EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 3 of 14  ELOG logo
Entry  Wed Mar 8 02:45:53 2023, KS, KSz, Other, , Beam, increase in Counting Rates  
Since 2:32 increased counting rate observed:

Sinde 3:45 decrease to 1.5 kHz ch4.

run control = 48
Entry  Wed Mar 1 11:52:48 2023, MP, Runs, , , first beam 
Operators tune beam on the target, collecting run 0023, trigger gg.
Entry  Tue Mar 7 03:21:33 2023, JD, DW, Problem Fixed, , General, daq crash 
daq crashed at 02:59:00, resolved at 03:16:00
 
Entry  Sat Mar 11 09:29:48 2023, EG, Other, , , current exeriment parameters as requested in the manual for shifters 
41_ge_single_theta 101,117,143 looks ok. No peakdeformation of 511, other gammas FWHM around half of that of511 - ok

ch4 in total rate EAGLE_0 arouns 2.1 kHz - ok

planger tollerace limits (green and blue horizontal markers) set far of the current distance, intantionally?
Entry  Thu Mar 2 16:40:45 2023, MP, Runs, , General, changing the plunger distance to minimum. 
Run 31 was stopped, because plunger distance is reduced to the mininimal one.
It takes time, in the meantime, after some break, run 32  was started, with no beam.
Entry  Sun Mar 5 22:32:56 2023, MP, Other, , , change of the target 6x
See pictures in the attachment:

1) stopper seen from the back (upstream view)

2) stopper  seen from the front (downstream view)
Entry  Mon Feb 27 02:49:10 2023, GJ, Runs, , General, calibs - 2x 152Eu - run 0 
Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
Entry  Sun Mar 12 00:09:35 2023, AF, Problem Fixed, , Software, caen_shifted correction in spy & greware 
neda_psdcaen_positions.txt had weird values for three first detectors, especially neda_02.

It was:
Entry  Fri Mar 3 02:23:45 2023, GJ, Problems, , Software, builder gate, TS offsets run_0035_BU_lenghts.png
Data from current run - 35, with limited beam current and rates - see a recent post by Güray.
BU level, so what we see in Greware (both online & nearline).
Attached is the fold of Germaniums.
Entry  Fri Mar 10 08:02:39 2023, AM, Problems, , Beam, bigger data rate  
rate of ch4 above 2kHz, too big beam intesivity, highier data rate from: 07:51
 
Entry  Mon Mar 6 17:19:24 2023, OST, Problems, , Beam, beam unstable and a little high 
16:30 beam increased 5 mb/s to 9 mb/s and stayed 1 hour 9 mb/s

17:10 beam fixed. stable
Entry  Tue Mar 7 20:42:03 2023, IP, Problems, , Beam, beam unstable 
There was a problem with the beam from 20:19 to 20:30.

Now it is fine.
Entry  Wed Mar 8 07:30:15 2023, KS, KSz, Problems, , Beam, beam unstable 
The beam was unstable from 7:18 to 7:25.
Entry  Wed Mar 8 07:57:05 2023, IK, Problems, , Beam, beam unstable Screenshot_2023-03-08_08-17-41.png
The beam was unstable from 7:55. Stabilized around 8:03.

Counting rates are higher, EAGLE det4 went to ~2.5kHZ from ~2kHz (attached).

According to the operator, a bit of a tuning was done, current is 1nA.
Entry  Wed Mar 8 14:47:34 2023, AM, Runs, , Beam, beam unstable 
two drops in beam intesitivity at 14:33, 14:37 and 14:51
Entry  Wed Mar 8 12:11:59 2023, IK, Problem Fixed, , General, beam tuned 
Beam tuning was made, focusing significantly improved.

 

Intensity:
Entry  Thu Mar 2 15:15:40 2023, mgb, Runs, , General, beam stopped. eagle is opened and run 30 continues 
Data

Position = 522.6

Supposed = 520
Entry  Thu Mar 9 13:22:37 2023, OST, Other, , Beam, beam stopped 13:21-13:24 for control 
 
Entry  Fri Mar 3 11:48:29 2023, IP, Runs, , General, beam stopped 
The beam is gone.
Entry  Fri Mar 10 21:29:28 2023, IP, Runs, , Beam, beam start 
the beam starts at 21:27.

But the operators are still working on focusing the beam.
ELOG V3.1.5-fc6679b