Fri Mar 10 16:23:21 2023, IP, Runs, , General,
|
run control = 53
run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0000.caendat
RU = 7.12 MB/s
LF = 3.50 MB/s
plunger:
plunger run = 1134
actual distance = 434.3 um
supposed distance = 435.0 um
micrometer = 436.2 um
position = 201.6 um
voltage = 1.932 V
Beam dump: 1 nA
Colimator : 0.5 nA |
Fri Mar 10 17:34:07 2023, IP, Runs, , General,
|
run control = 53
run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0007.caendat
RU = 8.24 MB/s
LF = 4.10 MB/s
plunger:
plunger run = 1146
actual distance = 434.7 um
supposed distance = 435.0 um
micrometer = 436.5 um
position = 202.0 um
voltage = 1.932 V
Beam dump: 1 nA
Colimator : 0.5 nA |
Fri Mar 10 18:42:02 2023, IP, Runs, , General,
|
run control = 53
run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0014.caendat
RU = 7.41 MB/s
LF = 3.34 MB/s
plunger:
plunger run = 1157
actual distance = 434.4 um
supposed distance = 435.0 um
micrometer = 436.8 um
position = 201.7 um
voltage = 1.931 V
Beam dump: 1 nA (sometimes increase to 1.5 nA)
Colimator : 0.5 nA |
Fri Mar 10 19:30:48 2023, IP, Runs, , Beam, stop beam
|
the beam was stopped at 19:27
|
Fri Mar 10 19:32:01 2023, IP, Runs, , Beam, start beam
|
the beam start: 19:31 |
Fri Mar 10 19:42:57 2023, IP, Runs, , General,
|
run control = 53
run data =/onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0020.caendat
RU = 6.77 MB/s
LF = 3.64 MB/s
plunger:
plunger run = 1167
actual distance = 434.4 um
supposed distance = 435 um
micrometer = 437.2 um
position = 201.0 um
voltage = 1.934 V
Beam dump: 1 nA (sometimes increase to 1.5 nA)
Colimator : 0.5 nA |
Fri Mar 10 20:54:20 2023, IP, Problems, , Beam, lost the beam
|
the beam was lost at 20:46. The operator is working to solve the problem. |
Fri Mar 10 21:00:15 2023, IP, Problem Fixed, , Beam, the beam comes back
|
the beam comes back at 20:54 |
Fri Mar 10 21:15:01 2023, IP, Runs, , General,
|
run control = 53
run data =/onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0029.caendat
RU = 7.81 MB/s
LF = 3.94 MB/s
plunger:
plunger run = 1182
actual distance = 434.6 um
supposed distance = 435 um
micrometer = 436.4 um
position = 201.9 um
voltage = 1.934 V
Beam dump: 1 nA
Colimator : 0.5 nA |
Fri Mar 10 21:24:29 2023, IP, Runs, , Beam, the beam stopped
|
the beam is stopped at 21:23. |
Fri Mar 10 21:26:55 2023, IP, Problems, , Beam, problem with focus the beam
|
the beam is not the best focused. The operator works on this problem. |
Fri Mar 10 21:29:28 2023, IP, Runs, , Beam, beam start
|
the beam starts at 21:27.
But the operators are still working on focusing the beam. |
Fri Mar 10 21:30:42 2023, IP, Problem Fixed, , Beam, the beam is focused
|
the beam is now good focused |
Fri Mar 10 22:36:55 2023, IP, Runs, , General,
|
run control = 53
run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0037.caendat
RU = 7.62 MB/s
LF = 3.87 MB/s
plunger:
plunger run = 1196
actual distance = 435.7 um
supposed distance = 435 um
micrometer = 437.0 um
position = 203.0 um
voltage = 1.927 V
Beam dump: 1 nA
Colimator : 0.5 nA |
Fri Mar 10 22:40:00 2023, IP, Other, , General, Ge - the rate is higher
|
the rates of detectors are still a bit higher
| Quote: |
|
From 13:00 the rate of the Ge [the chanel 4] is a bit higher (~2.15 kHz). And also the rate of other detectors.
|
|
Fri Mar 10 23:27:51 2023, IP, Problems, , Software, run 53 - stopped
|
the daq crashed at 22:43 -- problem with Local Filter
the run 53 - stopped |
Fri Mar 10 23:29:43 2023, IP, Problem Fixed, , Software, new run 54
|
the daq resolved at 23:15
start new run: run 54 |
Fri Mar 10 23:35:28 2023, IP, Runs, , General,
|
run control = 54
run data = run_0054_10-03-2023_23h14m24s/needleRU_i54_0054_0001.caendat
RU = 7.59 MB/s
LF = 3.55 MB/s
plunger:
plunger run = 1206
actual distance = 436.1 um
supposed distance = 435 um
micrometer = 437.1 um
position = 203.4 um
voltage = 1.925 V
Beam dump: 1 nA
Colimator : 0.5 nA |
Sat Mar 11 00:05:06 2023, IP, Runs, , General, run 54 - stopped
|
run 54 - stopped due to change the distance in plunger
- Run number: 54
- Start time: Fri Mar 10 23:14:54 2023
- Stop time: Sat Mar 11 00:02:37 2023
|
Fri Mar 3 20:50:31 2023, IK, MP, GJ, Other, , Data analysis, Ge spectra 
|
Ge rates increasing, similar to what it was 24h before. Asking to decrease beam intensity by a factor of 2.
Attached Ge spectra before decreasing.
Before decreas beam current was 1.75enA, afterwards 1.1enA. |