Mon Mar 6 22:30:46 2023, IK, Runs, , General,
|
RUN CONTROL = 42
Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0065.caendat
RU = 6.64 MB/s
LF = 3.54 MB/s
Plunger ;
Plunger run = 230
Supposed Dist= 242.7 um
Micrometer = 246 um
Position = 9.7 um
Actual distance = 243.1 um
Voltage = 4.184 V
Beam dump = 1enA |
Wed Mar 8 07:57:05 2023, IK, Problems, , Beam, beam unstable
|
The beam was unstable from 7:55. Stabilized around 8:03.
Counting rates are higher, EAGLE det4 went to ~2.5kHZ from ~2kHz (attached).
According to the operator, a bit of a tuning was done, current is 1nA.
run control = 48
run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0041.caendat
RU = 10.4 MB/s
LF = 4.3 MB/s
|
Wed Mar 8 09:31:43 2023, IK, Runs, , General, Run 48 stopped, run 49 started
|
Run 48 stopped at 9:29 to start a new run.
Run 49 is started okay at 9:31.
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0041.caendat
RU = 10.1 MB/s
LF = 4.68MB/s
plunger:
plunger run = 582
actual distance = 383.1 um
supposed distance = 382.7 um
micrometer = 385.8 um
position = 150.5 um
voltage = 2.145 V
Beam dump 0.7 nA
|
Wed Mar 8 10:31:10 2023, IK, Runs, , General, Run 49
|
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0008.caendat
RU = 10.6 MB/s
LF = 4.89MB/s
plunger:
plunger run = 591
actual distance = 383.0 um
supposed distance = 382.7 um
micrometer = 385.8 um
position = 150.3 um
voltage = 2.145 V
Beam dump 0.7 nA
|
Wed Mar 8 11:42:14 2023, IK, Problems, , General, Run 49  
|
Counting rates continued to increase (det4 > 3kHz). Beam current looked fine on the beam dump, but beam is fluctuating, and can reach 2nA on the collimator. Asked for improved focusing.
Attached screenshots and Ge spectra from before changing anything.
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0020.caendat
RU = 13.3 MB/s
LF = 6.15MB/s
plunger:
plunger run = 603
actual distance = 382.7 um
supposed distance = 382.7 um
micrometer = 385.9 um
position = 150.0 um
voltage = 2.146 V
Beam dump 0.7 nA
Collimator ~1.5-2nA when the generator retunes itself (prob the beam gets defocused at those moments)
|
Wed Mar 8 12:11:59 2023, IK, Problem Fixed, , General, beam tuned
|
Beam tuning was made, focusing significantly improved.
Intensity:
beam dump: 0.9-1 nA,
collimator: 0.5 nA.
Rates:
RU = 8.2 MB/s
LF = 4.03 MB/s
EAGLE det4: 2.2 kHz
|
Wed Mar 8 13:02:38 2023, IK, Runs, , General, Run 49
|
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0030.caendat
RU = 7.86 MB/s
LF = 3.87 MB/s
plunger:
plunger run = 616
actual distance = 382.7 um
supposed distance = 382.7 um
micrometer = 385.7 um
position = 150.0 um
voltage = 2.147 V
Beam dump 0.7 nA
|
Wed Mar 8 13:04:05 2023, IK, Runs, , General, Ge spectra
|
Ge spectra after #161 - #162 beam tuning. |
Fri Apr 3 20:04:30 2026, IK, Runs, , General, Run 48 stopped, run 49 started
|
| Quote: |
|
Run 48 stopped at 9:29 to start a new run.
Run 49 is started okay at 9:31.
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0041.caendat
RU = 10.1 MB/s
LF = 4.68MB/s
plunger:
plunger run = 582
actual distance = 383.1 um
supposed distance = 382.7 um
micrometer = 385.8 um
position = 150.5 um
voltage = 2.145 V
Beam dump 0.7 nA
|
|
Sun Mar 12 03:05:45 2023, GJ, AF, Problems, , Network, no data flux visible in grafena, LF prints "write: Broken pipe"
|
As in the title, see below.
The data are still being constantly written on the disks with usual rate (also visible on grafena).
Greware is also seeing data.
beeper output:
no new data about the growth for 37 s !!!
Noticed at Sun Mar 12 02:50:42 2023
and weirdo scream followed.
LF output:
write: Broken pipe
0-LF_neda_2: 98 ev ( 107153)*30 Tot=26234475 2253/s
write: Broken pipe
0-LF_eagle_1: 881 ev ( 120281)*31 Tot=295856141 24268/s
write: Broken pipe
write: Broken pipe
0-LF_neda_3: 3 ev ( 3909)*5980 Tot=375647125 30917/s
write: Broken pipe
0-LF_neda_1: 92 ev ( 92962)*40 Tot=32523205 2820/s
write: Broken pipe
write: Broken pipe
0-LF_neda_0: 104 ev ( 117997)*33 Tot=38078515 3323/s
0-LF_eagle_0: 720 ev ( 63994)*31 Tot=268339966 22243/s
write: Broken pipe
write: Broken pipe
write: Broken pipe
write: Broken pipe
write: Broken pipe
write: Broken pipe
0-LF_neda_2: 72 ev ( 87376)*31 Tot=26236761 2274/s
write: Broken pipe
0-LF_eagle_1: 714 ev ( 104681)*35 Tot=295880265 23988/s
write: Broken pipe
write: Broken pipe
0-LF_neda_3: 9 ev ( 3988)*5870 Tot=375677518 30545/s
write: Broken pipe
0-LF_neda_1: 93 ev ( 98610)*34 Tot=32525919 2698/s |
Sun Feb 26 16:50:56 2023, GJ, Other, , General, proposal
|
|
Sun Feb 26 17:26:45 2023, GJ, Other, , General, List of participants
|
To be filled in, with affiliation and email.
