EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 2 of 14  ELOG logo
Entry  Fri Mar 10 01:32:20 2023, AM, Runs, , General, run 51 stopped 

run 51 stopped

  • Run number: 51
  • Start time: Thu Mar 9 16:25:00 2023
  • Stop time: Fri Mar 10 00:13:21 2023

 

 

run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0000.caendat

RU =  6.02 MB/s

LF =   3.25 MB/s

 

plunger:

plunger run = 985

actual distance =  435.1 um

supposed distance = 435.0 um

micrometer =   435.9 um

position =  202.4 um

voltage =  1.929 V

 

Beam dump: 1 nA

Colimator :  0.3/0.4 enA

Entry  Thu Mar 9 16:25:57 2023, IP, Runs, , General, run 50 stopped 

run 50 - stopped

  •  
  • Run number: 50
  • Start time: Thu Mar 9 00:50:57 2023
  • Stop time: Thu Mar 9 16:22:37 2023
Entry  Tue Mar 7 23:39:52 2023, IP, KS, Runs, , General, run 46 stopped 

Run 46 - stopped

  • Run number: 46
  • Start time: Tue Mar 7 15:09:06 2023
  • Stop time: Tue Mar 7 23:38:07 2023
Entry  Tue Mar 7 15:12:06 2023, OST, Problems, , Software, run 45 stopped 

14:30 pm to 15:00 run 45 crashed and stopped

Entry  Tue Mar 7 09:20:53 2023, OST, Problem Fixed, , Beam, run 45 start-local filter turn green 

I started run 45, and local filter turn green everything is ok.

Entry  Sun Mar 5 16:58:45 2023, MP, Problems, , Other, run 37 crashed, run 38 junk 

Run 37 stopped by itslelf at 15:43. This was noticed at about 16:10 by observing that grafana data rates do not change.

Stop at Run COntrol.  LF looks  disabled.

Attempt to restart normal way --> run 38  --> failed

Attempts to load topology failed.

Cannot any more refresh or load the Run COntrol web page (192.168.0.133:5000)

Grzes is trying to fix the problem remotely, while we are starting changing of the target....

 

 

Entry  Fri Mar 3 15:04:33 2023, KWL, Other, , General, run 35 stopped  

Run 35 stopped. An attempt to check if we can get 5 MeV  higher beam energy.

Entry  Fri Mar 3 00:09:19 2023, MP, AT, Runs, , , run 35 

Started after beam current was reduced by a factor of 2

plunger run # 116

Earlier:   CUP#6  100 enA

Now: CUP#6   50eNA

Beam dump 1.8 enA

Collimator  0.8 enA

The operator is asked to keep the beam dump current not larger than the present value.

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 11.7 um

Voltage = 7.9 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

 

Observed that detectors at theta 143 degrees count most.  Is this because they see beam dump?

Entry  Thu Mar 2 10:18:14 2023, ost-mgb, Runs, , General, run 29 started 

Run 29 with single gamma trigger

Plunger feedback system is not connected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0029_02-03-2023_10h28m22s/needleRU_i29_0029_0002.caendat

 

RU = 38.5 Mb/s

LF = 12.0 Mb/s

 

Entry  Thu Mar 2 09:49:13 2023, BS, Runs, , General, run 28 started 

run 28 started

Entry  Sun Feb 26 16:50:56 2023, GJ, Other, , General, proposal HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf
 
Entry  Fri Mar 10 21:26:55 2023, IP, Problems, , Beam, problem with focus the beam 

the beam is not the best focused. The operator works on this problem.

Entry  Tue Mar 7 09:41:44 2023, OST, Problems, , Software, number_Ge_15 dedector not taking data 

after run 45 I reset all spectrums and number_Ge_15 dedector not taking data.

i check the fans_monitor_scaler (EAGLE_array_monitor) monitor and number 15 Ge, number ACS 5 never change the color just staying white there is a problem.

 

 

Entry  Sun Mar 12 03:05:45 2023, GJ, AF, Problems, , Network, no data flux visible in grafena, LF prints "write: Broken pipe" 
As in the title, see below.
The data are still being constantly written on the disks with usual rate (also visible on grafena).
Greware is also seeing data.

beeper output:
no new data about the growth for 37 s !!!
Noticed at Sun Mar 12 02:50:42 2023
and weirdo scream followed.


LF output:

write: Broken pipe
  0-LF_neda_2:        98 ev ( 107153)*30   Tot=26234475   2253/s
write: Broken pipe
  0-LF_eagle_1:      881 ev ( 120281)*31   Tot=295856141  24268/s
write: Broken pipe
write: Broken pipe
  0-LF_neda_3:         3 ev (   3909)*5980 Tot=375647125  30917/s
write: Broken pipe
  0-LF_neda_1:        92 ev (  92962)*40   Tot=32523205   2820/s
write: Broken pipe
write: Broken pipe
  0-LF_neda_0:       104 ev ( 117997)*33   Tot=38078515   3323/s
  0-LF_eagle_0:      720 ev (  63994)*31   Tot=268339966  22243/s
write: Broken pipe
write: Broken pipe
write: Broken pipe
write: Broken pipe
write: Broken pipe
write: Broken pipe
  0-LF_neda_2:        72 ev (  87376)*31   Tot=26236761   2274/s
write: Broken pipe
  0-LF_eagle_1:      714 ev ( 104681)*35   Tot=295880265  23988/s
write: Broken pipe
write: Broken pipe
  0-LF_neda_3:         9 ev (   3988)*5870 Tot=375677518  30545/s
write: Broken pipe
  0-LF_neda_1:        93 ev (  98610)*34   Tot=32525919   2698/s
Entry  Mon Mar 6 00:30:32 2023, MP, ANJ, Other, , Target, new target mounted 

New target mounted.

