Sun Mar 12 08:03:08 2023, OST, Runs, , General,
|
run control = 58
run data = xdaq 3303602776 Mar 12 08:01 needleRU_i58_0058_0024.caendat
RU = 7.88 MB/s |
Sun Mar 12 17:03:12 2023, OST, Runs, , General,
|
run control = 58
run data =xdaq 1111949504 Mar 12 17:01 needleRU_i58_0058_0083.caendat
RU = 7.14 MB/s |
Sun Mar 12 18:50:37 2023, OST, Runs, , General,
|
run control = 58
run data =xdaq 471656980 Mar 12 18:47 needleRU_i58_0058_0095.caendat
RU = 7.35 MB/s |
Sun Mar 12 19:00:59 2023, OST, Runs, , General, Run 58 stopped and Run 59 started.
|
18:54 Run 58 stopped and 18:55 Run 59 started.
BEAM STOPPED.
END of EXPERIMENT. |
Thu Mar 9 17:57:41 2023, MW, Runs, , General,
|
run control = 51
run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0007.caendat
RU = 6.45MB/s |
Mon Feb 27 12:21:29 2023, MP, BS, Runs, , General, List of runs
|
A list of runs, to be filled during the experiment is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing |
Fri Mar 3 00:09:19 2023, MP, AT, Runs, , , run 35
|
Started after beam current was reduced by a factor of 2
plunger run # 116
Earlier: CUP#6 100 enA |
Mon Mar 6 00:30:32 2023, MP, ANJ, Other, , Target, new target mounted
|
New target mounted.
106Cd 1 mg/cm2
181Ta 1.2 mg/cm2 |
Wed Mar 1 00:14:28 2023, MP, Other, , Beam, beam energy
|
Beam energy measured: 148.2 MeV
Mind that this may be an overestimate (by ~1-2 MeV) |
Wed Mar 1 11:52:48 2023, MP, Runs, , , first beam
|
| Operators tune beam on the target, collecting run 0023, trigger gg. |
Wed Mar 1 12:51:33 2023, MP, Runs, , Beam, beam on the target
|
Beam on the target:
target+stopper+beam dump: 25 enA (1.7 pnA) not stable
|
Thu Mar 2 16:40:45 2023, MP, Runs, , General, changing the plunger distance to minimum.
|
Run 31 was stopped, because plunger distance is reduced to the mininimal one.
It takes time, in the meantime, after some break, run 32 was started, with no beam. |
Sun Mar 5 16:58:45 2023, MP, Problems, , Other, run 37 crashed, run 38 junk
|
Run 37 stopped by itslelf at 15:43. This was noticed at about 16:10 by observing that grafana data rates do not change.
Stop at Run COntrol. LF looks disabled.
Attempt to restart normal way --> run 38 --> failed |
Sun Mar 5 22:32:56 2023, MP, Other, , , change of the target 6x
|
See pictures in the attachment:
1) stopper seen from the back (upstream view)
2) stopper seen from the front (downstream view) |
Sun Mar 12 19:20:37 2023, MP, Runs, , General, run 60, radioactivity,
|
Run 59 collected data using gg trigger radioactivty
Run 60 trigger changed fropm gg to single g.
Just in the beginning a few minutes gg data could have been collected. |
Sun Mar 12 20:55:08 2023, MP, Runs, , , runc62 152 for efficiency calibration
|
started
source in the target position, as precisely as possible
|
Mon Mar 13 12:15:35 2023, MP, Other, , , measurement of radioactivity along the beam line
|
At about 12:00, 13/03/2023 (about 17 hours after the beam was stopped), a measurement of activity of the beam line was performed using FH
40G-L10 meter.
Radioctivity run 65 stopped before the measurement, radioactivity run 66 started after the measurement |
Mon Mar 13 12:16:31 2023, MP, Other, , , run 66
|
run 66 started, radiocativity (background)
|
Mon Mar 13 15:16:21 2023, MP, Other, , , list of files copied to Bahadir's disks 
|
Attached are the lists of files copied to the two 4 TB Bahadir's disks.
|
Thu Mar 16 12:13:11 2023, MP, Other, , , test of radioactivity  
|
16/03/2023
Plunger chamber closed, some dummy target and stopper probably inside
run 72 eagle closed |
|