Fri Mar 10 21:15:01 2023, IP, Runs, , General,
|
run control = 53
run data =/onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0029.caendat |
Fri Mar 10 21:24:29 2023, IP, Runs, , Beam, the beam stopped
|
| the beam is stopped at 21:23. |
Fri Mar 10 21:26:55 2023, IP, Problems, , Beam, problem with focus the beam
|
| the beam is not the best focused. The operator works on this problem. |
Fri Mar 10 21:29:28 2023, IP, Runs, , Beam, beam start
|
the beam starts at 21:27.
But the operators are still working on focusing the beam. |
Fri Mar 10 21:30:42 2023, IP, Problem Fixed, , Beam, the beam is focused
|
| the beam is now good focused |
Fri Mar 10 22:36:55 2023, IP, Runs, , General,
|
run control = 53
run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0037.caendat |
Fri Mar 10 22:40:00 2023, IP, Other, , General, Ge - the rate is higher
|
the rates of detectors are still a bit higher
Quote:
From 13:00 the rate of the Ge [the chanel 4] is a bit higher (~2.15 kHz). And also the rate of other detectors. |
Fri Mar 10 23:27:51 2023, IP, Problems, , Software, run 53 - stopped
|
the daq crashed at 22:43 -- problem with Local Filter
the run 53 - stopped |
Fri Mar 10 23:29:43 2023, IP, Problem Fixed, , Software, new run 54
|
the daq resolved at 23:15
start new run: run 54 |
Fri Mar 10 23:35:28 2023, IP, Runs, , General,
|
run control = 54
run data = run_0054_10-03-2023_23h14m24s/needleRU_i54_0054_0001.caendat |
Sat Mar 11 00:05:06 2023, IP, Runs, , General, run 54 - stopped
|
run 54 - stopped due to change the distance in plunger
Run number: 54
Start time: Fri Mar 10 23:14:54 2023
Stop time: Sat Mar 11 00:02:37 2023
|
Mon Mar 23 03:03:54 2026, IP, Runs, , General, run 54 - stopped
|
Quote:
run 54 - stopped due to change the distance in plunger |
Fri Mar 3 20:50:31 2023, IK, MP, GJ, Other, , Data analysis, Ge spectra 
|
Ge rates increasing, similar to what it was 24h before. Asking to decrease beam intensity by a factor of 2.
Attached Ge spectra before decreasing.
|
Wed Mar 8 10:27:26 2023, IK, BS, Other, , General, Ge spectra
|
Count rates are still a bit high (~2.6kHz for EAGLE det4). Ge spectra looks fine compared to earlier ones.
|
Wed Mar 8 15:57:53 2023, IK, AM, Problems, , General, Beam issue
|
| no beam in 15:52 - 16:21 due to power supply problem |
Fri Mar 3 16:47:29 2023, IK, Runs, , General, Run 36 started
|
Run 36 Started
New Beam energy is 150 MeV
The beam dumb currennt is 2.5 enA. |
Fri Mar 3 17:52:41 2023, IK, Problem Fixed, , Hardware, Beamdump readout issue - solved
|
Current readout issues from beamdump. Beam stopped from 17:46-17:52, run 36 ongoing.
MP & GJ checking the grounding and connection the beamdump readout. No visible issue found in the exp hall, but copper grounding wire
was tightened, which seemingly resolved the issue (stability of beamdump readout). |
Fri Mar 3 19:41:27 2023, IK, Problems, , Hardware, Beamdump readout issue Vol.2.
|
Issue described in #61 continues to persist.
Beam stopped from 19:20 to 19:32, run 36 ongoing; MP, GJ, BS entering the experimental hall.
They changed the position of the grounding point on the chamber, moving it downstream after a fitting/joining part (A to B on the attached |
Mon Mar 6 19:08:51 2023, IK, Runs, , General,
|
RUN CONTROL = 42
Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0045.caendat
RU = 6.95 MB/s |
Mon Mar 6 20:29:45 2023, IK, Runs, , General,
|
RUN CONTROL = 42
Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0053.caendat
RU = 6.75 MB/s |
|