EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 6 of 14  ELOG logo
ID Date Author Type test Category Subjectdown
  239   Sat Mar 11 19:14:35 2023 BSRuns GeneralRates

Run files /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0114.caendat

Beam Dump = 0.7 nA

Run number 55

Plunger Distance = 500 um + offset

Plunger run 1402

Voltage 1.369 V

Attachment 1: Screenshot_2023-03-11_19-11-45.png
Screenshot_2023-03-11_19-11-45.png
Attachment 2: Screenshot_2023-03-11_19-11-24.png
Screenshot_2023-03-11_19-11-24.png
  241   Sat Mar 11 22:27:08 2023 BSRuns GeneralRates

Rates 22:18 367Hz

Rates 22:22 4.78 kHz

And Now see the figure

 

Attachment 1: Screenshot_2023-03-11_22-26-22.png
Screenshot_2023-03-11_22-26-22.png
  137   Tue Mar 7 14:23:43 2023 BSOther GeneralRU and BU Rates
Attachment 1: Screenshot_2023-03-07_14-22-35.png
Screenshot_2023-03-07_14-22-35.png
  195   Fri Mar 10 01:28:48 2023 AMProblems OtherPlunger distance

longer break during chane of plunger distance due to technical problem, you can not move plunger to larger distances, so now we are choosing smaller distance in the morning we ask the specialists
 

  259   Sun Mar 12 22:52:36 2023 Bahadir SaygiOther GeneralPlunger Run Files

Plunger run files for later to calculate error in the distance

Attachment 1: 134Sm_cont.zip
Attachment 2: 134Sm.zip
  5   Mon Feb 27 12:13:03 2023 MBOther  Plunger Informations

Off set of the plunger ~60 um

Distcal file   distcal01_vac

 

  35   Thu Mar 2 17:23:53 2023 BSRuns GeneralPlunger Informations

Plunger Run : 48

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 6.5 um

Voltage = 7.957 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
 

  100   Mon Mar 6 05:15:43 2023 JD, DWProblems BeamNo beam 05:10:00

No beam 05:10:00

  251   Sun Mar 12 13:20:00 2023 EGProblems  No Data

For a split second a red "NO DATA" notification appeared in the top right corner of Counting rates dashboard.

It looks like it did not change anything in data collection.


 

  174   Thu Mar 9 01:07:48 2023 WPRuns GeneralNew run started 50 (distance change)

run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0000.caendat

 

RU =  7.43MB/s

LF =   3.61 MB/s

plunger:

plunger run = 736

actual distance =  533 um

supposed distance = 532.7 um

micrometer =   533.5 um

position =  300 um

voltage =  1.657 V

 

Beam dump: 1-1.5 enA (oscillating)

Colimator :  0.6 enA

 

  152   Wed Mar 8 01:24:58 2023 KS, KSzRuns GeneralNew run started 48 (new distance)

run control = 48

run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0000.caendat

RU =  5.09 MB/s

LF =   3.15 MB/s

plunger:

plunger run = 498

actual distance =  382.7 um

supposed distance = 382.7 um

micrometer =   383.4 um

position =  149.7 um

voltage =  2.146 V

 

Beam dump =  0.7 nA

Collimater=  0.5 nA

  119   Tue Mar 7 00:54:40 2023 JD, DWRuns GeneralNew run started 43

run control = 43

run data = /onlineNEDA_00/xData/hil099/run_0043_07-03-2023_00h50m41s/needleRU_i43_0043_0000.caendat

RU =  7.13 MB/s

LF = 3.7 MB/s

plunger:

plunger run = 254

actual distance = 282.7 um

supposed distance = 282.7 um

micrometer = 285.2 um

position = 50 um

voltage = 2.966 V

Beam dump =  1 nA

Collimater= 0.5 nA

 

 

  108   Mon Mar 6 10:02:47 2023 OSTProblem Fixed GeneralNew run started 42

RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0000.caendat

           /onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleLF_i41_0042_0000.adf

RU =   6.01 MB/s

LF =   3.32 MB/s

Plunger ;

Plunger run = 105

Supposed Dist= 242.7 um

Micrometer =  246.1 um

Position =   9.9  um

Actual distance = 242.6 um

Voltage =  3.809  V

Beam dumb =  1.5 nA

  6   Mon Feb 27 12:21:29 2023 MP, BSRuns GeneralList of runs
A list of runs, to be filled during the experiment is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing
  2   Sun Feb 26 17:26:45 2023 GJOther GeneralList of participants

To be filled in, with affiliation and email.

