EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 14 of 15  ELOG logo
Entry  Sat Mar 11 22:27:08 2023, BS, Runs, , General, Rates Screenshot_2023-03-11_22-26-22.png

Rates 22:18 367Hz

Rates 22:22 4.78 kHz

And Now see the figure

 

Entry  Sat Mar 11 22:52:48 2023, BS, Runs, , General, run_0055 

run control = 55

run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0137.caendat

RU = 4.17 MB/s

LF =   3.11 MB/s

plunger:

plunger run = 1439

actual distance =  515 um

 

micrometer =   578.2 um

position = 282.3 um

voltage =  1.372 V

 

Beam dump: 0.75 nA 

Colimator :  1.1 enA

 

stop: 11.15 pm -> new plunger distance

 

Entry  Wed Mar 8 14:47:34 2023, AM, Runs, , Beam, beam unstable 

two drops in beam intesitivity at 14:33, 14:37 and 14:51

Entry  Fri Mar 10 00:09:32 2023, AM, Runs, , General,  

run control = 51

run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0040.caendat

RU =  5.56 MB/s

LF =   3.24 MB/s

 

plunger:

plunger run = 969

actual distance =  532.3 um

supposed distance = 532.7 um

micrometer =   533.4 um

position =  300.5 um

voltage =  1.658 V

 

Beam dump: 1 nA

Colimator :  0.6 enA

Entry  Fri Mar 10 01:28:48 2023, AM, Problems, , Other, Plunger distance 

longer break during chane of plunger distance due to technical problem, you can not move plunger to larger distances, so now we are choosing smaller distance in the morning we ask the specialists
 

Entry  Fri Mar 10 01:32:20 2023, AM, Runs, , General, run 51 stopped 

run 51 stopped

  • Run number: 51
  • Start time: Thu Mar 9 16:25:00 2023
  • Stop time: Fri Mar 10 00:13:21 2023

 

 

run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0000.caendat

RU =  6.02 MB/s

LF =   3.25 MB/s

 

plunger:

plunger run = 985

actual distance =  435.1 um

supposed distance = 435.0 um

micrometer =   435.9 um

position =  202.4 um

voltage =  1.929 V

 

Beam dump: 1 nA

Colimator :  0.3/0.4 enA

Entry  Fri Mar 10 03:20:42 2023, AM, Runs, , General,  

run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0010.caendat

RU =  5.55 MB/s

LF =   3.25 MB/s

 

plunger:

plunger run = 1002

actual distance =  434.3 um

supposed distance = 435.0 um

micrometer =   435.6 um

position =  201.6 um

voltage =  1.932 V

 

Beam dump: 1 nA

Colimator :  0.3/0.4 enA

 

Entry  Fri Mar 10 05:40:34 2023, AM, Runs, , General,  

run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0022.caendat

RU = 6.59 MB/s

LF =   3.49 MB/s

 

plunger:

plunger run = 1026

actual distance =  433.8 um

supposed distance = 435.0 um

micrometer =   435.0 um

position =  201.1 um

voltage =  1.934 V

 

Beam dump: 1 nA

Colimator :  0.3/0.4 enA

Entry  Fri Mar 10 07:03:54 2023, AM, Runs, , General,  

run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0029.caendat

RU = 6.06 MB/s

LF =   3.29 MB/s

 

plunger:

plunger run = 1040

actual distance =  434.3 um

supposed distance = 435.0 um

micrometer =   435.7 um

position =  201.6 um

voltage =  1.932 V

 

Beam dump: 1 nA

Colimator :  0.3/0.4 enA

Entry  Fri Mar 10 08:02:39 2023, AM, Problems, , Beam, bigger data rate  

rate of ch4 above 2kHz, too big beam intesivity, highier data rate from: 07:51
 

    Reply  Tue Apr 7 15:17:01 2026, AM, Runs, , General,  

 

Quote:

run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0010.caendat

RU =  5.55 MB/s

LF =   3.25 MB/s

 

plunger:

plunger run = 1002

actual distance =  434.3 um

supposed distance = 435.0 um

micrometer =   435.6 um

position =  201.6 um

voltage =  1.932 V

 

Beam dump: 1 nA

Colimator :  0.3/0.4 enA

 

 

