Sun Mar 5 22:32:56 2023, MP, Other, , , change of the target 6x
|
See pictures in the attachment:
1) stopper seen from the back (upstream view)
2) stopper seen from the front (downstream view) |
Sun Mar 12 19:20:37 2023, MP, Runs, , General, run 60, radioactivity,
|
Run 59 collected data using gg trigger radioactivty
Run 60 trigger changed fropm gg to single g.
Just in the beginning a few minutes gg data could have been collected. |
Sun Mar 12 20:55:08 2023, MP, Runs, , , runc62 152 for efficiency calibration
|
started
source in the target position, as precisely as possible
|
Mon Mar 13 12:15:35 2023, MP, Other, , , measurement of radioactivity along the beam line
|
At about 12:00, 13/03/2023 (about 17 hours after the beam was stopped), a measurement of activity of the beam line was performed using FH
40G-L10 meter.
Radioctivity run 65 stopped before the measurement, radioactivity run 66 started after the measurement |
Mon Mar 13 12:16:31 2023, MP, Other, , , run 66
|
run 66 started, radiocativity (background)
|
Mon Mar 13 15:16:21 2023, MP, Other, , , list of files copied to Bahadir's disks 
|
Attached are the lists of files copied to the two 4 TB Bahadir's disks.
|
Thu Mar 16 12:13:11 2023, MP, Other, , , test of radioactivity  
|
16/03/2023
Plunger chamber closed, some dummy target and stopper probably inside
run 72 eagle closed |
Mon Mar 20 04:55:24 2023, MP, Other, , , missing caendat.bz2 on Bahadir's disk
|
The following caendat.bz2 files were not copied to Bahadir's disks
(because they were not bzipped at the time of the copying):
|
Thu Mar 9 16:54:27 2023, MK, Runs, , General,
|
run control = 51
run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0002.caendat
RU = 6.43MB/s |
Sat Apr 11 12:37:21 2026, MK, Runs, , General,
|
run control = 51
run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0002.caendat
RU = 6.43MB/s |
Fri Apr 17 18:27:19 2026, MK, Runs, , General,
|
run control = 51
run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0002.caendat
RU = 6.43MB/s |
Wed Mar 1 21:59:45 2023, MB BS, Other, , General,
|
Offset of the plunger is 60 um.
new distcal01_vac_after_opening |
Mon Feb 27 12:13:03 2023, MB, Other, , , Plunger Informations
|
Off set of the plunger ~60 um
Distcal file distcal01_vac
|
Fri Mar 3 08:20:13 2023, KWL, Runs, , General,
|
plunger run # 196
Beam dump 1 enA (given by operators) * 7 (following entry ID#39) = 7 enA
Collimator 0.75 enA |
Fri Mar 3 15:04:33 2023, KWL, Other, , General, run 35 stopped
|
| Run 35 stopped. An attempt to check if we can get 5 MeV higher beam energy. |
Wed Mar 8 00:31:05 2023, KS, KSz, Runs, , General, Run 47 standard info
|
run control = 47
run data = /onlineNEDA_00/xData/hil099/run_0047_07-03-2023_23h42m03s/needleRU_i47_0047_0003.caendat
RU = 5.12 MB/s |
Wed Mar 8 01:24:58 2023, KS, KSz, Runs, , General, New run started 48 (new distance)
|
run control = 48
run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0000.caendat
RU = 5.09 MB/s |
Wed Mar 8 02:45:53 2023, KS, KSz, Other, , Beam, increase in Counting Rates
|
Since 2:32 increased counting rate observed:
Sinde 3:45 decrease to 1.5 kHz ch4.
run control = 48 |
Wed Mar 8 04:24:40 2023, KS, KSz, Runs, , General, Run 48
|
run control = 48
run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0017.caendat
RU = 5.75 MB/s |
Wed Mar 8 06:25:53 2023, KS, KSz, Runs, , General,
|
run control = 48
run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0029.caendat
RU = 6.59 MB/s |
|