Mon Mar 6 22:30:46 2023, IK, Runs, , General,
|
RUN CONTROL = 42
Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0065.caendat
RU = 6.64 MB/s |
Wed Mar 8 07:57:05 2023, IK, Problems, , Beam, beam unstable
|
The beam was unstable from 7:55. Stabilized around 8:03.
Counting rates are higher, EAGLE det4 went to ~2.5kHZ from ~2kHz (attached).
According to the operator, a bit of a tuning was done, current is 1nA. |
Wed Mar 8 09:31:43 2023, IK, Runs, , General, Run 48 stopped, run 49 started
|
Run 48 stopped at 9:29 to start a new run.
Run 49 is started okay at 9:31.
|
Wed Mar 8 10:31:10 2023, IK, Runs, , General, Run 49
|
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0008.caendat
RU = 10.6 MB/s |
Wed Mar 8 11:42:14 2023, IK, Problems, , General, Run 49  
|
Counting rates continued to increase (det4 > 3kHz). Beam current looked fine on the beam dump, but beam is fluctuating, and can reach 2nA on the collimator.
Asked for improved focusing.
Attached screenshots and Ge spectra from before changing anything. |
Wed Mar 8 12:11:59 2023, IK, Problem Fixed, , General, beam tuned
|
Beam tuning was made, focusing significantly improved.
Intensity: |
Wed Mar 8 13:02:38 2023, IK, Runs, , General, Run 49
|
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0030.caendat
RU = 7.86 MB/s |
Wed Mar 8 13:04:05 2023, IK, Runs, , General, Ge spectra
|
| Ge spectra after #161 - #162 beam tuning. |
Fri Apr 3 20:04:30 2026, IK, Runs, , General, Run 48 stopped, run 49 started
|
Quote:
Run 48 stopped at 9:29 to start a new run. |
Sun Mar 12 03:05:45 2023, GJ, AF, Problems, , Network, no data flux visible in grafena, LF prints "write: Broken pipe"
|
As in the title, see below.
The data are still being constantly written on the disks with usual rate (also visible on grafena).
Greware is also seeing data.
|
Sun Feb 26 16:50:56 2023, GJ, Other, , General, proposal
|
| |
Sun Feb 26 17:26:45 2023, GJ, Other, , General, List of participants
|
To be filled in, with affiliation and email.
Presumably, for later publication purposes.
|
Mon Feb 27 02:49:10 2023, GJ, Runs, , General, calibs - 2x 152Eu - run 0
|
Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
|
Thu Mar 2 23:04:01 2023, GJ, Problem Fixed, , Hardware, Connection of the plunger cables, grounding, beam read-out for the operators
|
Notes of the measurements with different conditions are attached.
Conclusion:
|
Fri Mar 3 02:23:45 2023, GJ, Problems, , Software, builder gate, TS offsets
|
Data from current run - 35, with limited beam current and rates - see a recent post by Güray.
BU level, so what we see in Greware (both online & nearline).
Attached is the fold of Germaniums.
|
Thu Mar 9 01:41:50 2023, GJ, Problem Fixed, , Hardware, TS zeroing - cables to S-IN from VME controller - between runs 49 and 50
|
Since we were observing jumps of 16 ns in timings of all channels of whole boards, the assumption was that the
signals from logical FIFO arrive at different times to S-IN inputs to zero the TS counters.
6 originally placed cables of quite the same length were replaced with 6 cables of declared 3-ns length, same
|
Sun Mar 12 20:31:45 2023, GJ, Runs, , General, run_61 - target and stopper and beam dump dismounted.
|
target and stopper and beam dump dismounted.
only the constructional elements of the plunger remained.
|
Sun Mar 12 21:33:54 2023, GJ, Runs, , General, run 63 - 152 Eu during LN2 filling
|
| |
Sat Mar 11 09:29:48 2023, EG, Other, , , current exeriment parameters as requested in the manual for shifters
|
41_ge_single_theta 101,117,143 looks ok. No peakdeformation of 511, other gammas FWHM around half of that of511 - ok
ch4 in total rate EAGLE_0 arouns 2.1 kHz - ok
planger tollerace limits (green and blue horizontal markers) set far of the current distance, intantionally? |
Sat Mar 11 10:46:37 2023, EG, Other, Beam intensity, ,
|
ch4 in total rate EGALE_) reached 2.4 kHz, beam intensity has been reduced to fit the required 2kHz.
|
|