EAGLE
IRRADIATIONS
EXTERNAL
Analysis
Students Workshop
Shift Plans
GAMMA-ONLY
NEEDLE NEEDI
COULEX
PLUNGER
GENERAL
HIL102-128Cs
HIL087-176Pt
Nd148_2
176Pt
HIL109-172Os
HIL124-128Cs
HIL061
Nd148
HIL106-119Cs
HIL097-118Xe
HIL099-134Sm
April16
xdaq
HIL099-134Sm, Page 4 of 14
New
|
Find
|
Config
|
Logout
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Runs
Problems
Problem Fixed
Other
264 Entries
Goto page
Previous
1
,
2
,
3
, 4,
5
...
12
,
13
,
14
Next
All
ID
Date
Author
Type
test
Category
Subject
Text
11
Wed Mar 1 12:51:33 2023
MP
Runs
Beam
beam on the target
Beam on the target:
target+stopper+beam dump: 25 enA (1.7 pnA)
51
Fri Mar 3 10:09:20 2023
IP. KWL
Runs
General
beam intensity decreased to 0.3 enA (at beam dump) on our request
// we noticed yesterday that GE at 143
degrees counts more than those placed at
117 and 101. The 511 keV line (+ background)
52
Fri Mar 3 10:21:18 2023
IP. KWL
Runs
General
beam intensity back to 1.25 enA at the beam dump
we increased beam intensity to 1.25 enA
(readout at the beam dump)
57
Fri Mar 3 13:54:41 2023
IP. KWL
Runs
General
beam energy measurement
beam stop due to the beam energy measurement
The beam energy: ~145 MeV
9
Wed Mar 1 00:14:28 2023
MP
Other
Beam
beam energy
Beam energy measured: 148.2 MeV
Mind that this may be an overestimate (by
~1-2 MeV)
171
Wed Mar 8 19:01:49 2023
OST
Runs
General
beam current was very low and beam increased after this entry
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0064.caendat
RU = 5.75 MB/s
8
Tue Feb 28 23:10:36 2023
BS
Other
What we need to include for Plunger
Plunger Run :
Micrometer :
Supposed Distance:
175
Thu Mar 9 01:41:50 2023
GJ
Problem Fixed
Hardware
TS zeroing - cables to S-IN from VME controller - between runs 49 and 50
Since we were observing jumps of 16 ns in
timings of all channels of whole boards,
the assumption was that the
21
Thu Mar 2 09:05:43 2023
DOD
Problems
Sulphur on aluminium fusion-evaporation reactions
Using the data which we've sorted
to date, I looked into the gamma-gamma coincidences
and have identified a number of nuclei e.g.
7
Tue Feb 28 23:08:35 2023
BS
Other
SHIFT LIST
https://docs.google.com/spreadsheets/d/1e2homI9RCYrg369z8aaY3VMIPgapUPOv0zKISsl58vQ/edit?usp=sharing
138
Tue Mar 7 14:39:08 2023
BS
Other
General
Runlist File ScreenShot Accesses on 07 MArch at 14:38
136
Tue Mar 7 14:07:33 2023
BS
Other
General
Run Files Number
/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleRU_i45_0045_0027.caendat
/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleLF_i44_0045_0010.adf
254
Sun Mar 12 19:00:59 2023
OST
Runs
General
Run 58 stopped and Run 59 started.
18:54 Run 58 stopped and 18:55 Run 59 started.
BEAM STOPPED.
END of EXPERIMENT.
247
Sun Mar 12 04:20:19 2023
OST
Runs
General
Run 57 stopped, Run 58 started
227
Sat Mar 11 00:34:51 2023
BS
Runs
General
Run 55 Started New Distance 500 um
Run 55 Started New Distance 500 um
160
Wed Mar 8 10:31:10 2023
IK
Runs
General
Run 49
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0008.caendat
RU = 10.6 MB/s
161
Wed Mar 8 11:42:14 2023
IK
Problems
General
Run 49
Counting rates continued to increase (det4
> 3kHz). Beam current looked fine on the
beam dump, but beam is fluctuating, and can
163
Wed Mar 8 13:02:38 2023
IK
Runs
General
Run 49
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0030.caendat
RU = 7.86 MB/s
158
Wed Mar 8 09:31:43 2023
IK
Runs
General
Run 48 stopped, run 49 started
Run 48 stopped at 9:29 to start a new run.
Run 49 is started okay at 9:31.
154
Wed Mar 8 04:24:40 2023
KS, KSz
Runs
General
Run 48
run control = 48
run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0017.caendat
RU = 5.75 MB/s
Goto page
Previous
1
,
2
,
3
, 4,
5
...
12
,
13
,
14
Next
All
ELOG V3.1.5-fc6679b