EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 13 of 15  ELOG logo
ID Date Author Typedown test Category Subject
  140   Tue Mar 7 15:14:29 2023 OSTProblem Fixed SoftwareRun 46 started-15_Ge and number 5 anticompton working now.

VME crate with CAEN digitizers was rebooted.

Run 46 started, number 15_Ge and number 5 anticompton dedector working now.

 

  162   Wed Mar 8 12:11:59 2023 IKProblem Fixed Generalbeam tuned

Beam tuning was made, focusing significantly improved.

 

Intensity:

beam dump: 0.9-1 nA,

collimator: 0.5 nA.

 

Rates:

RU =  8.2 MB/s

LF =   4.03 MB/s

EAGLE det4: 2.2 kHz

 

  175   Thu Mar 9 01:41:50 2023 GJProblem Fixed HardwareTS zeroing - cables to S-IN from VME controller - between runs 49 and 50
Since we were observing jumps of 16 ns in timings of all channels of whole boards, the assumption was that the 
signals from logical FIFO arrive at different times to S-IN inputs to zero the TS counters.
6 originally placed cables of quite the same length were replaced with 6 cables of declared 3-ns length, same 
producer, borrowed from NW's equipment.
  215   Fri Mar 10 21:00:15 2023 IPProblem Fixed Beamthe beam comes back

the beam comes back at 20:54

  220   Fri Mar 10 21:30:42 2023 IPProblem Fixed Beamthe beam is focused

the beam is now good focused

  224   Fri Mar 10 23:29:43 2023 IPProblem Fixed Softwarenew run 54

the daq resolved at 23:15

start new run: run 54

  244   Sun Mar 12 00:09:35 2023 AFProblem Fixed Softwarecaen_shifted correction in spy & greware
neda_psdcaen_positions.txt had weird values for three first detectors, especially neda_02.

It was:
NEDA_00_position_psdcaen    0
NEDA_01_position_psdcaen    0.22
NEDA_02_position_psdcaen    40

I (AF) make it:
NEDA_00_position_psdcaen    0.2
NEDA_01_position_psdcaen    0.2
NEDA_02_position_psdcaen    0.2
  Draft   Wed Apr 15 13:32:24 2026 JD, DWProblem Fixed Beam 

 

Quote:

Beam back on 05:15

 

  1   Sun Feb 26 16:50:56 2023 GJOther Generalproposal
Attachment 1: HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf
HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf
  2   Sun Feb 26 17:26:45 2023 GJOther GeneralList of participants

To be filled in, with affiliation and email.

Presumably, for later publication purposes.
 

Alphabetically by family name, please.

Budak, Mustafa Guray - Gazi University, mbudak@gazi.edu.tr

Ciemała, Michał - IFJ PAN, Kraków, Poland - Michal.Ciemala@ifj.edu.pl

Deary, James, - University of West of Scotland - james.deary@uws.ac.uk

Fijałkowska, Aleksandra,  aleksandra.fijalkowska@fuw.edu.pl

Fransen' Christoph IKP JOELN  fransen@ikp.uni-koeln.de

Goasduff, Alain - INFN-LNL alain.goasduff@lnl.infn.it

Grębosz, Jurek - IFJ PAN, Kraków, Poland

Jaworski, Grzegorz - HIL UW, Poland - tatrofil@slcj.uw.edu.pl

O'Donnell, David - University of West of Scotland - david.odonnell@uws.ac.uk

Palacz, Marcin - HIL UW, Poland - palacz@slcj.uw.edu.pl

Piętka, Iwona - Faculty of Physics, UW - iz.pietka@student.uw.edu.pl

Poklepa, Wiktor - UW, Poland, w.poklepa@student.uw.edu.pl

Saygi, Bahadir - Ankara University, Turkey - bahadir.saygi@ankara.edu.tr

Solak, Krzysztof - UW Poland, krzysztof.solak@post.pl

Szlęzak, Klara - UW, Poland, k.szlezak@student.uw.edu.pl

Temiz, Omer Sefa - Ankara University, Turkey - omer.temiz.95@gmail.com

White, Dylan, - University of West of Scotland - dylan.white@uws.ac.uk

 

 

 

 

  4   Mon Feb 27 12:10:24 2023 BSOther Targettarget
Support of Target = 1.5 mg/cm2 Ta
Target            = 1.0 mg/cm2 Cd-106
Stopper           = 10 mg/cm2 Au
Beam Dump         = ~60 mg/cm2 Au
  5   Mon Feb 27 12:13:03 2023 MBOther  Plunger Informations

Off set of the plunger ~60 um

Distcal file   distcal01_vac

 

  7   Tue Feb 28 23:08:35 2023 BSOther  SHIFT LIST

https://docs.google.com/spreadsheets/d/1e2homI9RCYrg369z8aaY3VMIPgapUPOv0zKISsl58vQ/edit?usp=sharing


