EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 13 of 15  ELOG logo
Entry  Tue Mar 7 15:14:29 2023, OST, Problem Fixed, , Software, Run 46 started-15_Ge and number 5 anticompton working now. 
VME crate with CAEN digitizers was rebooted.

Run 46 started, number 15_Ge and number 5 anticompton dedector working now.

 
Entry  Wed Mar 8 12:11:59 2023, IK, Problem Fixed, , General, beam tuned 
Beam tuning was made, focusing significantly improved.

 

Intensity:
Entry  Thu Mar 9 01:41:50 2023, GJ, Problem Fixed, , Hardware, TS zeroing - cables to S-IN from VME controller - between runs 49 and 50 
Since we were observing jumps of 16 ns in timings of all channels of whole boards, the assumption was that the 
signals from logical FIFO arrive at different times to S-IN inputs to zero the TS counters.
6 originally placed cables of quite the same length were replaced with 6 cables of declared 3-ns length, same 
Entry  Fri Mar 10 21:00:15 2023, IP, Problem Fixed, , Beam, the beam comes back 
the beam comes back at 20:54
Entry  Fri Mar 10 21:30:42 2023, IP, Problem Fixed, , Beam, the beam is focused 
the beam is now good focused
Entry  Fri Mar 10 23:29:43 2023, IP, Problem Fixed, , Software, new run 54 
the daq resolved at 23:15

start new run: run 54
Entry  Sun Mar 12 00:09:35 2023, AF, Problem Fixed, , Software, caen_shifted correction in spy & greware 
neda_psdcaen_positions.txt had weird values for three first detectors, especially neda_02.

It was:
    Reply  Wed Apr 15 13:32:24 2026, JD, DW, Problem Fixed, , Beam,  
 




Quote:



Beam back on 05:15
Entry  Sun Feb 26 16:50:56 2023, GJ, Other, , General, proposal HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf
 
Entry  Sun Feb 26 17:26:45 2023, GJ, Other, , General, List of participants 
To be filled in, with affiliation and email.

Presumably, for later publication purposes.
 
Entry  Mon Feb 27 12:10:24 2023, BS, Other, , Target, target 
Support of Target = 1.5 mg/cm2 Ta
Target            = 1.0 mg/cm2 Cd-106
Stopper           = 10 mg/cm2 Au
Entry  Mon Feb 27 12:13:03 2023, MB, Other, , , Plunger Informations 
Off set of the plunger ~60 um

Distcal file   distcal01_vac

 
Entry  Tue Feb 28 23:08:35 2023, BS, Other, , , SHIFT LIST 
https://docs.google.com/spreadsheets/d/1e2homI9RCYrg369z8aaY3VMIPgapUPOv0zKISsl58vQ/edit?usp=sharing


The data from google sheet obtained 14:17 07/03/23
Entry  Tue Feb 28 23:10:36 2023, BS, Other, , , What we need to include for Plunger 
Plunger Run :

Micrometer :

Supposed Distance:
Entry  Wed Mar 1 00:14:28 2023, MP, Other, , Beam, beam energy 
Beam energy measured:  148.2 MeV
Mind that this may be an overestimate (by ~1-2 MeV)
Entry  Wed Mar 1 20:10:38 2023, BS, DOD, Other, , General,  
Run 26 is going on but not much for the moment in terms of any useful data.

And half of the EAGLE is opened.

20:50 EAGLE closed.
Entry  Wed Mar 1 21:59:45 2023, MB BS, Other, , General,  
Offset of the plunger is 60 um.

new distcal01_vac_after_opening
Entry  Fri Mar 3 15:04:33 2023, KWL, Other, , General, run 35 stopped  
Run 35 stopped. An attempt to check if we can get 5 MeV  higher beam energy.
Entry  Fri Mar 3 20:50:31 2023, IK, MP, GJ, Other, , Data analysis, Ge spectra ge_rings101_117_143_Screenshot_2023-03-03_20-44-07.pngGe_rates_too_high.png
Ge rates increasing, similar to what it was 24h before. Asking to decrease beam intensity by a factor of 2.

Attached Ge spectra before decreasing.
 
Entry  Sun Mar 5 22:32:56 2023, MP, Other, , , change of the target 6x
See pictures in the attachment:

1) stopper seen from the back (upstream view)

2) stopper  seen from the front (downstream view)
ELOG V3.1.5-fc6679b