EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 4 of 14  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Type testdown Category Subject
  60   Fri Mar 3 16:47:29 2023 IKRuns GeneralRun 36 started

Run 36 Started

New Beam energy is 150 MeV

The beam dumb currennt is 2.5 enA.

Plunger run = 282

 

  61   Fri Mar 3 17:52:41 2023 IKProblem Fixed HardwareBeamdump readout issue - solved

Current readout issues from beamdump. Beam stopped from 17:46-17:52, run 36 ongoing.

MP & GJ checking the grounding and connection the beamdump readout. No visible issue found in the exp hall, but copper grounding wire was tightened, which seemingly resolved the issue (stability of beamdump readout).   

  62   Fri Mar 3 19:41:27 2023 IKProblems HardwareBeamdump readout issue Vol.2.

Issue described in #61 continues to persist.

Beam stopped from 19:20 to 19:32, run 36 ongoing; MP, GJ, BS entering the experimental hall. 

They changed the position of the grounding point on the chamber, moving it downstream after a fitting/joining part (A to B on the attached picture [artist: GJ]).

 

Attachment 1: 333626140_152534624340296_7230383118242592907_n.jpg
333626140_152534624340296_7230383118242592907_n.jpg
  63   Fri Mar 3 20:50:31 2023 IK, MP, GJOther Data analysisGe spectra

Ge rates increasing, similar to what it was 24h before. Asking to decrease beam intensity by a factor of 2.

Attached Ge spectra before decreasing.
 

Before decreas beam current was 1.75enA, afterwards 1.1enA.

Attachment 1: ge_rings101_117_143_Screenshot_2023-03-03_20-44-07.png
ge_rings101_117_143_Screenshot_2023-03-03_20-44-07.png
Attachment 2: Ge_rates_too_high.png
Ge_rates_too_high.png
  64   Fri Mar 3 23:38:28 2023 SPRuns GeneralHow different Ge count

All germanium detecors look reasonable, as attached.

Attachment 1: ge_en_cal_230303_2337.png
ge_en_cal_230303_2337.png
  65   Sat Mar 4 08:27:23 2023 OSTRuns General 

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0087.caendat

RU = 4.57

LF = 3.11

Plunger ;

Planger run = 437

Supposed Dist=10

Micrometer = 10.1

Position = 10.4

Voltage = 7.923

Beam dumb = 0.75 nA

Collimeter =0.5 nA

Everythings is looking stable.

  66   Sat Mar 4 09:51:32 2023 OSTRuns General 

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0094.caendat

RU = 6.43

LF = 3.45

Plunger ;

Planger run = 452

Supposed Dist=10

Micrometer = 10.4

Position = 10.4

Voltage = 7.926

Beam dumb = 1 nA

Collimeter =0.5 nA

Everythings is looking stable.

  67   Sat Mar 4 11:06:31 2023 OSTRuns General 

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0100.caendat

RU = 6.03

LF = 3.36

Plunger ;

Planger run = 465

Supposed Dist=10

Micrometer = 10.5

Position = 10.5

Voltage = 7.91

Beam dumb = 0.75 nA

Collimeter =0.6 nA

Everythings is looking stable.

  68   Sat Mar 4 12:34:52 2023 OSTRuns General 

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0107.caendat

RU = 6.17

LF = 3.25

Plunger ;

Planger run = 479

Supposed Dist=10

Micrometer = 10.6

Position = 10.5

Voltage = 7.908

Beam dumb = 0.8 nA

Collimeter =0.7 nA

Everythings continues to stable.

  69   Sat Mar 4 13:43:20 2023 OSTRuns General 

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0114.caendat

RU = 7.30

LF = 3.70

Plunger ;

Planger run = 491

Supposed Dist=10

Micrometer = 10.9

Position = 10.4

Voltage = 7.924

Beam dumb = 1 nA

Collimeter =0.7 nA

Everythings continues to stable.