The data from google sheet obtained 14:17 07/03/23

Initials Name Surname e-mail      
DOD Dave O'Donnell
david.odonnell@uws.ac.uk
     
GJ Grzegorz Jaworski
tatrofil@slcj.uw.edu.pl
           
ÖST Ömer Sefa Temiz
ostemiz@ankara.edu.tr
     
BS Bahadır Saygı
bsaygi@ankara.edu.tr
       
KWL Kasia Wrzosek-Lipska
wrzosek@slcj.uw.edu.pl
     
ZCH Zuzanna Chochulska
zuzanna.chochulska.stud@pw.edu.pl
     
MK Małgorzata Kurach
malgorzata.kurach.stud@pw.edu.pl
     
MP Michał Prędota
michal.predota.stud@pw.edu.pl
       
EG Ernest Grodner
grodner.ernest@gmail.com
     
BSK Bartosz Skura
bartosz.skura.stud@pw.edu.pl
     
FS Franziskus Spee
fspee@ikp.uni-koeln.de
     
MB Marcel Beckers
mbeckers@ikp.uni-koeln.de
     
AK Agnieszka Korgul
korgul@fuw.edu.pl
     
SP Serhii Panasenko
sergey.i.panasenko@gmail.com
     
AT Andrzej Tucholski
tucholski@slcj.uw.edu.pl
     
KS Krzysztof Solak
Krzysztof.solak@post.pl
     
AF Aleksandra Fijałkowska
aleksandra.fijalkowska@fuw.edu.pl
       
MGB M. Güray Budak
mgbudak@gmail.com
     
IK István Kuti kuti@atomki.hu      
JSP Justyna Samorajczyk-Pyśk
samorajczyk@slcj.uw.edu.pl
     
JD James Deary
James.Deary@uws.ac.uk
     
DW Dylan White
Dylan.White@uws.ac.uk
     
IP Iwona Piętka
iz.pietka@student.uw.edu.pl
     
WP Wiktor Poklepa
w.poklepa@student.uw.edu.pl
       
KSz Klara Szlęzak
k.szlezak@student.uw.edu.pl
       
       
       

 

  8   Tue Feb 28 23:10:36 2023 BSOther  What we need to include for Plunger

Plunger Run :

Micrometer :

Supposed Distance:

Position :

  9   Wed Mar 1 00:14:28 2023 MPOther Beambeam energy
Beam energy measured:  148.2 MeV
Mind that this may be an overestimate (by ~1-2 MeV)
  15   Wed Mar 1 20:10:38 2023 BS, DODOther General 

Run 26 is going on but not much for the moment in terms of any useful data.

And half of the EAGLE is opened.

20:50 EAGLE closed.

  16   Wed Mar 1 21:59:45 2023 MB BSOther General 

Offset of the plunger is 60 um.

new distcal01_vac_after_opening

  59   Fri Mar 3 15:04:33 2023 KWLOther Generalrun 35 stopped

Run 35 stopped. An attempt to check if we can get 5 MeV  higher beam energy.

  63   Fri Mar 3 20:50:31 2023 IK, MP, GJOther Data analysisGe spectra

Ge rates increasing, similar to what it was 24h before. Asking to decrease beam intensity by a factor of 2.

Attached Ge spectra before decreasing.
 

Before decreas beam current was 1.75enA, afterwards 1.1enA.

Attachment 1: ge_rings101_117_143_Screenshot_2023-03-03_20-44-07.png
ge_rings101_117_143_Screenshot_2023-03-03_20-44-07.png
Attachment 2: Ge_rates_too_high.png
Ge_rates_too_high.png
  91   Sun Mar 5 22:32:56 2023 MPOther  change of the target

See pictures in the attachment:

1) stopper seen from the back (upstream view)

2) stopper  seen from the front (downstream view)

Mind the two small off-center dots. It is clear that the beam hits the edge of the frame.  This is possible because the 5 mm collimator has two small dots outside the 5 mm hole (the collimator  can be seen in the beam tube).

3) old target, upstream view

4)  new target, upstream view, after the stopper drove into it

5) new target, before it was mounted

6) the stopper, after the collision with the target. One of the visible rings is probably due to this collision, other traces probably reflect its complicated history earlier.

 

 

Attachment 1: stopper_seen_upstream.jpg
stopper_seen_upstream.jpg
Attachment 2: stopper_seen_downstream.jpg
stopper_seen_downstream.jpg
Attachment 3: target_upstream_view.jpg
target_upstream_view.jpg
Attachment 4: target_new_ustream.jpg
target_new_ustream.jpg
Attachment 5: target_new_on_table.jpg
target_new_on_table.jpg
Attachment 6: stopper.jpg
stopper.jpg
ELOG V3.1.5-fc6679b