observed beam dropped by a factor of 2 (1.5 enA on the beam dump). Asked the operator to improve beam. 

run stop 22:53 acquisition problem

  94   Mon Mar 6 01:00:29 2023 BSRuns GeneralRun 40 stooped

Run 40 stooped

  95   Mon Mar 6 01:01:26 2023 BSRuns GeneralRun 41 started

Run 41 started

Plunger distance 10 um

  135   Tue Mar 7 14:03:20 2023 BSRuns GeneralCounting Rates

 

 

  136   Tue Mar 7 14:07:33 2023 BSOther GeneralRun Files Number

/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleRU_i45_0045_0027.caendat

/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleLF_i44_0045_0010.adf

  137   Tue Mar 7 14:23:43 2023 BSOther GeneralRU and BU Rates
  138   Tue Mar 7 14:39:08 2023 BSOther GeneralRunlist File ScreenShot Accesses on 07 MArch at 14:38
  151   Wed Mar 8 01:24:04 2023 BSRuns GeneralRun 47 Stopped to Change Distance Change

Run 47 stopped and distance changed from 50 um (+ 100 um offset) to 150 um (+ 100 um offset)

Last plunger run for 50 um (+ 100 um offset) is 495

  167   Wed Mar 8 16:51:13 2023 BSRuns General 

run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0050.caendat

RU =  6.75 MB/s

LF =   3.44 MB/s

plunger:

plunger run = 654

actual distance =  382.7 um

supposed distance = 382.7 um

micrometer =   384.4 um

position =  150.0 um

voltage =  2.147 V

 

Beam dump 1 nA

ELOG V3.1.5-fc6679b