Entry  Sat Mar 4 19:14:30 2023, AF, Runs, , General,  

AF

UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0144.caendat

RU = 6.46 MB/s

LF = 3.48 MB/s

Plunger ;

Planger run = 546

Supposed Dist=10 um

Actual Distance = 10 um

micrometer = 11.4 um

Position = 10.4 um

Voltage = 7.923 V

Beam dumb = 1 nA

Collimeter =0.7 nA

Entry  Sat Mar 4 20:56:40 2023, AF, Runs, , General,  

AF

UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0154.caendat

RU = 5.91 MB/s

LF = 3.43 MB/s

Plunger ;

Planger run = 563

Supposed Dist=10 um

Actual Distance = 9.8 um

micrometer = 11.0 um

Position = 10.1 um

Voltage = 7.947 V

Beam dumb =

Collimeter =

 

Stopped at 10.51 pm

Plan: change the distance between the target and the stopper

Plunger run nr at stop: 582

beam current at stop: 0.9 enA at the beam dump

 

Entry  Sat Mar 4 23:28:16 2023, AF, Runs, , General,  

AF

UN CONTROL = 37

Run Data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0000.caendat

RU = 5.91 MB/s

LF = 3.43 MB/s

Plunger ;

Planger run = 585

Supposed Dist=240 um

Actual Distance = 240 (+60) um

Position = 240.9 um

Voltage = 2.717 V

Beam dumb = 0.75 - 1.0 enA

Collimeter = 0.75-1.0 enA

 

Entry  Sun Mar 5 00:08:06 2023, AF, Runs, , General,  

AF

UN CONTROL = 37

Run Data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0005.caendat

RU = 5.38 MB/s

LF = 3.30 MB/s

Plunger ;

Planger run = 596

Supposed Dist=240 um

Actual Distance = 240 um

Position = 240.8 um

Voltage = 2.716 V

Beam dumb =

Collimeter =

 

Entry  Sat Mar 11 23:30:47 2023, AF, Runs, , General, run_0056 

run control = 56

run data =/onlineNEDA_00/xData/hil099/run_0056_11-03-2023_23h26m10s

RU = 7.3 MB/s

LF =   3.5 MB/s

plunger:

plunger run = 1445

actual distance =  262.7 um

 

micrometer =   266.2 um

position = 30 um

voltage =  3.05 V

 

Beam dump: 0.75 nA 

Colimator :  1.1 enA

 

stop:

Entry  Sun Mar 12 00:09:35 2023, AF, Problem Fixed, , Software, caen_shifted correction in spy & greware 
neda_psdcaen_positions.txt had weird values for three first detectors, especially neda_02.

It was:
NEDA_00_position_psdcaen    0
NEDA_01_position_psdcaen    0.22
NEDA_02_position_psdcaen    40

I (AF) make it:
NEDA_00_position_psdcaen    0.2
NEDA_01_position_psdcaen    0.2
NEDA_02_position_psdcaen    0.2
Entry  Sun Mar 12 03:23:05 2023, AF, Runs, , General, run_0057 

run control = 57

run data =/onlineNEDA_00/xData/hil099/run_0057_12-03-2023_03h10m10s/

RU = 8.1 MB/s

LF =   3.8 MB/s

plunger:

plunger run = 1484

actual distance =  262.7 um

 

micrometer =   266.9 um

position = 30 um

voltage =  3.306 V

 

Beam dump: 0.75 nA 

Colimator :  1.1 enA

 

stop:

Entry  Wed Apr 8 01:31:25 2026, AF, Runs, , General, run_0056 

run control = 56

run data =/onlineNEDA_00/xData/hil099/run_0056_11-03-2023_23h26m10s

RU = 7.3 MB/s

LF =   3.5 MB/s

plunger:

plunger run = 1445

actual distance =  262.7 um

 

micrometer =   266.2 um

position = 30 um

voltage =  3.05 V

 

Beam dump: 0.75 nA 

Colimator :  1.1 enA

 

stop:

Entry  Thu Mar 2 16:06:17 2023, A.T., Runs, , General,  

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0031_02-03-2023_11h18m31s/needleRU_i30_0031_0011.caendat

 

RU = 3.53 Mb/s

LF = 2.40 Mb/s

cables to colimeter are checked and replaced.

ELOG V3.1.5-fc6679b