EAGLE
IRRADIATIONS
EXTERNAL
Analysis
Students Workshop
Shift Plans
GAMMA-ONLY
NEEDLE NEEDI
COULEX
PLUNGER
GENERAL
HIL102-128Cs
HIL087-176Pt
Nd148_2
176Pt
HIL109-172Os
HIL124-128Cs
HIL061
Nd148
HIL106-119Cs
HIL097-118Xe
HIL099-134Sm
April16
xdaq
HIL099-134Sm, Page 2 of 14
New
|
Find
|
Config
|
Logout
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Runs
Problems
Problem Fixed
Other
264 Entries
Goto page
Previous
1
, 2,
3
...
12
,
13
,
14
Next
All
ID
Date
Author
Type
test
Category
Subject
Text
31
Thu Mar 2 14:59:32 2023
mgb
Runs
General
Data
32
Thu Mar 2 15:15:40 2023
mgb
Runs
General
beam stopped. eagle is opened and run 30 continues
Data
Position = 522.6
Supposed = 520
33
Thu Mar 2 16:06:17 2023
A.T.
Runs
General
Data
Position = 522.6
Supposed = 520
34
Thu Mar 2 16:40:45 2023
MP
Runs
General
changing the plunger distance to minimum.
Run 31 was stopped, because plunger distance
is reduced to the mininimal one.
It takes time, in the meantime, after some
35
Thu Mar 2 17:23:53 2023
BS
Runs
General
Plunger Informations
Plunger Run : 48
Supposed Distance = 10 um
position of the target = 10 um
36
Thu Mar 2 17:25:36 2023
BS
Runs
General
Run 32 Stopped
Run 32 Stopped
37
Thu Mar 2 17:28:21 2023
BS
Runs
Run 33 Started
Run 33 Started
Plunger Run : 48
Supposed Distance = 10 um
38
Thu Mar 2 23:01:21 2023
A.T.
Runs
General
Run 34 started
Run 34 Started (33 was stopped due to acquisition
problems)
Plunger Run : 105
40
Fri Mar 3 00:09:19 2023
MP, AT
Runs
run 35
Started after beam current was reduced
by a factor of 2
plunger run # 116
41
Fri Mar 3 01:15:27 2023
mgb
Runs
General
plunger run # 126
Earlier: CUP#6
42
Fri Mar 3 02:20:46 2023
mgb
Runs
General
plunger run # 137
Beam dump 2.5 enA
44
Fri Mar 3 03:19:34 2023
mgb
Runs
General
plunger run # 147
Beam dump 2.5 enA
45
Fri Mar 3 04:15:32 2023
mgb
Runs
General
plunger run # 157
Beam dump 2.5 enA
46
Fri Mar 3 05:18:35 2023
OST
Runs
General
plunger run # 167
Beam dump 2.5 enA
47
Fri Mar 3 06:24:03 2023
OST
Runs
General
plunger run # 178
Beam dump 2.5 enA
Collimator 0.9 enA
48
Fri Mar 3 07:32:28 2023
OST
Runs
General
plunger run # 188
Beam dump 2.5 enA
Collimator 0.8 enA
49
Fri Mar 3 08:20:13 2023
KWL
Runs
General
plunger run # 196
Beam dump 1 enA (given by operators)
* 7 (following entry ID#39) = 7 enA
50
Fri Mar 3 09:30:15 2023
IP. KWL
Runs
General
plunger run # 208
Beam dump 0.75 enA (given by operators)
* 7 (following entry ID#39) = 5.25 enA
51
Fri Mar 3 10:09:20 2023
IP. KWL
Runs
General
beam intensity decreased to 0.3 enA (at beam dump) on our request
// we noticed yesterday that GE at 143
degrees counts more than those placed at
117 and 101. The 511 keV line (+ background)
52
Fri Mar 3 10:21:18 2023
IP. KWL
Runs
General
beam intensity back to 1.25 enA at the beam dump
we increased beam intensity to 1.25 enA
(readout at the beam dump)
Goto page
Previous
1
, 2,
3
...
12
,
13
,
14
Next
All
ELOG V3.1.5-fc6679b