Thu Mar 2 09:49:13 2023, BS, Runs, , General, run 28 started
|
run 28 started |
Thu Mar 2 11:17:54 2023, BS, Runs, , , Run 29 stopped
|
We will change the trigger and we stopped the run number 29 |
Thu Mar 2 11:19:06 2023, BS, Runs, , General, Run 30 Starts
|
We hane now g-g trigger started.
Run 30 started |
Thu Mar 2 13:50:50 2023, BS, Runs, , General, Run 30 Continueed
|
EAGLE is closed now
We gave a break to test the cable connection of target, degrader, beam dump and collimator.
Run 30 continues to collect data, we did not stop it.
But not much usefull data in it. |
Thu Mar 2 17:23:53 2023, BS, Runs, , General, Plunger Informations
|
Plunger Run : 48
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 6.5 um
Voltage = 7.957 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
|
Thu Mar 2 17:25:36 2023, BS, Runs, , General, Run 32 Stopped
|
Run 32 Stopped |
Thu Mar 2 17:28:21 2023, BS, Runs, , , Run 33 Started
|
Run 33 Started
Plunger Run : 48
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 6.5 um
Voltage = 7.957 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
20:50 Observed beam dropped by a factor of 2 (1.5 enA on the beam dump). Asked the operator to improve beam.
run stop 22:53 acquisition problem |
Mon Mar 6 01:00:29 2023, BS, Runs, , General, Run 40 stooped
|
Run 40 stooped |
Mon Mar 6 01:01:26 2023, BS, Runs, , General, Run 41 started
|
Run 41 started
Plunger distance 10 um |
Tue Mar 7 14:03:20 2023, BS, Runs, , General, Counting Rates
|
|
Tue Mar 7 14:07:33 2023, BS, Other, , General, Run Files Number
|
/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleRU_i45_0045_0027.caendat
/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleLF_i44_0045_0010.adf |
Tue Mar 7 14:23:43 2023, BS, Other, , General, RU and BU Rates
|
| |
Tue Mar 7 14:39:08 2023, BS, Other, , General, Runlist File ScreenShot Accesses on 07 MArch at 14:38
|
| |
Wed Mar 8 01:24:04 2023, BS, Runs, , General, Run 47 Stopped to Change Distance Change
|
Run 47 stopped and distance changed from 50 um (+ 100 um offset) to 150 um (+ 100 um offset)
Last plunger run for 50 um (+ 100 um offset) is 495 |
Wed Mar 8 16:51:13 2023, BS, Runs, , General,
|
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0050.caendat
RU = 6.75 MB/s
LF = 3.44 MB/s
plunger:
plunger run = 654
actual distance = 382.7 um
supposed distance = 382.7 um
micrometer = 384.4 um
position = 150.0 um
voltage = 2.147 V
Beam dump 1 nA |
Wed Mar 8 16:53:07 2023, BS, Runs, , General, Rates 
|
| |
Wed Mar 8 17:59:38 2023, BS, Runs, , General, General
|
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0058.caendat
RU = 9.83 MB/s
LF = 4.87 MB/s
plunger:
plunger run = 665
actual distance = 382.7 um
supposed distance = 382.7 um
micrometer = 384.4 um
position = 150.0 um
voltage = 2.148 V
Beam dump 1,25 ~ 1.5 nA |
Wed Mar 8 18:02:43 2023, BS, Runs, , General, Rates
|
| |
Sat Mar 11 00:34:51 2023, BS, Runs, , General, Run 55 Started New Distance 500 um
|
Run 55 Started New Distance 500 um |
Sat Mar 11 19:14:35 2023, BS, Runs, , General, Rates 
|
Run files /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0114.caendat
Beam Dump = 0.7 nA
Run number 55
Plunger Distance = 500 um + offset
Plunger run 1402
Voltage 1.369 V |
|