run 28 started
We will change the trigger and we stopped the run number 29
We hane now g-g trigger started.
Run 30 started
EAGLE is closed now
We gave a break to test the cable connection of target, degrader, beam dump and collimator.
Run 30 continues to collect data, we did not stop it.
But not much usefull data in it.
Plunger Run : 48
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 6.5 um
Voltage = 7.957 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
Run 32 Stopped
Run 33 Started
20:50 Observed beam dropped by a factor of 2 (1.5 enA on the beam dump). Asked the operator to improve beam.
run stop 22:53 acquisition problem
Run 40 stooped
Run 41 started
Plunger distance 10 um
/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleRU_i45_0045_0027.caendat
/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleLF_i44_0045_0010.adf
Run 47 stopped and distance changed from 50 um (+ 100 um offset) to 150 um (+ 100 um offset)
Last plunger run for 50 um (+ 100 um offset) is 495
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0050.caendat
RU = 6.75 MB/s
LF = 3.44 MB/s
plunger:
plunger run = 654
actual distance = 382.7 um
supposed distance = 382.7 um
micrometer = 384.4 um
position = 150.0 um
voltage = 2.147 V
Beam dump 1 nA
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0058.caendat
RU = 9.83 MB/s
LF = 4.87 MB/s
plunger run = 665
voltage = 2.148 V
Beam dump 1,25 ~ 1.5 nA
Run 55 Started New Distance 500 um
Run files /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0114.caendat
Beam Dump = 0.7 nA
Run number 55
Plunger Distance = 500 um + offset
Plunger run 1402
Voltage 1.369 V