EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 9 of 14  ELOG logo
Entry  Fri Mar 10 16:23:21 2023, IP, Runs, , General,  
run control = 53

 

run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0000.caendat
Entry  Fri Mar 10 17:34:07 2023, IP, Runs, , General,  
run control = 53

 

run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0007.caendat
Entry  Fri Mar 10 18:42:02 2023, IP, Runs, , General,  
run control = 53

 

run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0014.caendat
Entry  Fri Mar 10 19:30:48 2023, IP, Runs, , Beam, stop beam  
the beam was stopped at 19:27


 
Entry  Fri Mar 10 19:32:01 2023, IP, Runs, , Beam, start beam 
the beam start: 19:31
Entry  Fri Mar 10 19:42:57 2023, IP, Runs, , General,  
run control = 53

 

run data =/onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0020.caendat
Entry  Fri Mar 10 20:54:20 2023, IP, Problems, , Beam, lost the beam 
the beam was lost at 20:46. The operator is working to solve the problem.
Entry  Fri Mar 10 21:00:15 2023, IP, Problem Fixed, , Beam, the beam comes back 
the beam comes back at 20:54
Entry  Fri Mar 10 21:15:01 2023, IP, Runs, , General,  
run control = 53

 

run data =/onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0029.caendat
Entry  Fri Mar 10 21:24:29 2023, IP, Runs, , Beam, the beam stopped 
the beam is stopped at 21:23.
Entry  Fri Mar 10 21:26:55 2023, IP, Problems, , Beam, problem with focus the beam 
the beam is not the best focused. The operator works on this problem.
Entry  Fri Mar 10 21:29:28 2023, IP, Runs, , Beam, beam start 
the beam starts at 21:27.

But the operators are still working on focusing the beam.
Entry  Fri Mar 10 21:30:42 2023, IP, Problem Fixed, , Beam, the beam is focused 
the beam is now good focused
Entry  Fri Mar 10 22:36:55 2023, IP, Runs, , General,  
run control = 53

 

run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0037.caendat
    Reply  Fri Mar 10 22:40:00 2023, IP, Other, , General, Ge - the rate is higher Screenshot_2023-03-10_22-37-27.png
the rates of detectors are still a bit higher




Quote:



From 13:00 the rate of the Ge [the chanel 4] is a bit higher (~2.15 kHz). And also the rate of other detectors.
Entry  Fri Mar 10 23:27:51 2023, IP, Problems, , Software, run 53 - stopped 
the daq crashed at 22:43 -- problem with Local Filter

the run 53 - stopped
Entry  Fri Mar 10 23:29:43 2023, IP, Problem Fixed, , Software, new run 54 
the daq resolved at 23:15

start new run: run 54
Entry  Fri Mar 10 23:35:28 2023, IP, Runs, , General,  
run control = 54

 

run data = run_0054_10-03-2023_23h14m24s/needleRU_i54_0054_0001.caendat
Entry  Sat Mar 11 00:05:06 2023, IP, Runs, , General, run 54 - stopped 
run 54 - stopped due to change the distance in plunger


Run number: 54
Start time: Fri Mar 10 23:14:54 2023
Stop time: Sat Mar 11 00:02:37 2023
Entry  Fri Mar 3 20:50:31 2023, IK, MP, GJ, Other, , Data analysis, Ge spectra ge_rings101_117_143_Screenshot_2023-03-03_20-44-07.pngGe_rates_too_high.png
Ge rates increasing, similar to what it was 24h before. Asking to decrease beam intensity by a factor of 2.

Attached Ge spectra before decreasing.
 
ELOG V3.1.5-fc6679b