  11   Wed Mar 1 12:51:33 2023 MPRuns Beambeam on the targetBeam on the target:

target+stopper+beam dump: 25 enA   (1.7 pnA)
  
  51   Fri Mar 3 10:09:20 2023 IP. KWLRuns Generalbeam intensity decreased to 0.3 enA (at beam dump) on our request // we noticed yesterday that GE at 143
degrees counts more than those placed at
117 and 101. The 511 keV line (+ background)
 Ge_beamInten_03enA_differentYscale.pngGe_beamInten_03enA_sameYscale.png 
  52   Fri Mar 3 10:21:18 2023 IP. KWLRuns Generalbeam intensity back to 1.25 enA at the beam dumpwe increased beam intensity to 1.25 enA
(readout at the beam dump)
  
  57   Fri Mar 3 13:54:41 2023 IP. KWLRuns Generalbeam energy measurementbeam stop due to the beam energy measurement

The beam energy: ~145 MeV
  
  9   Wed Mar 1 00:14:28 2023 MPOther Beambeam energyBeam energy measured:  148.2 MeV
Mind that this may be an overestimate (by
~1-2 MeV)
  
  171   Wed Mar 8 19:01:49 2023 OSTRuns Generalbeam current was very low and beam increased after this entryrun control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0064.caendat

RU =  5.75 MB/s
  
  8   Tue Feb 28 23:10:36 2023 BSOther  What we need to include for PlungerPlunger Run :

Micrometer :

Supposed Distance:
  
  175   Thu Mar 9 01:41:50 2023 GJProblem Fixed HardwareTS zeroing - cables to S-IN from VME controller - between runs 49 and 50Since we were observing jumps of 16 ns in
timings of all channels of whole boards,
the assumption was that the 
  
  21   Thu Mar 2 09:05:43 2023 DODProblems  Sulphur on aluminium fusion-evaporation reactionsUsing  the data which we've sorted
to date, I looked into the gamma-gamma coincidences
and have identified a number of nuclei e.g.
  
  7   Tue Feb 28 23:08:35 2023 BSOther  SHIFT LISThttps://docs.google.com/spreadsheets/d/1e2homI9RCYrg369z8aaY3VMIPgapUPOv0zKISsl58vQ/edit?usp=sharing

  
  138   Tue Mar 7 14:39:08 2023 BSOther GeneralRunlist File ScreenShot Accesses on 07 MArch at 14:38   Screenshot_2023-03-07_14-37-51.png 
  136   Tue Mar 7 14:07:33 2023 BSOther GeneralRun Files Number/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleRU_i45_0045_0027.caendat

/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleLF_i44_0045_0010.adf
  
  254   Sun Mar 12 19:00:59 2023 OSTRuns GeneralRun 58 stopped and Run 59 started.18:54 Run 58 stopped and 18:55 Run 59 started.

BEAM STOPPED.

END of EXPERIMENT.
  
  247   Sun Mar 12 04:20:19 2023 OSTRuns GeneralRun 57 stopped, Run 58 started     
  227   Sat Mar 11 00:34:51 2023 BSRuns GeneralRun 55 Started New Distance 500 umRun 55 Started New Distance 500 um   
  160   Wed Mar 8 10:31:10 2023 IKRuns GeneralRun 49run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0008.caendat

RU =  10.6 MB/s
  
  161   Wed Mar 8 11:42:14 2023 IKProblems GeneralRun 49Counting rates continued to increase (det4
> 3kHz). Beam current looked fine on the
beam dump, but beam is fluctuating, and can
 Screenshot_2023-03-08_11-38-47.pngScreenshot_2023-03-08_11-38-19.pngScreenshot_2023-03-08_11-37-37.png 
  163   Wed Mar 8 13:02:38 2023 IKRuns GeneralRun 49run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0030.caendat

RU =  7.86 MB/s
  
  158   Wed Mar 8 09:31:43 2023 IKRuns GeneralRun 48 stopped, run 49 startedRun 48 stopped at 9:29 to start a new run.

Run 49 is started okay at 9:31.

 
  
  154   Wed Mar 8 04:24:40 2023 KS, KSzRuns GeneralRun 48run control = 48

run data =  /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0017.caendat

RU =  5.75 MB/s
  