EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 10 of 15  ELOG logo
Entry  Fri Mar 10 21:15:01 2023, IP, Runs, , General,  

run control = 53

 

run data =/onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0029.caendat

RU = 7.81 MB/s

LF =   3.94 MB/s

 

plunger:

plunger run = 1182

actual distance =  434.6 um

supposed distance = 435 um

micrometer =   436.4 um

position =  201.9 um

voltage =  1.934 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

Entry  Fri Mar 10 21:24:29 2023, IP, Runs, , Beam, the beam stopped 

the beam is stopped at 21:23.

Entry  Fri Mar 10 21:26:55 2023, IP, Problems, , Beam, problem with focus the beam 

the beam is not the best focused. The operator works on this problem.

Entry  Fri Mar 10 21:29:28 2023, IP, Runs, , Beam, beam start 

the beam starts at 21:27.

But the operators are still working on focusing the beam.

Entry  Fri Mar 10 21:30:42 2023, IP, Problem Fixed, , Beam, the beam is focused 

the beam is now good focused

Entry  Fri Mar 10 22:36:55 2023, IP, Runs, , General,  

run control = 53

 

run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0037.caendat

RU = 7.62 MB/s

LF =   3.87 MB/s

 

plunger:

plunger run = 1196

actual distance =  435.7 um

supposed distance = 435 um

micrometer =   437.0 um

position =  203.0 um

voltage =  1.927 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

    Reply  Fri Mar 10 22:40:00 2023, IP, Other, , General, Ge - the rate is higher Screenshot_2023-03-10_22-37-27.png

the rates of detectors are still a bit higher

Quote:

From 13:00 the rate of the Ge [the chanel 4] is a bit higher (~2.15 kHz). And also the rate of other detectors.

 

 

Entry  Fri Mar 10 23:27:51 2023, IP, Problems, , Software, run 53 - stopped 

the daq crashed at 22:43 -- problem with Local Filter

the run 53 - stopped

Entry  Fri Mar 10 23:29:43 2023, IP, Problem Fixed, , Software, new run 54 

the daq resolved at 23:15

start new run: run 54

Entry  Fri Mar 10 23:35:28 2023, IP, Runs, , General,  

run control = 54

 

run data = run_0054_10-03-2023_23h14m24s/needleRU_i54_0054_0001.caendat

RU = 7.59 MB/s

LF =   3.55 MB/s

 

plunger:

plunger run = 1206

actual distance =  436.1 um

supposed distance = 435 um

micrometer =   437.1 um

position =  203.4 um

voltage =  1.925 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

Entry  Sat Mar 11 00:05:06 2023, IP, Runs, , General, run 54 - stopped 

run 54 - stopped due to change the distance in plunger

  • Run number: 54
  • Start time: Fri Mar 10 23:14:54 2023
  • Stop time: Sat Mar 11 00:02:37 2023
    Reply  Mon Mar 23 03:03:54 2026, IP, Runs, , General, run 54 - stopped 

 

Quote:

run 54 - stopped due to change the distance in plunger

  • Run number: 54
  • Start time: Fri Mar 10 23:14:54 2023
  • Stop time: Sat Mar 11 00:02:37 2023

 

Entry  Fri Mar 3 20:50:31 2023, IK, MP, GJ, Other, , Data analysis, Ge spectra ge_rings101_117_143_Screenshot_2023-03-03_20-44-07.pngGe_rates_too_high.png

Ge rates increasing, similar to what it was 24h before. Asking to decrease beam intensity by a factor of 2.

Attached Ge spectra before decreasing.
 

Before decreas beam current was 1.75enA, afterwards 1.1enA.

Entry  Wed Mar 8 10:27:26 2023, IK, BS, Other, , General, Ge spectra Screenshot_2023-03-08_10-24-20.png

Count rates are still a bit high (~2.6kHz for EAGLE det4). Ge spectra looks fine compared to earlier ones.


 

Entry  Wed Mar 8 15:57:53 2023, IK, AM, Problems, , General, Beam issue 

no beam in 15:52 - 16:21 due to power supply problem

Entry  Fri Mar 3 16:47:29 2023, IK, Runs, , General, Run 36 started 

Run 36 Started

New Beam energy is 150 MeV

The beam dumb currennt is 2.5 enA.

Plunger run = 282

 

Entry  Fri Mar 3 17:52:41 2023, IK, Problem Fixed, , Hardware, Beamdump readout issue - solved 

Current readout issues from beamdump. Beam stopped from 17:46-17:52, run 36 ongoing.

MP & GJ checking the grounding and connection the beamdump readout. No visible issue found in the exp hall, but copper grounding wire was tightened, which seemingly resolved the issue (stability of beamdump readout).   

Entry  Fri Mar 3 19:41:27 2023, IK, Problems, , Hardware, Beamdump readout issue Vol.2. 333626140_152534624340296_7230383118242592907_n.jpg

Issue described in #61 continues to persist.

Beam stopped from 19:20 to 19:32, run 36 ongoing; MP, GJ, BS entering the experimental hall. 

They changed the position of the grounding point on the chamber, moving it downstream after a fitting/joining part (A to B on the attached picture [artist: GJ]).

 

Entry  Mon Mar 6 19:08:51 2023, IK, Runs, , General,  

RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0045.caendat

RU = 6.95 MB/s

LF = 3.61 MB/s

Plunger ;

Plunger run = 196

Supposed Dist= 242.7 um

Micrometer = 245.2 um

Position = 9.7  um

Actual distance = 245.2 um

Voltage = 3.821 V

Beam dump = 1enA

 

Entry  Mon Mar 6 20:29:45 2023, IK, Runs, , General,  

RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0053.caendat

RU = 6.75 MB/s

LF = 3.54 MB/s

Plunger ;

Plunger run = 210

Supposed Dist= 242.7 um

Micrometer = 245.2 um

Position = 9.6  um

Actual distance = 242.3 um

Voltage = 4.184 V

ELOG V3.1.5-fc6679b