Thu Mar 2 13:50:50 2023, BS, Runs, , General, Run 30 Continueed
|
EAGLE is closed now
We gave a break to test the cable connection of target, degrader, beam dump and collimator.
Run 30 continues to collect data, we did not stop it. |
Thu Mar 2 12:09:44 2023, ost-mgb, Runs, , General,
|
| beam stop, |
Thu Mar 2 11:19:06 2023, BS, Runs, , General, Run 30 Starts
|
We hane now g-g trigger started.
Run 30 started |
Thu Mar 2 11:17:54 2023, BS, Runs, , , Run 29 stopped
|
| We will change the trigger and we stopped the run number 29 |
Thu Mar 2 11:14:44 2023, ost-mgb, Runs, , General,
|
un 29 with single gamma trigger
Plunger feedback system is not connected.
Data |
Thu Mar 2 10:18:14 2023, ost-mgb, Runs, , General, run 29 started
|
Run 29 with single gamma trigger
Plunger feedback system is not connected.
Data |
Thu Mar 2 09:49:13 2023, BS, Runs, , General, run 28 started
|
| run 28 started |
Thu Mar 2 09:24:47 2023, ost-mgb, Runs, Run 27 stopped, General,
|
| Run 27 stopped |
Thu Mar 2 09:20:17 2023, ost-mgb, Runs, , General, Rates
|
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data |
Thu Mar 2 09:05:43 2023, DOD, Problems, , , Sulphur on aluminium fusion-evaporation reactions
|
Using the data which we've sorted to date, I looked into the gamma-gamma coincidences and have identified a number of nuclei e.g. 50Cr, 52Mn,
55Fe which would be consistent with fusion-evaporation reactions involving the sulphur-32 projectiles and aluminium-27. Such reactions would yield a 59Cu
comound system and these channels would be populated as a result of the evaporation of a combination of alphas, protons and neutrons. |
Thu Mar 2 07:40:55 2023, ost-dod, Runs, , General,
|
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data |
Thu Mar 2 05:33:34 2023, ost-dod, Runs, , General,
|
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data |
Thu Mar 2 04:17:40 2023, DOD, Runs, , General,
|
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data |
Thu Mar 2 00:30:29 2023, BS, DOD, Runs, , General,
|
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data |
Wed Mar 1 21:59:45 2023, MB BS, Other, , General,
|
Offset of the plunger is 60 um.
new distcal01_vac_after_opening |
Wed Mar 1 20:10:38 2023, BS, DOD, Other, , General,
|
Run 26 is going on but not much for the moment in terms of any useful data.
And half of the EAGLE is opened.
20:50 EAGLE closed. |
Wed Mar 1 19:04:37 2023, BS, Runs, Run, General, Run 26 Started
|
Run 26 Started
Beam 9 enA on the collimator |
Wed Mar 1 16:07:49 2023, BS, Runs, , , Run 24 Started
|
Run 24 has been started but no beams at the moment.
EAGLE is opened.
Just colecting background. |
Wed Mar 1 16:06:50 2023, BS, Runs, , , Run 23 Stopped
|
Run 23 Stopped due to some unexpected spikes in the
voltage of collimator.
The plunger did not responde to change distance. |
Wed Mar 1 12:51:33 2023, MP, Runs, , Beam, beam on the target
|
Beam on the target:
target+stopper+beam dump: 25 enA (1.7 pnA) not stable
|
|