EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 5 of 14  ELOG logo
Entry  Sun Mar 5 06:03:26 2023, JD DW, Runs, , General,  

UN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0043.caendat

RU =  7.65 MB/s

LF =  3.86 MB/s

Plunger ;

Plunger run = 656

Supposed Dist=   240 um

Actual Distance = 239.3  um

micrometer =   186.1 um

Voltage =    2.725 V

Beam dumb = 1 nA

Collimeter = 0.75 nA

Entry  Sun Mar 5 07:12:49 2023, JD DW, Runs, , General,  

RUN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0051.caendat

RU =   8.02 MB/s

LF =   3.97 MB/s

Plunger ;

Plunger run = 667

Supposed Dist=   240 um

Actual Distance = 238.8 um

micrometer =  186.0 um

Voltage =   2.723  V

Beam dumb = 1 nA

Collimeter = 0.75 nA

Entry  Sun Mar 5 08:54:08 2023, OST, Runs, , General,  

RUN CONTROL = 37

Data = /onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0061.caendat

RU = 8.12

LF = 3.94

Plunger ;

Planger run = 683

Supposed Dist=240

Micrometer = 186.4

Position = 239.9

Voltage = 2.724

Beam dumb = 1 nA

Collimeter =2.5 nA

Everything is stable.

Entry  Sun Mar 5 10:17:03 2023, OST, Runs, , General,  

RUN CONTROL = 37

Data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0072.caendat

RU = 8.01

LF = 4.02

Plunger ;

Planger run = 698

Supposed Dist=240

Micrometer = 186.9

Position = 240.8

Voltage = 2.72

Beam dumb = 1 nA

Collimeter =0.7 nA

Everything is stable.

Entry  Sun Mar 5 11:45:36 2023, OST, Runs, , General,  

RUN CONTROL = 37

Data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0082.caendat

RU = 8.50

LF = 4.14

Plunger ;

Planger run = 712

Supposed Dist=240

Micrometer = 187.6

Position = 241.3

Voltage = 2.714

Beam dumb = 1 nA

Collimeter =0.8 nA

Everything is stable.

Entry  Sun Mar 5 13:52:34 2023, OST, Runs, , General,  

RUN CONTROL = 37

Data = /onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0097.caendat

RU = 8.17

LF = 4.04

Plunger ;

Planger run = 733

Supposed Dist=240

Micrometer = 187.6

Position = 241.3

Voltage = 2.715

Beam dumb = 1 nA

Collimeter =0.8 nA

Everything is stable

Entry  Sun Mar 5 15:07:24 2023, mgb, Runs, , General, Beam dump decreased 1.0 nA to 0.75 

RUN CONTROL = 37

Data = /onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0106.caendat

RU = 8.65 MB/s

LF = 4.11 MB/s

Plunger ;

Planger run = 745

Supposed Dist=240 um

Micrometer = 187.5 um

Position = 241.1 um

Actual distance = 240.6 um

Voltage = 2.715 V

Beam dumb = 0.75 nA

Collimeter =0.65 nA

 

Entry  Mon Mar 6 00:43:27 2023, BS, GJ, Runs, , General, Run 40 Started LocalFilter.conf

Before this run TSs were moved on the LF level, so the BU has easier job to do and everything is more stable.

BU gate was changed from 1500 to 500 ns, this stay valid from now on.

 

 

Run 40 Started.

New target

Offset 100 um

RUN CONTROL = 40

Data = /onlineNEDA_00/xData/hil099/run_0040_06-03-2023_00h38m10s/needleRU_i40_0040_0000.caendat

RU = 7.21 MB/s

LF = 3.55 MB/s

Plunger ;

Planger run = 8

0-Point = 232, 7 um

Supposed Distance = 234,7 um

Micrometer = 187.5 um

Position = 241.1 um

Actual Distance = 234,5 um

Voltage =4,106V

Beam dumb =

Collimeter =

Entry  Mon Mar 6 01:00:29 2023, BS, Runs, , General, Run 40 stooped 

Run 40 stooped

Entry  Mon Mar 6 01:01:26 2023, BS, Runs, , General, Run 41 started 

Run 41 started

Plunger distance 10 um

Entry  Mon Mar 6 01:10:59 2023, JD, DW, Runs, , General,  

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0000.caendat

RU = 6.23 MB/s

LF = 3.55 MB/s

Plunger ;

