| ID |
Date |
Author |
Type |
test |
Category |
Subject |
|
149
|
Wed Mar 8 00:31:05 2023 |
KS, KSz | Runs | | General | Run 47 standard info |
run control = 47
run data = /onlineNEDA_00/xData/hil099/run_0047_07-03-2023_23h42m03s/needleRU_i47_0047_0003.caendat
RU = 5.12 MB/s
LF = 3.32 MB/s
plunger:
plunger run = 491
actual distance = 282.9 um
supposed distance = 282.7 um
micrometer = 285.12 um
position = 50.2 um
voltage = 2.963 V
Beam dump = 0.7 nA
Collimater= 0.5 nA |
|
151
|
Wed Mar 8 01:24:04 2023 |
BS | Runs | | General | Run 47 Stopped to Change Distance Change |
Run 47 stopped and distance changed from 50 um (+ 100 um offset) to 150 um (+ 100 um offset)
Last plunger run for 50 um (+ 100 um offset) is 495 |
|
140
|
Tue Mar 7 15:14:29 2023 |
OST | Problem Fixed | | Software | Run 46 started-15_Ge and number 5 anticompton working now. |
VME crate with CAEN digitizers was rebooted.
Run 46 started, number 15_Ge and number 5 anticompton dedector working now.
|
|
122
|
Tue Mar 7 03:26:54 2023 |
JD, DW | Runs | | General | Run 44 started |
run control = 44
run data =/onlineNEDA_00/xData/hil099/run_0044_07-03-2023_03h15m45s/needleRU_i44_0044_0000.caendat
RU = 6.46 MB/s
LF = 3.39 MB/s
plunger:
plunger run = 279
actual distance = 282.7 um
supposed distance = 282.7 um
micrometer = 285.1 um
position = 49.9 um
voltage = 2.966 V
Beam dump = 0.7-1 nA
Collimater= 0.5 nA |
|
95
|
Mon Mar 6 01:01:26 2023 |
BS | Runs | | General | Run 41 started |
Run 41 started
Plunger distance 10 um |
|
94
|
Mon Mar 6 01:00:29 2023 |
BS | Runs | | General | Run 40 stooped |
Run 40 stooped |
|
93
|
Mon Mar 6 00:43:27 2023 |
BS, GJ | Runs | | General | Run 40 Started |
Before this run TSs were moved on the LF level, so the BU has easier job to do and everything is more stable.
BU gate was changed from 1500 to 500 ns, this stay valid from now on.
Run 40 Started.
New target
Offset 100 um
RUN CONTROL = 40
Data = /onlineNEDA_00/xData/hil099/run_0040_06-03-2023_00h38m10s/needleRU_i40_0040_0000.caendat
RU = 7.21 MB/s
LF = 3.55 MB/s
Plunger ;
Planger run = 8
0-Point = 232, 7 um
Supposed Distance = 234,7 um
Micrometer = 187.5 um
Position = 241.1 um
Actual Distance = 234,5 um
Voltage =4,106V
Beam dumb =
Collimeter = |
|
60
|
Fri Mar 3 16:47:29 2023 |
IK | Runs | | General | Run 36 started |
Run 36 Started
New Beam energy is 150 MeV
The beam dumb currennt is 2.5 enA.
Plunger run = 282
|
|
38
|
Thu Mar 2 23:01:21 2023 |
A.T. | Runs | | General | Run 34 started |
Run 34 Started (33 was stopped due to acquisition problems)
Plunger Run : 105
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 12.7 um
Voltage = 7.9 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
at the first 10 min det # 5 was switched off
Ge det # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
old scalers: 5 2.5 8 5 8.5 3 5 1.5 5 8.5 8.5 7.5 2.7 2.7 5 kHz
new (Grzes) 1.7 1 3.2 1.8 3.6 0.9 1.7 0.45 1.7 3.5 3.2 3.1 1. 1. 1.7 kHz
beam dump current 3nA
det # 5 scaler 7.7 kHz
stoppped 00:02 because beam current was reduced byu a factor of 2 (see note on the next run) |
|
37
|
Thu Mar 2 17:28:21 2023 |
BS | Runs | | | Run 33 Started |
Run 33 Started
Plunger Run : 48
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 6.5 um
Voltage = 7.957 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
20:50 Observed beam dropped by a factor of 2 (1.5 enA on the beam dump). Asked the operator to improve beam.
run stop 22:53 acquisition problem |
|
36
|
Thu Mar 2 17:25:36 2023 |
BS | Runs | | General | Run 32 Stopped |
Run 32 Stopped |
|
28
|
Thu Mar 2 11:19:06 2023 |
BS | Runs | | General | Run 30 Starts |
We hane now g-g trigger started.
Run 30 started |
|
30
|
Thu Mar 2 13:50:50 2023 |
BS | Runs | | General | Run 30 Continueed |
EAGLE is closed now
We gave a break to test the cable connection of target, degrader, beam dump and collimator.
Run 30 continues to collect data, we did not stop it.
But not much usefull data in it. |
|
27
|
Thu Mar 2 11:17:54 2023 |
BS | Runs | | | Run 29 stopped |
We will change the trigger and we stopped the run number 29 |
|
14
|
Wed Mar 1 19:04:37 2023 |
BS | Runs | Run | General | Run 26 Started |
Run 26 Started
Beam 9 enA on the collimator |
|
13
|
Wed Mar 1 16:07:49 2023 |
BS | Runs | | | Run 24 Started |
Run 24 has been started but no beams at the moment.
EAGLE is opened.
Just colecting background. |
|
12
|
Wed Mar 1 16:06:50 2023 |
BS | Runs | | | Run 23 Stopped |
Run 23 Stopped due to some unexpected spikes in the
voltage of collimator.
The plunger did not responde to change distance.
The chamber was opened and observed some yellow spots
seen over the Cd target. |
|
22
|
Thu Mar 2 09:20:17 2023 |
ost-mgb | Runs | | General | Rates |
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0043.caendat
RU = 6.25 Mb/s
LF = 4.06 Mb/s
09:15 beam stopped. data saved |
|
168
|
Wed Mar 8 16:53:07 2023 |
BS | Runs | | General | Rates |
|
|
170
|
Wed Mar 8 18:02:43 2023 |
BS | Runs | | General | Rates |
|