Presumably, for later publication purposes.
 

Alphabetically by family name, please.

Budak, Mustafa Guray - Gazi University, mbudak@gazi.edu.tr

Ciemała, Michał - IFJ PAN, Kraków, Poland - Michal.Ciemala@ifj.edu.pl

Deary, James, - University of West of Scotland - james.deary@uws.ac.uk

Fijałkowska, Aleksandra,  aleksandra.fijalkowska@fuw.edu.pl

Fransen' Christoph IKP JOELN  fransen@ikp.uni-koeln.de

Goasduff, Alain - INFN-LNL alain.goasduff@lnl.infn.it

Grębosz, Jurek - IFJ PAN, Kraków, Poland

Jaworski, Grzegorz - HIL UW, Poland - tatrofil@slcj.uw.edu.pl

O'Donnell, David - University of West of Scotland - david.odonnell@uws.ac.uk

Palacz, Marcin - HIL UW, Poland - palacz@slcj.uw.edu.pl

Piętka, Iwona - Faculty of Physics, UW - iz.pietka@student.uw.edu.pl

Poklepa, Wiktor - UW, Poland, w.poklepa@student.uw.edu.pl

Saygi, Bahadir - Ankara University, Turkey - bahadir.saygi@ankara.edu.tr

Solak, Krzysztof - UW Poland, krzysztof.solak@post.pl

Szlęzak, Klara - UW, Poland, k.szlezak@student.uw.edu.pl

Temiz, Omer Sefa - Ankara University, Turkey - omer.temiz.95@gmail.com

White, Dylan, - University of West of Scotland - dylan.white@uws.ac.uk

 

 

 

 

  64   Fri Mar 3 23:38:28 2023 SPRuns GeneralHow different Ge count

All germanium detecors look reasonable, as attached.

Attachment 1: ge_en_cal_230303_2337.png
ge_en_cal_230303_2337.png
  169   Wed Mar 8 17:59:38 2023 BSRuns GeneralGeneral

run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0058.caendat

RU =  9.83 MB/s

LF =   4.87 MB/s

plunger:

plunger run = 665

actual distance =  382.7 um

supposed distance = 382.7 um

micrometer =   384.4 um

position =  150.0 um

voltage =  2.148 V

 

Beam dump 1,25 ~ 1.5  nA

  176   Thu Mar 9 02:14:09 2023 WPRuns GeneralGeneral

run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0008.caendat

 

 

RU =  7.24 MB/s

LF =   3.64 MB/s

plunger:

plunger run = 748

actual distance =  532.1 um

supposed distance = 532.7 um

micrometer =   532.9 um

position =  299.4 um

voltage =  1.66 V

 

Beam dump: 1-1.5 enA (oscillating)

Colimator :  0.6 enA

 

  177   Thu Mar 9 03:14:39 2023 WPRuns GeneralGeneral

run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0015.caendat

 

 

RU =  6.91 MB/s

LF =   3.48 MB/s

plunger:

plunger run = 758

actual distance =  533.5 um

supposed distance = 532.7 um

micrometer =   533.1 um

position =  300.9 um

voltage =  1.658 V

 

Beam dump: 1-1.5 enA (oscillating)

Colimator :  0.6 enA

 

  178   Thu Mar 9 04:17:21 2023 WPRuns GeneralGeneral

run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0022.caendat

 

 

RU =  7.48 MB/s

LF =   3.59 MB/s

plunger:

plunger run = 769

actual distance =  531.1 um

supposed distance = 532.7 um

micrometer =   533.7 um

position =  300.5 um

voltage =  1.655 V

 

Beam dump: 1-1.5 enA (oscillating)

Colimator :  0.6 enA

 

ELOG V3.1.5-fc6679b