Wed Mar 8 10:27:26 2023, IK, BS, Other, , General, Ge spectra
|
Count rates are still a bit high (~2.6kHz for EAGLE det4). Ge spectra looks fine compared to earlier ones.
|
Wed Mar 8 15:57:53 2023, IK, AM, Problems, , General, Beam issue
|
| no beam in 15:52 - 16:21 due to power supply problem |
Fri Mar 3 16:47:29 2023, IK, Runs, , General, Run 36 started
|
Run 36 Started
New Beam energy is 150 MeV
The beam dumb currennt is 2.5 enA. |
Fri Mar 3 17:52:41 2023, IK, Problem Fixed, , Hardware, Beamdump readout issue - solved
|
Current readout issues from beamdump. Beam stopped from 17:46-17:52, run 36 ongoing.
MP & GJ checking the grounding and connection the beamdump readout. No visible issue found in the exp hall, but copper grounding wire
was tightened, which seemingly resolved the issue (stability of beamdump readout). |
Fri Mar 3 19:41:27 2023, IK, Problems, , Hardware, Beamdump readout issue Vol.2.
|
Issue described in #61 continues to persist.
Beam stopped from 19:20 to 19:32, run 36 ongoing; MP, GJ, BS entering the experimental hall.
They changed the position of the grounding point on the chamber, moving it downstream after a fitting/joining part (A to B on the attached |
Mon Mar 6 19:08:51 2023, IK, Runs, , General,
|
RUN CONTROL = 42
Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0045.caendat
RU = 6.95 MB/s |
Mon Mar 6 20:29:45 2023, IK, Runs, , General,
|
RUN CONTROL = 42
Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0053.caendat
RU = 6.75 MB/s |
Mon Mar 6 22:30:46 2023, IK, Runs, , General,
|
RUN CONTROL = 42
Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0065.caendat
RU = 6.64 MB/s |
Wed Mar 8 07:57:05 2023, IK, Problems, , Beam, beam unstable
|
The beam was unstable from 7:55. Stabilized around 8:03.
Counting rates are higher, EAGLE det4 went to ~2.5kHZ from ~2kHz (attached).
According to the operator, a bit of a tuning was done, current is 1nA. |
Wed Mar 8 09:31:43 2023, IK, Runs, , General, Run 48 stopped, run 49 started
|
Run 48 stopped at 9:29 to start a new run.
Run 49 is started okay at 9:31.
|
Wed Mar 8 10:31:10 2023, IK, Runs, , General, Run 49
|
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0008.caendat
RU = 10.6 MB/s |
Wed Mar 8 11:42:14 2023, IK, Problems, , General, Run 49  
|
Counting rates continued to increase (det4 > 3kHz). Beam current looked fine on the beam dump, but beam is fluctuating, and can reach 2nA on the collimator.
Asked for improved focusing.
Attached screenshots and Ge spectra from before changing anything. |
Wed Mar 8 12:11:59 2023, IK, Problem Fixed, , General, beam tuned
|
Beam tuning was made, focusing significantly improved.
Intensity: |
Wed Mar 8 13:02:38 2023, IK, Runs, , General, Run 49
|
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0030.caendat
RU = 7.86 MB/s |
Wed Mar 8 13:04:05 2023, IK, Runs, , General, Ge spectra
|
| Ge spectra after #161 - #162 beam tuning. |
Sun Mar 12 03:05:45 2023, GJ, AF, Problems, , Network, no data flux visible in grafena, LF prints "write: Broken pipe"
|
As in the title, see below.
The data are still being constantly written on the disks with usual rate (also visible on grafena).
Greware is also seeing data.
|
Sun Feb 26 16:50:56 2023, GJ, Other, , General, proposal
|
| |
Sun Feb 26 17:26:45 2023, GJ, Other, , General, List of participants
|
To be filled in, with affiliation and email.
Presumably, for later publication purposes.
|
Mon Feb 27 02:49:10 2023, GJ, Runs, , General, calibs - 2x 152Eu - run 0
|
Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
|
Thu Mar 2 23:04:01 2023, GJ, Problem Fixed, , Hardware, Connection of the plunger cables, grounding, beam read-out for the operators
|
Notes of the measurements with different conditions are attached.
Conclusion:
|
|