EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 12 of 14  ELOG logo
Entry  Tue Feb 28 23:08:35 2023, BS, Other, , , SHIFT LIST 

https://docs.google.com/spreadsheets/d/1e2homI9RCYrg369z8aaY3VMIPgapUPOv0zKISsl58vQ/edit?usp=sharing


The data from google sheet obtained 14:17 07/03/23

Initials Name Surname e-mail      
DOD Dave O'Donnell
david.odonnell@uws.ac.uk
     
GJ Grzegorz Jaworski
tatrofil@slcj.uw.edu.pl
           
ÖST Ömer Sefa Temiz
ostemiz@ankara.edu.tr
     
BS Bahadır Saygı
bsaygi@ankara.edu.tr
       
KWL Kasia Wrzosek-Lipska
wrzosek@slcj.uw.edu.pl
     
ZCH Zuzanna Chochulska
zuzanna.chochulska.stud@pw.edu.pl
     
MK Małgorzata Kurach
malgorzata.kurach.stud@pw.edu.pl
     
MP Michał Prędota
michal.predota.stud@pw.edu.pl
       
EG Ernest Grodner
grodner.ernest@gmail.com
     
BSK Bartosz Skura
bartosz.skura.stud@pw.edu.pl
     
FS Franziskus Spee
fspee@ikp.uni-koeln.de
     
MB Marcel Beckers
mbeckers@ikp.uni-koeln.de
     
AK Agnieszka Korgul
korgul@fuw.edu.pl
     
SP Serhii Panasenko
sergey.i.panasenko@gmail.com
     
AT Andrzej Tucholski
tucholski@slcj.uw.edu.pl
     
KS Krzysztof Solak
Krzysztof.solak@post.pl
     
AF Aleksandra Fijałkowska
aleksandra.fijalkowska@fuw.edu.pl
       
MGB M. Güray Budak
mgbudak@gmail.com
     
IK István Kuti kuti@atomki.hu      
JSP Justyna Samorajczyk-Pyśk
samorajczyk@slcj.uw.edu.pl
     
JD James Deary
James.Deary@uws.ac.uk
     
DW Dylan White
Dylan.White@uws.ac.uk
     
IP Iwona Piętka
iz.pietka@student.uw.edu.pl
     
WP Wiktor Poklepa
w.poklepa@student.uw.edu.pl
       
KSz Klara Szlęzak
k.szlezak@student.uw.edu.pl
       
       
       

 

Entry  Tue Feb 28 23:10:36 2023, BS, Other, , , What we need to include for Plunger 

Plunger Run :

Micrometer :

Supposed Distance:

Position :

Entry  Wed Mar 1 16:06:50 2023, BS, Runs, , , Run 23 Stopped 

Run 23 Stopped due to some unexpected spikes in the

voltage of collimator.

The plunger did not responde to change distance.

The chamber was opened and observed some yellow spots

seen over the Cd target.

Entry  Wed Mar 1 16:07:49 2023, BS, Runs, , , Run 24 Started 

Run 24 has been started but no beams at the moment.

EAGLE is opened.

Just colecting background.

Entry  Wed Mar 1 19:04:37 2023, BS, Runs, Run, General, Run 26 Started 

Run 26 Started

 

Beam 9 enA on the collimator

Entry  Thu Mar 2 09:49:13 2023, BS, Runs, , General, run 28 started 

run 28 started

Entry  Thu Mar 2 11:17:54 2023, BS, Runs, , , Run 29 stopped 

We will change the trigger and we stopped the run number 29

Entry  Thu Mar 2 11:19:06 2023, BS, Runs, , General, Run 30 Starts 

We hane now g-g trigger started.

Run 30 started

Entry  Thu Mar 2 13:50:50 2023, BS, Runs, , General, Run 30 Continueed 

EAGLE is closed now

We gave a break to test the cable connection of target, degrader, beam dump and collimator.

Run 30 continues to collect data, we did not stop it.

But not much usefull data in it.

Entry  Thu Mar 2 17:23:53 2023, BS, Runs, , General, Plunger Informations 

Plunger Run : 48

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 6.5 um

Voltage = 7.957 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
 

Entry  Thu Mar 2 17:25:36 2023, BS, Runs, , General, Run 32 Stopped 

Run 32 Stopped

Entry  Thu Mar 2 17:28:21 2023, BS, Runs, , , Run 33 Started 

Run 33 Started

Plunger Run : 48

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 6.5 um

Voltage = 7.957 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

 

20:50   Observed beam dropped by a factor of 2 (1.5 enA on the beam dump). Asked the operator to improve beam. 

run stop 22:53 acquisition problem

Entry  Mon Mar 6 01:00:29 2023, BS, Runs, , General, Run 40 stooped 

Run 40 stooped

Entry  Mon Mar 6 01:01:26 2023, BS, Runs, , General, Run 41 started 

Run 41 started

Plunger distance 10 um

Entry  Tue Mar 7 14:03:20 2023, BS, Runs, , General, Counting Rates Screenshot_2023-03-07_14-01-56.png

 

 

Entry  Tue Mar 7 14:07:33 2023, BS, Other, , General, Run Files Number 

/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleRU_i45_0045_0027.caendat

/onlineNEDA_00/xData/hil099/run_0045_07-03-2023_09h14m17s/needleLF_i44_0045_0010.adf

Entry  Tue Mar 7 14:23:43 2023, BS, Other, , General, RU and BU Rates Screenshot_2023-03-07_14-22-35.png
 
Entry  Tue Mar 7 14:39:08 2023, BS, Other, , General, Runlist File ScreenShot Accesses on 07 MArch at 14:38 Screenshot_2023-03-07_14-37-51.png
 
Entry  Wed Mar 8 01:24:04 2023, BS, Runs, , General, Run 47 Stopped to Change Distance Change 

Run 47 stopped and distance changed from 50 um (+ 100 um offset) to 150 um (+ 100 um offset)

Last plunger run for 50 um (+ 100 um offset) is 495

Entry  Wed Mar 8 16:51:13 2023, BS, Runs, , General,  

run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0050.caendat

RU =  6.75 MB/s

LF =   3.44 MB/s

plunger:

plunger run = 654

actual distance =  382.7 um

supposed distance = 382.7 um

micrometer =   384.4 um

position =  150.0 um

voltage =  2.147 V

 

Beam dump 1 nA

ELOG V3.1.5-fc6679b