Fri Mar 10 01:32:20 2023, AM, Runs, , General, run 51 stopped
|
run 51 stopped
- Run number: 51
- Start time: Thu Mar 9 16:25:00 2023
- Stop time: Fri Mar 10 00:13:21 2023
run control = 52
run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0000.caendat
RU = 6.02 MB/s
LF = 3.25 MB/s
plunger:
plunger run = 985
actual distance = 435.1 um
supposed distance = 435.0 um
micrometer = 435.9 um
position = 202.4 um
voltage = 1.929 V
Beam dump: 1 nA
Colimator : 0.3/0.4 enA |
Thu Mar 9 16:25:57 2023, IP, Runs, , General, run 50 stopped
|
run 50 - stopped
-
- Run number: 50
- Start time: Thu Mar 9 00:50:57 2023
- Stop time: Thu Mar 9 16:22:37 2023
|
Tue Mar 7 23:39:52 2023, IP, KS, Runs, , General, run 46 stopped
|
Run 46 - stopped
- Run number: 46
- Start time: Tue Mar 7 15:09:06 2023
- Stop time: Tue Mar 7 23:38:07 2023
|
Tue Mar 7 15:12:06 2023, OST, Problems, , Software, run 45 stopped
|
14:30 pm to 15:00 run 45 crashed and stopped |
Tue Mar 7 09:20:53 2023, OST, Problem Fixed, , Beam, run 45 start-local filter turn green
|
I started run 45, and local filter turn green everything is ok. |
Sun Mar 5 16:58:45 2023, MP, Problems, , Other, run 37 crashed, run 38 junk
|
Run 37 stopped by itslelf at 15:43. This was noticed at about 16:10 by observing that grafana data rates do not change.
Stop at Run COntrol. LF looks disabled.
Attempt to restart normal way --> run 38 --> failed
Attempts to load topology failed.
Cannot any more refresh or load the Run COntrol web page (192.168.0.133:5000)
Grzes is trying to fix the problem remotely, while we are starting changing of the target....
|
Fri Mar 3 15:04:33 2023, KWL, Other, , General, run 35 stopped
|
Run 35 stopped. An attempt to check if we can get 5 MeV higher beam energy. |
Fri Mar 3 00:09:19 2023, MP, AT, Runs, , , run 35
|
Started after beam current was reduced by a factor of 2
plunger run # 116
Earlier: CUP#6 100 enA
Now: CUP#6 50eNA
Beam dump 1.8 enA
Collimator 0.8 enA
The operator is asked to keep the beam dump current not larger than the present value.
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 11.7 um
Voltage = 7.9 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
Observed that detectors at theta 143 degrees count most. Is this because they see beam dump? |
Thu Mar 2 10:18:14 2023, ost-mgb, Runs, , General, run 29 started
|
Run 29 with single gamma trigger
Plunger feedback system is not connected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0029_02-03-2023_10h28m22s/needleRU_i29_0029_0002.caendat
RU = 38.5 Mb/s
LF = 12.0 Mb/s
|
Thu Mar 2 09:49:13 2023, BS, Runs, , General, run 28 started
|
run 28 started |
Sun Feb 26 16:50:56 2023, GJ, Other, , General, proposal
|
|
Fri Mar 10 21:26:55 2023, IP, Problems, , Beam, problem with focus the beam
|
the beam is not the best focused. The operator works on this problem. |
Tue Mar 7 09:41:44 2023, OST, Problems, , Software, number_Ge_15 dedector not taking data
|
after run 45 I reset all spectrums and number_Ge_15 dedector not taking data.
i check the fans_monitor_scaler (EAGLE_array_monitor) monitor and number 15 Ge, number ACS 5 never change the color just staying white there is a problem.
|
Sun Mar 12 03:05:45 2023, GJ, AF, Problems, , Network, no data flux visible in grafena, LF prints "write: Broken pipe"
|
As in the title, see below.
The data are still being constantly written on the disks with usual rate (also visible on grafena).
Greware is also seeing data.
beeper output:
no new data about the growth for 37 s !!!
Noticed at Sun Mar 12 02:50:42 2023
and weirdo scream followed.
LF output:
write: Broken pipe
0-LF_neda_2: 98 ev ( 107153)*30 Tot=26234475 2253/s
write: Broken pipe
0-LF_eagle_1: 881 ev ( 120281)*31 Tot=295856141 24268/s
write: Broken pipe
write: Broken pipe
0-LF_neda_3: 3 ev ( 3909)*5980 Tot=375647125 30917/s
write: Broken pipe
0-LF_neda_1: 92 ev ( 92962)*40 Tot=32523205 2820/s
write: Broken pipe
write: Broken pipe
0-LF_neda_0: 104 ev ( 117997)*33 Tot=38078515 3323/s
0-LF_eagle_0: 720 ev ( 63994)*31 Tot=268339966 22243/s
write: Broken pipe
write: Broken pipe
write: Broken pipe
write: Broken pipe
write: Broken pipe
write: Broken pipe
0-LF_neda_2: 72 ev ( 87376)*31 Tot=26236761 2274/s
write: Broken pipe
0-LF_eagle_1: 714 ev ( 104681)*35 Tot=295880265 23988/s
write: Broken pipe
write: Broken pipe
0-LF_neda_3: 9 ev ( 3988)*5870 Tot=375677518 30545/s
write: Broken pipe
0-LF_neda_1: 93 ev ( 98610)*34 Tot=32525919 2698/s |
Mon Mar 6 00:30:32 2023, MP, ANJ, Other, , Target, new target mounted
|
New target mounted.
