63
|
Fri Mar 3 20:50:31 2023 |
IK, MP, GJ | Other | | Data analysis | Ge spectra | Ge rates increasing, similar to what it
was 24h before. Asking to decrease beam intensity
by a factor of 2. |
 |
|
91
|
Sun Mar 5 22:32:56 2023 |
MP | Other | | | change of the target | See pictures in the attachment:
1) stopper seen from the back (upstream
view) |
6x |
|
92
|
Mon Mar 6 00:30:32 2023 |
MP, ANJ | Other | | Target | new target mounted | New target mounted.
106Cd 1 mg/cm2
181Ta 1.2 mg/cm2 |
|
|
136
|
Tue Mar 7 14:07:33 2023 |
BS | Other | | General | Run Files Number | /onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleRU_i45_0045_0027.caendat
/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleLF_i44_0045_0010.adf |
|
|
137
|
Tue Mar 7 14:23:43 2023 |
BS | Other | | General | RU and BU Rates | |
|
|
138
|
Tue Mar 7 14:39:08 2023 |
BS | Other | | General | Runlist File ScreenShot Accesses on 07 MArch at 14:38 | |
|
|
153
|
Wed Mar 8 02:45:53 2023 |
KS, KSz | Other | | Beam | increase in Counting Rates | Since 2:32 increased counting rate observed:
Sinde 3:45 decrease to 1.5 kHz
ch4. |
|
|
159
|
Wed Mar 8 10:27:26 2023 |
IK, BS | Other | | General | Ge spectra | Count rates are still a bit high (~2.6kHz
for EAGLE det4). Ge spectra looks fine compared
to earlier ones. |
|
|
185
|
Thu Mar 9 13:22:37 2023 |
OST | Other | | Beam | beam stopped 13:21-13:24 for control | |
|
|
186
|
Thu Mar 9 13:37:33 2023 |
OST | Other | | Beam | Beam stopped 13:37-13:49 for control again. | |
|
|
206
|
Fri Mar 10 16:14:19 2023 |
IP | Other | | General | Ge - the rate is higher | From 13:00 the rate of the Ge [the chanel
4] is a bit higher (~2.15 kHz). And also
the rate of other detectors. |
|
|
222
|
Fri Mar 10 22:40:00 2023 |
IP | Other | | General | Ge - the rate is higher | the rates of detectors are still a bit
higher
|
|
|
228
|
Sat Mar 11 09:29:48 2023 |
EG | Other | | | current exeriment parameters as requested in the manual for shifters | 41_ge_single_theta 101,117,143 looks ok.
No peakdeformation of 511, other gammas FWHM
around half of that of511 - ok |
|
|
229
|
Sat Mar 11 10:46:37 2023 |
EG | Other | Beam intensity | | | ch4 in total rate EGALE_) reached 2.4 kHz,
beam intensity has been reduced to fit the
required 2kHz. |
|
|
231
|
Sat Mar 11 12:42:42 2023 |
EG | Other | | | Beam intensity reduction | Again beam intensity gradually increased
reaching 2.4 kHz ontotal rate EAGLE_0 ch4.
Beam intensity reduction requested. 1.8 kHz |
|
|
234
|
Sat Mar 11 15:16:31 2023 |
EG | Other | | | Beam intensity reduced again | Again beam intensity to high. Reduced to
2 kHz on ch4 GE |
|
|
250
|
Sun Mar 12 09:15:00 2023 |
EG | Other | | | Array_monitors mat refresh synchronization | Beam stable, counting rate within limits,
plunger distance within the given tollerance,
gamma spectra ok, everything looks good but.... |
|
|
259
|
Sun Mar 12 22:52:36 2023 |
Bahadir Saygi | Other | | General | Plunger Run Files | Plunger run files for later to calculate
error in the distance |
 |
|
260
|
Mon Mar 13 12:15:35 2023 |
MP | Other | | | measurement of radioactivity along the beam line | At about 12:00, 13/03/2023 (about
17 hours after the beam was stopped), a measurement
of activity of the beam line was performed |
|
|
261
|
Mon Mar 13 12:16:31 2023 |
MP | Other | | | run 66 | run 66 started, radiocativity (background)
|
|