  70   Sat Mar 4 15:02:54 2023 mgbRuns Generalrunning stable

RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0122.caendat

RU = 5.99

LF = 3.35

Plunger ;

Planger run = 504

Supposed Dist=10

Micrometer = 11.1

Position = 10.2

Voltage = 8.964

Beam dumb = 1 nA

Collimeter =0.7 nA

  71   Sat Mar 4 16:06:19 2023 mgbRuns General 

RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0127.caendat

RU = 6.25

LF = 3.39

Plunger ;

Planger run = 515

Supposed Dist=10 um

Actual Distance = 9.7 um

Position = 10.3 um

Voltage = 7.938 V

Beam dumb = 1 nA

Collimeter =0.7 nA

  72   Sat Mar 4 17:09:13 2023 mgbRuns General 

RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0133.caendat

RU = 6.45 MB/s

LF = 3.45 MB/s

Plunger ;

Planger run = 525

Supposed Dist=10 um

Actual Distance = 9.8 um

micrometer = 11.2 um

Position = 10.1 um

Voltage = 7.943 V

Beam dumb = 1 nA

Collimeter =0.7 nA

  73   Sat Mar 4 18:02:48 2023 mgbRuns General 

UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0138.caendat

RU = 6.39 MB/s

LF = 3.42 MB/s

Plunger ;

Planger run = 534

Supposed Dist=10 um

Actual Distance = 9.9 um

micrometer = 11.4 um

Position = 10.3 um

Voltage = 7.933 V

Beam dumb = 1 nA

Collimeter =0.7 nA

  74   Sat Mar 4 19:14:30 2023 AFRuns General 

AF

UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0144.caendat

RU = 6.46 MB/s

LF = 3.48 MB/s

Plunger ;

Planger run = 546

Supposed Dist=10 um

Actual Distance = 10 um

micrometer = 11.4 um

Position = 10.4 um

Voltage = 7.923 V

Beam dumb = 1 nA

Collimeter =0.7 nA

  75   Sat Mar 4 20:56:40 2023 AFRuns General 

AF

UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0154.caendat

RU = 5.91 MB/s

LF = 3.43 MB/s

Plunger ;

Planger run = 563

Supposed Dist=10 um

Actual Distance = 9.8 um

micrometer = 11.0 um

Position = 10.1 um

Voltage = 7.947 V

Beam dumb =

Collimeter =

 

Stopped at 10.51 pm

Plan: change the distance between the target and the stopper

Plunger run nr at stop: 582

beam current at stop: 0.9 enA at the beam dump

 

  76   Sat Mar 4 23:28:16 2023 AFRuns General 

AF

UN CONTROL = 37

Run Data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0000.caendat

RU = 5.91 MB/s

LF = 3.43 MB/s

Plunger ;

Planger run = 585

Supposed Dist=240 um

Actual Distance = 240 (+60) um

Position = 240.9 um

Voltage = 2.717 V

Beam dumb = 0.75 - 1.0 enA

Collimeter = 0.75-1.0 enA

 

  77   Sun Mar 5 00:08:06 2023 AFRuns General 

AF

UN CONTROL = 37

Run Data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0005.caendat

RU = 5.38 MB/s

LF = 3.30 MB/s

Plunger ;

Planger run = 596

Supposed Dist=240 um

Actual Distance = 240 um

Position = 240.8 um

Voltage = 2.716 V

Beam dumb =

Collimeter =

 

  78   Sun Mar 5 01:26:58 2023 JD DWRuns General 

UN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0010.caendat

RU =  6.96 MB/s

LF = 3.65 MB/s

Plunger ;

Planger run = 607

Supposed Dist= 240 um

Actual Distance =  240.1 um

micrometer = 186.4 um

Voltage =  2.719 V

Beam dumb = 0.75 nA

Collimeter = 0.55nA

  79   Sun Mar 5 02:06:40 2023 JD DWRuns General 

UN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0017.caendat

RU =  7.86 MB/s

LF =  3.88 MB/s

Plunger ;

Planger run = 616

Supposed Dist= 240 um

Actual Distance =  239.8 um

micrometer = 185.9 um

Voltage =  2.721 V

Beam dumb = 0.75 nA

Collimeter = 0.5nA

ELOG V3.0.0-21dc563

ELOG V3.1.5-fc6679b