Planger run = 16

Supposed Dist= 242.7 um

Micrometer =  242.7um

Position =  9.7 um

Actual distance = 242.4um

Voltage =  3.824V

Beam dumb = 2.75 nA

Collimeter = 0.8 nA

Entry  Mon Mar 6 02:13:32 2023, JD, DW, Runs, , General,  

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0007.caendat

RU =  7.55 MB/s

LF = 3.79 MB/s

Plunger ;

Planger run = 27

Supposed Dist= 242.7 um

Micrometer =  243.6 um

Position =  9.6 um

Actual distance = 242.3 um

Voltage =  3.825 V

Beam dumb = 2.5 nA

Collimeter = 0.9 nA

Entry  Mon Mar 6 03:17:48 2023, JD, DW, Runs, , General,  

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0014.caendat

RU =   6.94 MB/s

LF =  3.62 MB/s

Plunger ;

Planger run = 38

Supposed Dist=  242.7um

Micrometer =  244.2 um

Position =  9.6 um

Actual distance = 242.4 um

Voltage =  3.822 V

Beam dumb =  2.5 nA

Collimeter = 0.85 nA

Entry  Mon Mar 6 04:17:48 2023, JD, DW, Runs, , General,  

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0020.caendat

RU =    7.26 MB/s

LF =   3.72 MB/s

Plunger ;

Plunger run = 47

Supposed Dist= 242.7 um

Micrometer =  244.5 um

Position =   9.6 um

Actual distance =  242.3 um

Voltage =   3.826 V

Beam dumb =  2.5 nA

Collimeter =  0.8 nA

Entry  Mon Mar 6 05:21:16 2023, JD DW, Runs, , General,  

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0026.caendat

RU =    8.24 MB/s

LF =   3.96 MB/s

Plunger ;

Plunger run = 58

Supposed Dist= 242.7 um

Micrometer =   245.0um

Position =    9.9 um

Actual distance =242.5  um

Voltage =    3.816V

Beam dumb =  2.5 nA

Collimeter =  1.1 nA

Entry  Mon Mar 6 06:11:51 2023, JD, DW, Runs, , General,  

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0031.caendat

RU =    7.58 MB/s

LF =   3.76 MB/s

Plunger ;

Plunger run = 67

Supposed Dist= 242.7 um

Micrometer =   245.4 um

Position =    9.9 um

Actual distance =242.6  um

Voltage =    3.814 V

Beam dumb =  2.5 nA

Collimeter =  1 nA

Entry  Mon Mar 6 07:19:01 2023, JD, DW, Runs, , General,  

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0038.caendat

RU =  6.46 MB/s

LF =   3.53 MB/s

Plunger ;

Plunger run = 78

Supposed Dist= 242.7 um

Micrometer =   245.5 um

Position =    10.0 um

Actual distance = 242.7 um

Voltage =  3.808  V

Beam dumb =  2.0 nA

Collimeter =   1.25 nA

Entry  Mon Mar 6 08:10:32 2023, JD, Runs, , General,  

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0043.caendat

RU =   7.3 MB/s

LF =   3.65 MB/s

Plunger ;

Plunger run = 86

Supposed Dist= 242.7 um

Micrometer =  245.3  um

Position =   9.7  um

Actual distance = 242.4 um

Voltage =  3.821  V

Beam dumb =  1.25 nA

Collimeter = 0.75  nA

Entry  Mon Mar 6 09:19:41 2023, OST, Runs, , General,  

RUN CONTROL = 41

Data =/onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0050.caendat

RU =   8.13 MB/s

LF =   4.21 MB/s

Plunger ;

Plunger run = 98

Supposed Dist= 242.7 um

Micrometer =  245.8 um

Position =   9.7  um

Actual distance = 242.4 um

Voltage =  3.821  V

Beam dumb =  2 nA

Collimeter = 2  nA

Entry  Mon Mar 6 10:02:47 2023, OST, Problem Fixed, , General, New run started 42 

RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0000.caendat

           /onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleLF_i41_0042_0000.adf

RU =   6.01 MB/s

LF =   3.32 MB/s

Plunger ;

Plunger run = 105

Supposed Dist= 242.7 um

Micrometer =  246.1 um

Position =   9.9  um

Actual distance = 242.6 um

Voltage =  3.809  V

Beam dumb =  1.5 nA

ELOG V3.1.5-fc6679b