Entry  Fri Mar 3 11:37:25 2023, IP, Runs, , General,  
plunger run # 230

Beam dump 1.2  enA (given by operators) * 7 (following entry ID#39) = 8.4 enA

Collimator   0.6  enA
Entry  Fri Mar 3 10:21:18 2023, IP. KWL, Runs, , General, beam intensity back to 1.25 enA at the beam dump 
we increased beam intensity to 1.25 enA (readout at the beam dump)
Entry  Fri Mar 3 10:09:20 2023, IP. KWL, Runs, , General, beam intensity decreased to 0.3 enA (at beam dump) on our request  Ge_beamInten_03enA_differentYscale.pngGe_beamInten_03enA_sameYscale.png
// we noticed yesterday that GE at 143 degrees counts more than those placed at 117 and 101. The 511 keV line (+ background) is much more pronounced
for Ge at 143 degrees. To investigate this issue we decreased the beam intensity to 0.3 enA ( value given by operators at the beam dump ). 

Conclusion - decrease of the beam intensity does not explain above observations (se attached figs)
Entry  Fri Mar 3 09:30:15 2023, IP. KWL, Runs, , General,  
plunger run # 208

Beam dump 0.75 enA (given by operators) * 7 (following entry ID#39) = 5.25 enA

Collimator   0.75  enA
Entry  Fri Mar 3 08:20:13 2023, KWL, Runs, , General,  
plunger run # 196

Beam dump 1 enA (given by operators) * 7 (following entry ID#39) = 7 enA

Collimator   0.75  enA
Entry  Fri Mar 3 07:32:28 2023, OST, Runs, , General,  
plunger run # 188

Beam dump 2.5 enA

Collimator  0.8 enA
Entry  Fri Mar 3 06:24:03 2023, OST, Runs, , General,  
plunger run # 178

Beam dump 2.5 enA

Collimator  0.9 enA
Entry  Fri Mar 3 05:18:35 2023, OST, Runs, , General,  
plunger run # 167

 

Beam dump 2.5 enA
Entry  Fri Mar 3 04:15:32 2023, mgb, Runs, , General,  
plunger run # 157

 

Beam dump 2.5 enA
Entry  Fri Mar 3 03:19:34 2023, mgb, Runs, , General,  
plunger run # 147

 

Beam dump 2.5 enA
Entry  Fri Mar 3 02:23:45 2023, GJ, Problems, , Software, builder gate, TS offsets run_0035_BU_lenghts.png
Data from current run - 35, with limited beam current and rates - see a recent post by Güray.
BU level, so what we see in Greware (both online & nearline).
Attached is the fold of Germaniums.
Entry  Fri Mar 3 00:09:19 2023, MP, AT, Runs, , , run 35 
Started after beam current was reduced by a factor of 2

plunger run # 116

Earlier:   CUP#6  100 enA
Entry  Thu Mar 2 23:04:01 2023, GJ, Problem Fixed, , Hardware, Connection of the plunger cables, grounding, beam read-out for the operators Slp823030222550.pdf
Notes of the measurements with different conditions are attached.

Conclusion:
Entry  Thu Mar 2 17:28:21 2023, BS, Runs, , , Run 33 Started 
Run 33 Started

Plunger Run : 48

Supposed Distance = 10 um
Entry  Thu Mar 2 17:25:36 2023, BS, Runs, , General, Run 32 Stopped 
Run 32 Stopped
Entry  Thu Mar 2 17:23:53 2023, BS, Runs, , General, Plunger Informations 
Plunger Run : 48

Supposed Distance = 10 um

position of the target = 10 um
Entry  Thu Mar 2 16:40:45 2023, MP, Runs, , General, changing the plunger distance to minimum. 
Run 31 was stopped, because plunger distance is reduced to the mininimal one.
It takes time, in the meantime, after some break, run 32  was started, with no beam.
Entry  Thu Mar 2 16:06:17 2023, A.T., Runs, , General,  
Data

Position = 522.6

Supposed = 520
Entry  Thu Mar 2 15:15:40 2023, mgb, Runs, , General, beam stopped. eagle is opened and run 30 continues 
Data

Position = 522.6

Supposed = 520
Entry  Thu Mar 2 14:59:32 2023, mgb, Runs, , General,  
 

 

Data
ELOG V3.1.5-fc6679b