Sat Mar 11 21:24:04 2023, OST, Runs, , General,
|
run control = 55
run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0129.caendat
RU = 6.45 MB/s
LF = 3.46 MB/s
plunger:
plunger run = 1424
actual distance = 515 um
supposed distance = 435 um
micrometer = 578.2 um
position = 282.3 um
voltage = 1.372 V
Beam dump: 1 nA
Colimator : 0.5 nA |
Sun Mar 12 04:20:19 2023, OST, Runs, , General, Run 57 stopped, Run 58 started
|
| |
Sun Mar 12 07:01:31 2023, OST, Runs, , General,
|
run control = 58
run data =xdaq 2254808224 Mar 12 06:59 needleRU_i58_0058_0017.caendat
RU = 8.10 MB/s
LF = 3.79 MB/s
plunger:
plunger run = 1520
actual distance = 262.7 um
micrometer = 266.7 um
position = 30 um
voltage = 3.306 V
Beam dump: 1 nA
Colimator : 0.5 nA |
Sun Mar 12 08:03:08 2023, OST, Runs, , General,
|
run control = 58
run data = xdaq 3303602776 Mar 12 08:01 needleRU_i58_0058_0024.caendat
RU = 7.88 MB/s
LF = 3.70 MB/s
plunger:
plunger run = 1530
actual distance = 262.6 um
micrometer = 266.8 um
position = 29.9 um
voltage = 3.308 V
Beam dump: 1 nA
Colimator : 0.5 nA |
Sun Mar 12 17:03:12 2023, OST, Runs, , General,
|
run control = 58
run data =xdaq 1111949504 Mar 12 17:01 needleRU_i58_0058_0083.caendat
RU = 7.14 MB/s
LF = 3.46 MB/s
plunger:
plunger run = 1620
actual distance = 262.5 um
micrometer = 266.7 um
position = 29.8 um
voltage = 3.31 V
Beam dump: 0.7 nA
Colimator : 0.5 nA |
Sun Mar 12 18:50:37 2023, OST, Runs, , General,
|
run control = 58
run data =xdaq 471656980 Mar 12 18:47 needleRU_i58_0058_0095.caendat
RU = 7.35 MB/s
LF = 3.50 MB/s
plunger:
plunger run = 1638
actual distance = 262.6 um
micrometer = 266.9 um
position = 29.8 um
voltage = 3.308 V
Beam dump: 0.7 nA
Colimator : 0.5 nA |
Sun Mar 12 19:00:59 2023, OST, Runs, , General, Run 58 stopped and Run 59 started.
|
18:54 Run 58 stopped and 18:55 Run 59 started.
BEAM STOPPED.
END of EXPERIMENT.
Run 59 collects radioactivity.
-rw-rw-r-- 1 xdaq xdaq 295178920 Mar 12 18:59 needleLF_i58_0059_0000.adf
-rw-rw-r-- 1 xdaq xdaq 802293316 Mar 12 18:59 needleRU_i59_0059_0000.caendat |
Sat Apr 4 00:16:43 2026, OST, Runs, , General,
|
run control = 52
run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0045.caendat
RU = 6.18 MB/s
LF = 3.24 MB/s
plunger:
plunger run = 1060
actual distance = 434.6 um
supposed distance = 435.0 um
micrometer = 435.1 um
position = 201.3 um
voltage = 1.934 V
Beam dump: 1 nA
Colimator : 0.5 nA |
Thu Apr 9 15:07:01 2026, OST, Runs, , Beam,
|
beam started 18:04. |
Sun Apr 12 15:20:15 2026, OST, Runs, , General,
|
| Quote: |
|
RUN CONTROL = 41
Data =/onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0050.caendat
RU = 8.13 MB/s
LF = 4.21 MB/s
Plunger ;
Plunger run = 98
Supposed Dist= 242.7 um
Micrometer = 245.8 um
Position = 9.7 um
Actual distance = 242.4 um
Voltage = 3.821 V
Beam dumb = 2 nA
Collimeter = 2 nA
|
|
Mon Apr 13 10:08:23 2026, OST, Runs, , General,
|
| Quote: |
|
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0070.caendat
RU = 6.89 MB/s
LF = 3.42 MB/s
plunger:
plunger run = 847
actual distance = 532.2 um
supposed distance = 532.7 um
micrometer = 533.6 um
position = 299.5 um
voltage = 1.659 V
Beam dump: 1 nA
Colimator : 0.5 enA
|
|
Thu Mar 9 17:57:41 2023, MW, Runs, , General,
|
run control = 51
run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0007.caendat
RU = 6.45MB/s
LF = 3.47 MB/s
plunger:
plunger run = 907
actual distance = 532.8 um
supposed distance = 532.7 um
micrometer = 533.0 um
position = 299.0 um
voltage = 1.657 V
Beam dump: 1 nA
Colimator : 0.6 enA |
Mon Feb 27 12:21:29 2023, MP, BS, Runs, , General, List of runs
|
A list of runs, to be filled during the experiment is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing |
Fri Mar 3 00:09:19 2023, MP, AT, Runs, , , run 35
|
Started after beam current was reduced by a factor of 2
plunger run # 116
Earlier: CUP#6 100 enA
Now: CUP#6 50eNA
Beam dump 1.8 enA
Collimator 0.8 enA
The operator is asked to keep the beam dump current not larger than the present value.
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 11.7 um
Voltage = 7.9 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
Observed that detectors at theta 143 degrees count most. Is this because they see beam dump? |
Mon Mar 6 00:30:32 2023, MP, ANJ, Other, , Target, new target mounted
|
New target mounted.
106Cd 1 mg/cm2
181Ta 1.2 mg/cm2
Problems in alignment. Offset of 100 um, in spite of the fact that a gap is visible at this distance, and a hair could be moved in between stopper and the target.
Decided to close and pump anyway, after several attempts to improve the alignment.
Stopper same as before, slightly more stretched. |
Wed Mar 1 00:14:28 2023, MP, Other, , Beam, beam energy
|
Beam energy measured: 148.2 MeV
Mind that this may be an overestimate (by ~1-2 MeV) |
Wed Mar 1 11:52:48 2023, MP, Runs, , , first beam
|
Operators tune beam on the target, collecting run 0023, trigger gg. |
Wed Mar 1 12:51:33 2023, MP, Runs, , Beam, beam on the target
|
Beam on the target:
target+stopper+beam dump: 25 enA (1.7 pnA) not stable
5 mm collimator: 0.8 enA
data taking continued with run 0023 |
Thu Mar 2 16:40:45 2023, MP, Runs, , General, changing the plunger distance to minimum.
|
Run 31 was stopped, because plunger distance is reduced to the mininimal one.
It takes time, in the meantime, after some break, run 32 was started, with no beam. |
Sun Mar 5 16:58:45 2023, MP, Problems, , Other, run 37 crashed, run 38 junk
|
Run 37 stopped by itslelf at 15:43. This was noticed at about 16:10 by observing that grafana data rates do not change.
Stop at Run COntrol. LF looks disabled.
Attempt to restart normal way --> run 38 --> failed
Attempts to load topology failed.
Cannot any more refresh or load the Run COntrol web page (192.168.0.133:5000)
Grzes is trying to fix the problem remotely, while we are starting changing of the target....
|