EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 2 of 14  ELOG logo
ID Date Author Type test Categorydown Subject
  6   Mon Feb 27 12:21:29 2023 MP, BSRuns GeneralList of runs
A list of runs, to be filled during the experiment is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing
  14   Wed Mar 1 19:04:37 2023 BSRunsRunGeneralRun 26 Started

Run 26 Started

 

Beam 9 enA on the collimator

  15   Wed Mar 1 20:10:38 2023 BS, DODOther General 

Run 26 is going on but not much for the moment in terms of any useful data.

And half of the EAGLE is opened.

20:50 EAGLE closed.

  16   Wed Mar 1 21:59:45 2023 MB BSOther General 

Offset of the plunger is 60 um.

new distcal01_vac_after_opening

  17   Thu Mar 2 00:30:29 2023 BS, DODRuns General 

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0011.caendat

 

RU = 5.58 Mb/s

LF = 3.72 Mb/s

  18   Thu Mar 2 04:17:40 2023 DODRuns General 

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0027.caendat

 

RU = 5.10 Mb/s

LF = 3.75 Mb/s

Nothing really to report. The data rates are slowly decreasing from around 3 am. Still observing the frequent sharp minima in the data rates.

  19   Thu Mar 2 05:33:34 2023 ost-dodRuns General 

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0031.caendat

 

RU = 4.70 Mb/s

LF = 3.20 Mb/s

Nothing really to report. The data rates are slowly decreasing from around 3 am. Still observing the frequent sharp minima in the data rates.

  20   Thu Mar 2 07:40:55 2023 ost-dodRuns General 

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0038.caendat

 

RU = 4.48 Mb/s

LF = 4.07 Mb/s

Nothing really to report. The data rates have been fairly constant since around 4 am. Still observing the frequent sharp minima in the data rates.

  22   Thu Mar 2 09:20:17 2023 ost-mgbRuns GeneralRates

Run 27 with single gamma trigger

Plunger feedback system is not conected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0043.caendat

 

RU = 6.25 Mb/s

LF = 4.06 Mb/s

09:15 beam stopped. data saved

  23   Thu Mar 2 09:24:47 2023 ost-mgbRunsRun 27 stoppedGeneral 

Run 27 stopped

  24   Thu Mar 2 09:49:13 2023 BSRuns Generalrun 28 started

run 28 started

  25   Thu Mar 2 10:18:14 2023 ost-mgbRuns Generalrun 29 started

Run 29 with single gamma trigger

Plunger feedback system is not connected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0029_02-03-2023_10h28m22s/needleRU_i29_0029_0002.caendat

 

RU = 38.5 Mb/s

LF = 12.0 Mb/s

 

  26   Thu Mar 2 11:14:44 2023 ost-mgbRuns General 

un 29 with single gamma trigger

Plunger feedback system is not connected.

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0029_02-03-2023_10h28m22s/needleRU_i29_0029_0021.caendat

 

RU = 40.1 Mb/s

LF = 12.5 Mb/s

  28   Thu Mar 2 11:19:06 2023 BSRuns GeneralRun 30 Starts

We hane now g-g trigger started.

Run 30 started

  29   Thu Mar 2 12:09:44 2023 ost-mgbRuns General 

beam stop,

  30   Thu Mar 2 13:50:50 2023 BSRuns GeneralRun 30 Continueed

EAGLE is closed now

We gave a break to test the cable connection of target, degrader, beam dump and collimator.

Run 30 continues to collect data, we did not stop it.

But not much usefull data in it.

  31   Thu Mar 2 14:59:32 2023 mgbRuns General 

 

 

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0030_02-03-2023_11h18m31s/needleRU_i30_0030_0011.caendat

 

RU = 3.53 Mb/s

LF = 2.40 Mb/s

  32   Thu Mar 2 15:15:40 2023 mgbRuns Generalbeam stopped. eagle is opened and run 30 continues

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0030_02-03-2023_11h18m31s/needleRU_i30_0030_0011.caendat

 

RU = 3.53 Mb/s

LF = 2.40 Mb/s

beam off and on and off. eagle is opened and run 30 continues

new cable is stucked

Cable test is going on

  33   Thu Mar 2 16:06:17 2023 A.T.Runs General 

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0031_02-03-2023_11h18m31s/needleRU_i30_0031_0011.caendat

 

RU = 3.53 Mb/s

LF = 2.40 Mb/s

cables to colimeter are checked and replaced.

  34   Thu Mar 2 16:40:45 2023 MPRuns Generalchanging the plunger distance to minimum.
Run 31 was stopped, because plunger distance is reduced to the mininimal one.
It takes time, in the meantime, after some break, run 32  was started, with no beam.
ELOG V3.1.5-fc6679b