Presumably, for later publication purposes.
Alphabetically by family name, please.
Budak, Mustafa Guray - Gazi University, mbudak@gazi.edu.tr
Ciemała, Michał - IFJ PAN, Kraków, Poland - Michal.Ciemala@ifj.edu.pl
Deary, James, - University of West of Scotland - james.deary@uws.ac.uk
Fijałkowska, Aleksandra, aleksandra.fijalkowska@fuw.edu.pl
Fransen' Christoph IKP JOELN fransen@ikp.uni-koeln.de
Goasduff, Alain - INFN-LNL alain.goasduff@lnl.infn.it
Grębosz, Jurek - IFJ PAN, Kraków, Poland
Jaworski, Grzegorz - HIL UW, Poland - tatrofil@slcj.uw.edu.pl
O'Donnell, David - University of West of Scotland - david.odonnell@uws.ac.uk
Palacz, Marcin - HIL UW, Poland - palacz@slcj.uw.edu.pl
Piętka, Iwona - Faculty of Physics, UW - iz.pietka@student.uw.edu.pl
Poklepa, Wiktor - UW, Poland, w.poklepa@student.uw.edu.pl
Saygi, Bahadir - Ankara University, Turkey - bahadir.saygi@ankara.edu.tr
Solak, Krzysztof - UW Poland, krzysztof.solak@post.pl
Szlęzak, Klara - UW, Poland, k.szlezak@student.uw.edu.pl
Temiz, Omer Sefa - Ankara University, Turkey - omer.temiz.95@gmail.com
White, Dylan, - University of West of Scotland - dylan.white@uws.ac.uk
|
Mon Feb 27 02:49:10 2023, GJ, Runs, , General, calibs - 2x 152Eu - run 0
|
Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
Stop time: Mon Feb 27 03:21:01 2023
Two Eu sources hanging in more or less focus points of two partially open halves of EAGLE. |
Thu Mar 2 23:04:01 2023, GJ, Problem Fixed, , Hardware, Connection of the plunger cables, grounding, beam read-out for the operators
|
Notes of the measurements with different conditions are attached.
Conclusion:
What is read out by the operators on the blue cable should be multiplied by 7 to get a real value in enA. |
Fri Mar 3 02:23:45 2023, GJ, Problems, , Software, builder gate, TS offsets
|
Data from current run - 35, with limited beam current and rates - see a recent post by Güray.
BU level, so what we see in Greware (both online & nearline).
Attached is the fold of Germaniums.
It seems way too large to me.
We are summing up the events and then, not surprisingly, having rubbish gamma-gamma matrices.
The gate is 1500 ns, while Ge are not so far away from each other.
Any fixed time differences should be corrected with LF configuration.
Having all Ge, ACS, and Neda TS-aligned at LF level, BU will do a good job with a reasonable short gate.
We need channel-by-channel TS differences.
The data we took and we are taking now can be recovered in terms of this correction later on.
Marcin can build the events correctly from LF level.
Let's try to do so with as short gates as possible and see again the gamma-gamma matrix and neutron-gated g-g
matrix. |
Thu Mar 9 01:41:50 2023, GJ, Problem Fixed, , Hardware, TS zeroing - cables to S-IN from VME controller - between runs 49 and 50
|
Since we were observing jumps of 16 ns in timings of all channels of whole boards, the assumption was that the
signals from logical FIFO arrive at different times to S-IN inputs to zero the TS counters.
6 originally placed cables of quite the same length were replaced with 6 cables of declared 3-ns length, same
producer, borrowed from NW's equipment. |
Sun Mar 12 20:31:45 2023, GJ, Runs, , General, run_61 - target and stopper and beam dump dismounted.
|
target and stopper and beam dump dismounted.
only the constructional elements of the plunger remained.
pure background, g trigger only.
Michal says the"bg" spectrum did not change... |
Sun Mar 12 21:33:54 2023, GJ, Runs, , General, run 63 - 152 Eu during LN2 filling
|
|
Sat Mar 11 09:29:48 2023, EG, Other, , , current exeriment parameters as requested in the manual for shifters
|
41_ge_single_theta 101,117,143 looks ok. No peakdeformation of 511, other gammas FWHM around half of that of511 - ok
ch4 in total rate EAGLE_0 arouns 2.1 kHz - ok
planger tollerace limits (green and blue horizontal markers) set far of the current distance, intantionally?
|
Sat Mar 11 10:46:37 2023, EG, Other, Beam intensity, ,
|
ch4 in total rate EGALE_) reached 2.4 kHz, beam intensity has been reduced to fit the required 2kHz.
|
|