Run 34 Started (33 was stopped due to acquisition problems)
Plunger Run : 105
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 12.7 um
Voltage = 7.9 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
at the first 10 min det # 5 was switched off
Ge det # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
old scalers: 5 2.5 8 5 8.5 3 5 1.5 5 8.5 8.5 7.5 2.7 2.7 5 kHz
new (Grzes) 1.7 1 3.2 1.8 3.6 0.9 1.7 0.45 1.7 3.5 3.2 3.1 1. 1. 1.7 kHz
beam dump current 3nA
det # 5 scaler 7.7 kHz
stoppped 00:02 because beam current was reduced byu a factor of 2 (see note on the next run) |