Entry  Fri Mar 10 01:32:20 2023, AM, Runs, , General, run 51 stopped 
run 51 stopped


Run number: 51
Start time: Thu Mar 9 16:25:00 2023
Stop time: Fri Mar 10 00:13:21 2023


 

 
Entry  Thu Mar 9 16:25:57 2023, IP, Runs, , General, run 50 stopped 
run 50 - stopped


 
Run number: 50
Start time: Thu Mar 9 00:50:57 2023
Stop time: Thu Mar 9 16:22:37 2023
Entry  Tue Mar 7 23:39:52 2023, IP, KS, Runs, , General, run 46 stopped 
Run 46 - stopped


Run number: 46
Start time: Tue Mar 7 15:09:06 2023
Stop time: Tue Mar 7 23:38:07 2023
Entry  Tue Mar 7 15:12:06 2023, OST, Problems, , Software, run 45 stopped 
14:30 pm to 15:00 run 45 crashed and stopped
Entry  Tue Mar 7 09:20:53 2023, OST, Problem Fixed, , Beam, run 45 start-local filter turn green 
I started run 45, and local filter turn green everything is ok.
Entry  Sun Mar 5 16:58:45 2023, MP, Problems, , Other, run 37 crashed, run 38 junk 
Run 37 stopped by itslelf at 15:43. This was noticed at about 16:10 by observing that grafana data rates do not change.

Stop at Run COntrol.  LF looks  disabled.

Attempt to restart normal way --> run 38  --> failed
Entry  Fri Mar 3 15:04:33 2023, KWL, Other, , General, run 35 stopped  
Run 35 stopped. An attempt to check if we can get 5 MeV  higher beam energy.
Entry  Fri Mar 3 00:09:19 2023, MP, AT, Runs, , , run 35 
Started after beam current was reduced by a factor of 2

plunger run # 116

Earlier:   CUP#6  100 enA
Entry  Thu Mar 2 10:18:14 2023, ost-mgb, Runs, , General, run 29 started 
Run 29 with single gamma trigger

Plunger feedback system is not connected.

Data
Entry  Thu Mar 2 09:49:13 2023, BS, Runs, , General, run 28 started 
run 28 started
Entry  Sun Feb 26 16:50:56 2023, GJ, Other, , General, proposal HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf
 
Entry  Fri Mar 10 21:26:55 2023, IP, Problems, , Beam, problem with focus the beam 
the beam is not the best focused. The operator works on this problem.
Entry  Tue Mar 7 09:41:44 2023, OST, Problems, , Software, number_Ge_15 dedector not taking data 
after run 45 I reset all spectrums and number_Ge_15 dedector not taking data.

i check the fans_monitor_scaler (EAGLE_array_monitor) monitor and number 15 Ge, number ACS 5 never change the color just staying
white there is a problem.
Entry  Sun Mar 12 03:05:45 2023, GJ, AF, Problems, , Network, no data flux visible in grafena, LF prints "write: Broken pipe" 
As in the title, see below.
The data are still being constantly written on the disks with usual rate (also visible on grafena).
Greware is also seeing data.
Entry  Mon Mar 6 00:30:32 2023, MP, ANJ, Other, , Target, new target mounted 
New target mounted.

106Cd 1 mg/cm2

181Ta  1.2 mg/cm2
Entry  Fri Mar 10 23:29:43 2023, IP, Problem Fixed, , Software, new run 54 
the daq resolved at 23:15

start new run: run 54
Entry  Mon Mar 20 04:55:24 2023, MP, Other, , , missing caendat.bz2 on Bahadir's disk 
The following  caendat.bz2 files were not copied to Bahadir's disks 
(because they were not bzipped at the time of the copying):
Entry  Mon Mar 13 12:15:35 2023, MP, Other, , , measurement of radioactivity along the beam line 
At about 12:00, 13/03/2023 (about  17 hours after the beam was stopped), a measurement of activity of the beam line was performed using  FH
40G-L10 meter.

Radioctivity run 65 stopped before the measurement, radioactivity run  66 started after the measurement
Entry  Fri Mar 10 20:54:20 2023, IP, Problems, , Beam, lost the beam 
the beam was lost at 20:46. The operator is working to solve the problem.
Entry  Mon Mar 13 15:16:21 2023, MP, Other, , , list of files copied to Bahadir's disks disk1.list_of_filesdisk2.list_of_files
Attached are the lists of files copied to the two 4 TB Bahadir's disks.

 

 