EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 14 of 15  ELOG logo
ID Date Author Typedown test Category Subject
  92   Mon Mar 6 00:30:32 2023 MP, ANJOther Targetnew target mounted

New target mounted.

106Cd 1 mg/cm2

181Ta  1.2 mg/cm2

 

Problems in alignment. Offset of 100 um, in spite of the fact that a gap is visible at this distance, and a hair could be moved in between stopper and the target.
Decided to close and pump anyway, after several attempts to improve the alignment.

Stopper same as before, slightly more stretched.

  136   Tue Mar 7 14:07:33 2023 BSOther GeneralRun Files Number

/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleRU_i45_0045_0027.caendat

/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleLF_i44_0045_0010.adf

  137   Tue Mar 7 14:23:43 2023 BSOther GeneralRU and BU Rates
  138   Tue Mar 7 14:39:08 2023 BSOther GeneralRunlist File ScreenShot Accesses on 07 MArch at 14:38
  153   Wed Mar 8 02:45:53 2023 KS, KSzOther Beamincrease in Counting Rates

Since 2:32 increased counting rate observed:

Sinde 3:45 decrease to 1.5 kHz ch4.

run control = 48

/onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0007.caendat
run data =

RU =  8.69 MB/s

LF =   3.79 MB/s

Eagle Rated ch4: around 2.3 kHz

plunger: (2:48)

plunger run = 514

actual distance =  382.7 um

supposed distance = 382.7 um

micrometer =   383.5 um

position =  149.8 um

voltage =  2.144 V

 

Beam dump =  1.5 nA

Collimater=  0.5 nA

  159   Wed Mar 8 10:27:26 2023 IK, BSOther GeneralGe spectra

Count rates are still a bit high (~2.6kHz for EAGLE det4). Ge spectra looks fine compared to earlier ones.


 

  185   Thu Mar 9 13:22:37 2023 OSTOther Beambeam stopped 13:21-13:24 for control
  186   Thu Mar 9 13:37:33 2023 OSTOther BeamBeam stopped 13:37-13:49 for control again.
  206   Fri Mar 10 16:14:19 2023 IPOther GeneralGe - the rate is higher

From 13:00 the rate of the Ge [the chanel 4] is a bit higher (~2.15 kHz). And also the rate of other detectors.

 

  222   Fri Mar 10 22:40:00 2023 IPOther GeneralGe - the rate is higher

the rates of detectors are still a bit higher

Quote:

From 13:00 the rate of the Ge [the chanel 4] is a bit higher (~2.15 kHz). And also the rate of other detectors.

 

 

  228   Sat Mar 11 09:29:48 2023 EGOther  current exeriment parameters as requested in the manual for shifters

41_ge_single_theta 101,117,143 looks ok. No peakdeformation of 511, other gammas FWHM around half of that of511 - ok

ch4 in total rate EAGLE_0 arouns 2.1 kHz - ok

planger tollerace limits (green and blue horizontal markers) set far of the current distance, intantionally?

 

  229   Sat Mar 11 10:46:37 2023 EGOtherBeam intensity  

ch4 in total rate EGALE_) reached 2.4 kHz, beam intensity has been reduced to fit the required 2kHz.

 

  231   Sat Mar 11 12:42:42 2023 EGOther  Beam intensity reduction

Again beam intensity gradually increased reaching 2.4 kHz ontotal rate EAGLE_0 ch4.  Beam intensity reduction requested. 1.8 kHz on ch4 after reduction.

  234   Sat Mar 11 15:16:31 2023 EGOther  Beam intensity reduced again

Again beam intensity to high. Reduced to 2 kHz on ch4 GE

  250   Sun Mar 12 09:15:00 2023 EGOther  Array_monitors mat refresh synchronization

Beam stable, counting rate within limits, plunger distance within the given tollerance, gamma spectra ok, everything looks good but....

(yes there must be some "but"), refreshing of EAGLE_array_monitor.mat and NEDA_array_monitor.mat are out of sync. Mostly pure red colour is dysplayed. Not very usefull and (I suppose) missleading information.


 

  259   Sun Mar 12 22:52:36 2023 Bahadir SaygiOther GeneralPlunger Run Files

Plunger run files for later to calculate error in the distance

  260   Mon Mar 13 12:15:35 2023 MPOther  measurement of radioactivity along the beam line

At about 12:00, 13/03/2023 (about  17 hours after the beam was stopped), a measurement of activity of the beam line was performed using  FH 40G-L10 meter.

Radioctivity run 65 stopped before the measurement, radioactivity run  66 started after the measurement

Background level 120 ns/h

Target, stopper, the forward half of the target chamber - dismounted.

Approximate distance from the target position (upstream), approximate activity

10 cm    500 ns/h

25 cm    420 ns/h

35          350 ns/h

40          350 ns/h

50          200 ns/h

75          170 ns/h

 

 

  261   Mon Mar 13 12:16:31 2023 MPOther  run 66

run 66 started, radiocativity (background)

 

  262   Mon Mar 13 15:16:21 2023 MPOther  list of files copied to Bahadir's disks

Attached are the lists of files copied to the two 4 TB Bahadir's disks.

 

 

  263   Thu Mar 16 12:13:11 2023 MPOther  test of radioactivity

16/03/2023

Plunger chamber closed, some dummy target and stopper probably inside

run 72    eagle closed

run 73    right half of EAGLE completely opened


Three screenshots are attached:

Run 72  EAGLE closed

1)  Three rings.  There is significantly more 511 in ring 143 than in 117, 101

2) 5 detectors of ring 143. They all look similar to each other.

Run 73  right half of EAGLE opened

3) 5 detectors of ring 143.  The 3 detectors in the opened half hardly see 511 keV, the other 2 do.

 

Check with Colibri and a gamma scintillator probe ws done: largest activity is visible close to the target chamber, in the region starting at the edge of the chamber, end ending about 6 cm upstream.

About 80 gamma counts/s are seen there. The count rate decreases further upstream.

Background rate:  20 to 30 counts/s, 25 counts/s in Sala Fizykow.

Radioactivity line seen in the spectra,  with the same behaviour as 511:   743.5,  936 keV, 1434 keV.  These are lines from 52Cr, fed by beta+ decay of 52Mn.

Confirmed by Michain gamma-gamma.

52Mn can be produced in the a2pn channel in  the reaction 32S+27Al

 

ELOG V3.1.5-fc6679b