106Cd 1 mg/cm2
181Ta 1.2 mg/cm2
Problems in alignment. Offset of 100 um, in spite of the fact that a gap is visible at this distance, and a hair could be moved in between stopper and the target.
Decided to close and pump anyway, after several attempts to improve the alignment.
Stopper same as before, slightly more stretched. |
Fri Mar 10 23:29:43 2023, IP, Problem Fixed, , Software, new run 54
|
the daq resolved at 23:15
start new run: run 54 |
Mon Mar 20 04:55:24 2023, MP, Other, , , missing caendat.bz2 on Bahadir's disk
|
The following caendat.bz2 files were not copied to Bahadir's disks
(because they were not bzipped at the time of the copying):
run_0031_02-03-2023_16h04m28s
-rw-rw-r-- 1 xdaq xdaq 4294971272 Mar 2 16:15 needleRU_i31_0031_0000.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 769385912 Mar 2 16:17 needleRU_i31_0031_0001.caendat.bz2
run_0055_11-03-2023_00h33m38s
-rw-rw-r-- 1 xdaq xdaq 4294970584 Mar 11 20:09 needleRU_i55_0055_0124.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294974732 Mar 11 20:23 needleRU_i55_0055_0125.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294968200 Mar 11 20:33 needleRU_i55_0055_0126.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294969064 Mar 11 20:44 needleRU_i55_0055_0127.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294967332 Mar 11 20:56 needleRU_i55_0055_0128.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294967976 Mar 11 21:10 needleRU_i55_0055_0129.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294984456 Mar 11 21:21 needleRU_i55_0055_0130.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294973384 Mar 11 21:31 needleRU_i55_0055_0131.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294967428 Mar 11 21:42 needleRU_i55_0055_0132.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294968276 Mar 11 21:56 needleRU_i55_0055_0133.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294967576 Mar 11 22:10 needleRU_i55_0055_0134.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294983724 Mar 11 22:26 needleRU_i55_0055_0135.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294967932 Mar 11 22:39 needleRU_i55_0055_0136.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294967564 Mar 11 22:55 needleRU_i55_0055_0137.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294971848 Mar 11 23:05 needleRU_i55_0055_0138.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4046574036 Mar 11 23:14 needleRU_i55_0055_0139.caendat.bz2
run_0058_12-03-2023_04h16m42s
-rw-rw-r-- 1 xdaq xdaq 4295004684 Mar 12 17:25 needleRU_i58_0058_0085.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4295011036 Mar 12 17:33 needleRU_i58_0058_0086.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4295019340 Mar 12 17:42 needleRU_i58_0058_0087.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294975440 Mar 12 17:50 needleRU_i58_0058_0088.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294968176 Mar 12 17:59 needleRU_i58_0058_0089.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294968016 Mar 12 18:09 needleRU_i58_0058_0090.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294968836 Mar 12 18:18 needleRU_i58_0058_0091.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294993728 Mar 12 18:27 needleRU_i58_0058_0092.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4294967436 Mar 12 18:36 needleRU_i58_0058_0093.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 4295074884 Mar 12 18:46 needleRU_i58_0058_0094.caendat.bz2
-rw-rw-r-- 1 xdaq xdaq 3480562784 Mar 12 18:54 needleRU_i58_0058_0095.caendat.bz2
These files were bzipped only on 20/03/2023 |
Mon Mar 13 12:15:35 2023, MP, Other, , , measurement of radioactivity along the beam line
|
At about 12:00, 13/03/2023 (about 17 hours after the beam was stopped), a measurement of activity of the beam line was performed using FH 40G-L10 meter.
Radioctivity run 65 stopped before the measurement, radioactivity run 66 started after the measurement
Background level 120 ns/h
Target, stopper, the forward half of the target chamber - dismounted.
Approximate distance from the target position (upstream), approximate activity
10 cm 500 ns/h
25 cm 420 ns/h
35 350 ns/h
40 350 ns/h
50 200 ns/h
75 170 ns/h
|
Fri Mar 10 20:54:20 2023, IP, Problems, , Beam, lost the beam
|
the beam was lost at 20:46. The operator is working to solve the problem. |
Mon Mar 13 15:16:21 2023, MP, Other, , , list of files copied to Bahadir's disks 
|
Attached are the lists of files copied to the two 4 TB Bahadir's disks.
|
|