Entry  Mon Mar 6 22:30:46 2023, IK, Runs, , General,  
RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0065.caendat

RU = 6.64 MB/s
Entry  Wed Mar 8 07:57:05 2023, IK, Problems, , Beam, beam unstable Screenshot_2023-03-08_08-17-41.png
The beam was unstable from 7:55. Stabilized around 8:03.

Counting rates are higher, EAGLE det4 went to ~2.5kHZ from ~2kHz (attached).

According to the operator, a bit of a tuning was done, current is 1nA.
Entry  Wed Mar 8 09:31:43 2023, IK, Runs, , General, Run 48 stopped, run 49 started 
Run 48 stopped at 9:29 to start a new run.

Run 49 is started okay at 9:31.

 
Entry  Wed Mar 8 10:31:10 2023, IK, Runs, , General, Run 49 
run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0008.caendat

RU =  10.6 MB/s
Entry  Wed Mar 8 11:42:14 2023, IK, Problems, , General, Run 49 Screenshot_2023-03-08_11-38-47.pngScreenshot_2023-03-08_11-38-19.pngScreenshot_2023-03-08_11-37-37.png
Counting rates continued to increase (det4 > 3kHz). Beam current looked fine on the beam dump, but beam is fluctuating, and can reach 2nA on the collimator. 
Asked for improved focusing.

Attached screenshots and Ge spectra from before changing anything.
Entry  Wed Mar 8 12:11:59 2023, IK, Problem Fixed, , General, beam tuned 
Beam tuning was made, focusing significantly improved.

 

Intensity:
Entry  Wed Mar 8 13:02:38 2023, IK, Runs, , General, Run 49 
run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0030.caendat

RU =  7.86 MB/s
Entry  Wed Mar 8 13:04:05 2023, IK, Runs, , General, Ge spectra Screenshot_2023-03-08_13-03-10.png
Ge spectra after #161 - #162 beam tuning.
    Reply  Fri Apr 3 20:04:30 2026, IK, Runs, , General, Run 48 stopped, run 49 started 
 




Quote:



Run 48 stopped at 9:29 to start a new run.
Entry  Sun Mar 12 03:05:45 2023, GJ, AF, Problems, , Network, no data flux visible in grafena, LF prints "write: Broken pipe" 
As in the title, see below.
The data are still being constantly written on the disks with usual rate (also visible on grafena).
Greware is also seeing data.
Entry  Sun Feb 26 16:50:56 2023, GJ, Other, , General, proposal HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf
 
Entry  Sun Feb 26 17:26:45 2023, GJ, Other, , General, List of participants 
To be filled in, with affiliation and email.

Presumably, for later publication purposes.
 
Entry  Mon Feb 27 02:49:10 2023, GJ, Runs, , General, calibs - 2x 152Eu - run 0 
Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
Entry  Thu Mar 2 23:04:01 2023, GJ, Problem Fixed, , Hardware, Connection of the plunger cables, grounding, beam read-out for the operators Slp823030222550.pdf
Notes of the measurements with different conditions are attached.

Conclusion:
Entry  Fri Mar 3 02:23:45 2023, GJ, Problems, , Software, builder gate, TS offsets run_0035_BU_lenghts.png
Data from current run - 35, with limited beam current and rates - see a recent post by Güray.
BU level, so what we see in Greware (both online & nearline).
Attached is the fold of Germaniums.
Entry  Thu Mar 9 01:41:50 2023, GJ, Problem Fixed, , Hardware, TS zeroing - cables to S-IN from VME controller - between runs 49 and 50 
Since we were observing jumps of 16 ns in timings of all channels of whole boards, the assumption was that the 
signals from logical FIFO arrive at different times to S-IN inputs to zero the TS counters.
6 originally placed cables of quite the same length were replaced with 6 cables of declared 3-ns length, same 
Entry  Sun Mar 12 20:31:45 2023, GJ, Runs, , General, run_61 - target and stopper and beam dump dismounted. 
target and stopper and beam dump dismounted.
only the constructional elements of the plunger remained. 
Entry  Sun Mar 12 21:33:54 2023, GJ, Runs, , General, run 63 - 152 Eu during LN2 filling 
 
Entry  Sat Mar 11 09:29:48 2023, EG, Other, , , current exeriment parameters as requested in the manual for shifters 
41_ge_single_theta 101,117,143 looks ok. No peakdeformation of 511, other gammas FWHM around half of that of511 - ok

ch4 in total rate EAGLE_0 arouns 2.1 kHz - ok

planger tollerace limits (green and blue horizontal markers) set far of the current distance, intantionally?
Entry  Sat Mar 11 10:46:37 2023, EG, Other, Beam intensity, ,  
ch4 in total rate EGALE_) reached 2.4 kHz, beam intensity has been reduced to fit the required 2kHz.

 