EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 14 of 15  ELOG logo
ID Date Author Type test Categorydown Subject Text Attachments
  27   Thu Mar 2 11:17:54 2023 BSRuns  Run 29 stoppedWe will change the trigger and we stopped
the run number 29
  
  37   Thu Mar 2 17:28:21 2023 BSRuns  Run 33 StartedRun 33 Started

Plunger Run : 48

Supposed Distance = 10 um
  
  40   Fri Mar 3 00:09:19 2023 MP, ATRuns  run 35Started after beam current was reduced
by a factor of 2

plunger run # 116
  
  56   Fri Mar 3 13:43:56 2023 IP. KWLRuns  511 annihilation and 279 Au lines in Ge ringsThe counting rate in 511 keV line for sum
of the Ge detectors placed at 101, 117 and
143 degrees (with approved ACS). The largest
 ge_rings101_117_143_acceptedACS_gold_line_279keV.pngge_rings101_117_143_acceptedACS.png 
  91   Sun Mar 5 22:32:56 2023 MPOther  change of the targetSee pictures in the attachment:

1) stopper seen from the back (upstream
view)
 6x 
  228   Sat Mar 11 09:29:48 2023 EGOther  current exeriment parameters as requested in the manual for shifters41_ge_single_theta 101,117,143 looks ok.
No peakdeformation of 511, other gammas FWHM
around half of that of511 - ok
  
  229   Sat Mar 11 10:46:37 2023 EGOtherBeam intensity  ch4 in total rate EGALE_) reached 2.4 kHz,
beam intensity has been reduced to fit the
required 2kHz.
  
  230   Sat Mar 11 11:39:55 2023 EGProblems  Buffers clearingat 11:34:50 sek on 11 march a spike in
counting rate of some Ge detectors is observed.
Buffers not cleared properly?
  
  231   Sat Mar 11 12:42:42 2023 EGOther  Beam intensity reductionAgain beam intensity gradually increased
reaching 2.4 kHz ontotal rate EAGLE_0 ch4. 
Beam intensity reduction requested. 1.8 kHz
  
  232   Sat Mar 11 14:15:55 2023 EGRuns  Beam intensity rapid increase 14:12 beam intensity instability. Rapid
increase of beam intensity - twice the previous
value. Returned to normal after 4 minutes.
  
  233   Sat Mar 11 14:42:28 2023 EGRuns  Beam instabilitiesLarge beam intensity instabilities from
14:10 till 14:40.  Beam intensity reduction
requested. CH4 on Total rate EAGLE_0 returned
  
  234   Sat Mar 11 15:16:31 2023 EGOther  Beam intensity reduced againAgain beam intensity to high. Reduced to
2 kHz on ch4 GE
  
  250   Sun Mar 12 09:15:00 2023 EGOther  Array_monitors mat refresh synchronizationBeam stable, counting rate within limits,
plunger distance within the given tollerance,
gamma spectra ok, everything looks good but....
  
  251   Sun Mar 12 13:20:00 2023 EGProblems  No DataFor a split second a red "NO DATA"
notification appeared in the top right corner
of Counting rates dashboard.
  
  257   Sun Mar 12 20:55:08 2023 MPRuns  runc62 152 for efficiency calibrationstarted

source in the target position,
as precisely as possible
  
  260   Mon Mar 13 12:15:35 2023 MPOther  measurement of radioactivity along the beam lineAt about 12:00, 13/03/2023 (about 
17 hours after the beam was stopped), a measurement
of activity of the beam line was performed
  
  261   Mon Mar 13 12:16:31 2023 MPOther  run 66run 66 started, radiocativity (background)

 
  
  262   Mon Mar 13 15:16:21 2023 MPOther  list of files copied to Bahadir's disksAttached are the lists of files copied
to the two 4 TB Bahadir's disks.

 
 disk1.list_of_filesdisk2.list_of_files 
  263   Thu Mar 16 12:13:11 2023 MPOther  test of radioactivity16/03/2023

Plunger chamber closed, some dummy
target and stopper probably inside
 rings_16mar2023_0905.pngrings143_16mar2023_0908.pngrings143_16mar2023_0920.png 
  264   Mon Mar 20 04:55:24 2023 MPOther  missing caendat.bz2 on Bahadir's diskThe following  caendat.bz2 files were not
copied to Bahadir's disks 
(because they were not bzipped at the time
  
ELOG V3.1.5-fc6679b