EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 12 of 14  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Fri Mar 3 02:23:45 2023, GJ, Problems, , Software, builder gate, TS offsets run_0035_BU_lenghts.png
Data from current run - 35, with limited beam current and rates - see a recent post by Güray.
BU level, so what we see in Greware (both online & nearline).
Attached is the fold of Germaniums.
Entry  Fri Mar 3 02:20:46 2023, mgb, Runs, , General,  
plunger run # 137

 

Beam dump 2.5 enA
Entry  Fri Mar 3 01:15:27 2023, mgb, Runs, , General,  
 

plunger run # 126

Earlier:   CUP#6  100 enA
Entry  Fri Mar 3 00:09:19 2023, MP, AT, Runs, , , run 35 
Started after beam current was reduced by a factor of 2

plunger run # 116

Earlier:   CUP#6  100 enA
Entry  Thu Mar 2 23:04:01 2023, GJ, Problem Fixed, , Hardware, Connection of the plunger cables, grounding, beam read-out for the operators Slp823030222550.pdf
Notes of the measurements with different conditions are attached.

Conclusion:
Entry  Thu Mar 2 23:01:21 2023, A.T., Runs, , General, Run 34 started 
Run 34 Started (33 was stopped due to acquisition problems)

Plunger Run : 105

Supposed Distance = 10 um
Entry  Thu Mar 2 17:28:21 2023, BS, Runs, , , Run 33 Started 
Run 33 Started

Plunger Run : 48

Supposed Distance = 10 um
Entry  Thu Mar 2 17:25:36 2023, BS, Runs, , General, Run 32 Stopped 
Run 32 Stopped
Entry  Thu Mar 2 17:23:53 2023, BS, Runs, , General, Plunger Informations 
Plunger Run : 48

Supposed Distance = 10 um

position of the target = 10 um
Entry  Thu Mar 2 16:40:45 2023, MP, Runs, , General, changing the plunger distance to minimum. 
Run 31 was stopped, because plunger distance is reduced to the mininimal one.
It takes time, in the meantime, after some break, run 32  was started, with no beam.
Entry  Thu Mar 2 16:06:17 2023, A.T., Runs, , General,  
Data

Position = 522.6

Supposed = 520
Entry  Thu Mar 2 15:15:40 2023, mgb, Runs, , General, beam stopped. eagle is opened and run 30 continues 
Data

Position = 522.6

Supposed = 520
Entry  Thu Mar 2 14:59:32 2023, mgb, Runs, , General,  
 

 

Data
Entry  Thu Mar 2 13:50:50 2023, BS, Runs, , General, Run 30 Continueed 
EAGLE is closed now

We gave a break to test the cable connection of target, degrader, beam dump and collimator.

Run 30 continues to collect data, we did not stop it.
Entry  Thu Mar 2 12:09:44 2023, ost-mgb, Runs, , General,  
beam stop,
Entry  Thu Mar 2 11:19:06 2023, BS, Runs, , General, Run 30 Starts 
We hane now g-g trigger started.

Run 30 started
Entry  Thu Mar 2 11:17:54 2023, BS, Runs, , , Run 29 stopped 
We will change the trigger and we stopped the run number 29
Entry  Thu Mar 2 11:14:44 2023, ost-mgb, Runs, , General,  
un 29 with single gamma trigger

Plunger feedback system is not connected.

Data
Entry  Thu Mar 2 10:18:14 2023, ost-mgb, Runs, , General, run 29 started 
Run 29 with single gamma trigger

Plunger feedback system is not connected.

Data
Entry  Thu Mar 2 09:49:13 2023, BS, Runs, , General, run 28 started 
run 28 started
ELOG V3.1.5-fc6679b