106Cd 1 mg/cm2

181Ta  1.2 mg/cm2

 

Problems in alignment. Offset of 100 um, in spite of the fact that a gap is visible at this distance, and a hair could be moved in between stopper and the target.
Decided to close and pump anyway, after several attempts to improve the alignment.

Stopper same as before, slightly more stretched.

Entry  Fri Mar 10 23:29:43 2023, IP, Problem Fixed, , Software, new run 54 

the daq resolved at 23:15

start new run: run 54

Entry  Mon Mar 20 04:55:24 2023, MP, Other, , , missing caendat.bz2 on Bahadir's disk 
The following  caendat.bz2 files were not copied to Bahadir's disks 
(because they were not bzipped at the time of the copying):

run_0031_02-03-2023_16h04m28s
-rw-rw-r-- 1 xdaq xdaq 4294971272 Mar  2 16:15 needleRU_i31_0031_0000.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq  769385912 Mar  2 16:17 needleRU_i31_0031_0001.caendat.bz2
run_0055_11-03-2023_00h33m38s
-rw-rw-r-- 1 xdaq xdaq 4294970584 Mar 11 20:09 needleRU_i55_0055_0124.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294974732 Mar 11 20:23 needleRU_i55_0055_0125.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294968200 Mar 11 20:33 needleRU_i55_0055_0126.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294969064 Mar 11 20:44 needleRU_i55_0055_0127.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294967332 Mar 11 20:56 needleRU_i55_0055_0128.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294967976 Mar 11 21:10 needleRU_i55_0055_0129.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294984456 Mar 11 21:21 needleRU_i55_0055_0130.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294973384 Mar 11 21:31 needleRU_i55_0055_0131.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294967428 Mar 11 21:42 needleRU_i55_0055_0132.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294968276 Mar 11 21:56 needleRU_i55_0055_0133.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294967576 Mar 11 22:10 needleRU_i55_0055_0134.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294983724 Mar 11 22:26 needleRU_i55_0055_0135.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294967932 Mar 11 22:39 needleRU_i55_0055_0136.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294967564 Mar 11 22:55 needleRU_i55_0055_0137.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294971848 Mar 11 23:05 needleRU_i55_0055_0138.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4046574036 Mar 11 23:14 needleRU_i55_0055_0139.caendat.bz2
run_0058_12-03-2023_04h16m42s
-rw-rw-r-- 1 xdaq xdaq 4295004684 Mar 12 17:25 needleRU_i58_0058_0085.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4295011036 Mar 12 17:33 needleRU_i58_0058_0086.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4295019340 Mar 12 17:42 needleRU_i58_0058_0087.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294975440 Mar 12 17:50 needleRU_i58_0058_0088.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294968176 Mar 12 17:59 needleRU_i58_0058_0089.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294968016 Mar 12 18:09 needleRU_i58_0058_0090.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294968836 Mar 12 18:18 needleRU_i58_0058_0091.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294993728 Mar 12 18:27 needleRU_i58_0058_0092.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294967436 Mar 12 18:36 needleRU_i58_0058_0093.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4295074884 Mar 12 18:46 needleRU_i58_0058_0094.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 3480562784 Mar 12 18:54 needleRU_i58_0058_0095.caendat.bz2

These files were bzipped only on 20/03/2023
Entry  Mon Mar 13 12:15:35 2023, MP, Other, , , measurement of radioactivity along the beam line 

At about 12:00, 13/03/2023 (about  17 hours after the beam was stopped), a measurement of activity of the beam line was performed using  FH 40G-L10 meter.

Radioctivity run 65 stopped before the measurement, radioactivity run  66 started after the measurement

Background level 120 ns/h

Target, stopper, the forward half of the target chamber - dismounted.

Approximate distance from the target position (upstream), approximate activity

10 cm    500 ns/h

25 cm    420 ns/h

35          350 ns/h

40          350 ns/h

50          200 ns/h

75          170 ns/h

 

 

Entry  Fri Mar 10 20:54:20 2023, IP, Problems, , Beam, lost the beam 

the beam was lost at 20:46. The operator is working to solve the problem.

Entry  Mon Mar 13 15:16:21 2023, MP, Other, , , list of files copied to Bahadir's disks disk1.list_of_filesdisk2.list_of_files

Attached are the lists of files copied to the two 4 TB Bahadir's disks.

 

 

ELOG V3.1.5-fc6679b