EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 10 of 14  ELOG logo
Entry  Wed Mar 8 10:27:26 2023, IK, BS, Other, , General, Ge spectra Screenshot_2023-03-08_10-24-20.png
Count rates are still a bit high (~2.6kHz for EAGLE det4). Ge spectra looks fine compared to earlier ones.


 
Entry  Wed Mar 8 15:57:53 2023, IK, AM, Problems, , General, Beam issue 
no beam in 15:52 - 16:21 due to power supply problem
Entry  Fri Mar 3 16:47:29 2023, IK, Runs, , General, Run 36 started 
Run 36 Started

New Beam energy is 150 MeV

The beam dumb currennt is 2.5 enA.
Entry  Fri Mar 3 17:52:41 2023, IK, Problem Fixed, , Hardware, Beamdump readout issue - solved 
Current readout issues from beamdump. Beam stopped from 17:46-17:52, run 36 ongoing.

MP & GJ checking the grounding and connection the beamdump readout. No visible issue found in the exp hall, but copper grounding wire
was tightened, which seemingly resolved the issue (stability of beamdump readout).   
Entry  Fri Mar 3 19:41:27 2023, IK, Problems, , Hardware, Beamdump readout issue Vol.2. 333626140_152534624340296_7230383118242592907_n.jpg
Issue described in #61 continues to persist.

Beam stopped from 19:20 to 19:32, run 36 ongoing; MP, GJ, BS entering the experimental hall. 

They changed the position of the grounding point on the chamber, moving it downstream after a fitting/joining part (A to B on the attached
Entry  Mon Mar 6 19:08:51 2023, IK, Runs, , General,  
RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0045.caendat

RU = 6.95 MB/s
Entry  Mon Mar 6 20:29:45 2023, IK, Runs, , General,  
RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0053.caendat

RU = 6.75 MB/s
Entry  Mon Mar 6 22:30:46 2023, IK, Runs, , General,  
RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0065.caendat

RU = 6.64 MB/s
Entry  Wed Mar 8 07:57:05 2023, IK, Problems, , Beam, beam unstable Screenshot_2023-03-08_08-17-41.png
The beam was unstable from 7:55. Stabilized around 8:03.

Counting rates are higher, EAGLE det4 went to ~2.5kHZ from ~2kHz (attached).

According to the operator, a bit of a tuning was done, current is 1nA.
Entry  Wed Mar 8 09:31:43 2023, IK, Runs, , General, Run 48 stopped, run 49 started 
Run 48 stopped at 9:29 to start a new run.

Run 49 is started okay at 9:31.

 
Entry  Wed Mar 8 10:31:10 2023, IK, Runs, , General, Run 49 
run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0008.caendat

RU =  10.6 MB/s
Entry  Wed Mar 8 11:42:14 2023, IK, Problems, , General, Run 49 Screenshot_2023-03-08_11-38-47.pngScreenshot_2023-03-08_11-38-19.pngScreenshot_2023-03-08_11-37-37.png
Counting rates continued to increase (det4 > 3kHz). Beam current looked fine on the beam dump, but beam is fluctuating, and can reach 2nA on the collimator. 
Asked for improved focusing.

Attached screenshots and Ge spectra from before changing anything.
Entry  Wed Mar 8 12:11:59 2023, IK, Problem Fixed, , General, beam tuned 
Beam tuning was made, focusing significantly improved.

 

Intensity:
Entry  Wed Mar 8 13:02:38 2023, IK, Runs, , General, Run 49 
run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0030.caendat

RU =  7.86 MB/s
Entry  Wed Mar 8 13:04:05 2023, IK, Runs, , General, Ge spectra Screenshot_2023-03-08_13-03-10.png
Ge spectra after #161 - #162 beam tuning.
Entry  Sun Mar 12 03:05:45 2023, GJ, AF, Problems, , Network, no data flux visible in grafena, LF prints "write: Broken pipe" 
As in the title, see below.
The data are still being constantly written on the disks with usual rate (also visible on grafena).
Greware is also seeing data.
Entry  Sun Feb 26 16:50:56 2023, GJ, Other, , General, proposal HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf
 
Entry  Sun Feb 26 17:26:45 2023, GJ, Other, , General, List of participants 
To be filled in, with affiliation and email.

Presumably, for later publication purposes.
 
Entry  Mon Feb 27 02:49:10 2023, GJ, Runs, , General, calibs - 2x 152Eu - run 0 
Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
Entry  Thu Mar 2 23:04:01 2023, GJ, Problem Fixed, , Hardware, Connection of the plunger cables, grounding, beam read-out for the operators Slp823030222550.pdf
Notes of the measurements with different conditions are attached.

Conclusion:
ELOG V3.1.5-fc6679b