EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 6 of 15  ELOG logo
ID Date Authordown Type test Category Subject Text Attachments
  91   Sun Mar 5 22:32:56 2023 MPOther  change of the targetSee pictures in the attachment:

1) stopper seen from the back (upstream
view)
 6x 
  255   Sun Mar 12 19:20:37 2023 MPRuns Generalrun 60, radioactivity, Run 59 collected data using gg trigger
radioactivty

Run 60 trigger changed fropm gg
  
  257   Sun Mar 12 20:55:08 2023 MPRuns  runc62 152 for efficiency calibrationstarted

source in the target position,
as precisely as possible
  
  260   Mon Mar 13 12:15:35 2023 MPOther  measurement of radioactivity along the beam lineAt about 12:00, 13/03/2023 (about 
17 hours after the beam was stopped), a measurement
of activity of the beam line was performed
  
  261   Mon Mar 13 12:16:31 2023 MPOther  run 66run 66 started, radiocativity (background)

 
  
  262   Mon Mar 13 15:16:21 2023 MPOther  list of files copied to Bahadir's disksAttached are the lists of files copied
to the two 4 TB Bahadir's disks.

 
 disk1.list_of_filesdisk2.list_of_files 
  263   Thu Mar 16 12:13:11 2023 MPOther  test of radioactivity16/03/2023

Plunger chamber closed, some dummy
target and stopper probably inside
 rings_16mar2023_0905.pngrings143_16mar2023_0908.pngrings143_16mar2023_0920.png 
  264   Mon Mar 20 04:55:24 2023 MPOther  missing caendat.bz2 on Bahadir's diskThe following  caendat.bz2 files were not
copied to Bahadir's disks 
(because they were not bzipped at the time
  
  189   Thu Mar 9 16:54:27 2023 MKRuns General run control = 51

run data =  /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0002.caendat

RU =  6.43MB/s
  
  Draft   Sat Apr 11 12:37:21 2026 MKRuns General run control = 51

run data =  /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0002.caendat

RU =  6.43MB/s
  
  Draft   Fri Apr 17 18:27:19 2026 MKRuns General run control = 51

run data =  /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0002.caendat

RU =  6.43MB/s
  
  16   Wed Mar 1 21:59:45 2023 MB BSOther General Offset of the plunger is 60 um.

new distcal01_vac_after_opening
  
  5   Mon Feb 27 12:13:03 2023 MBOther  Plunger InformationsOff set of the plunger ~60 um

Distcal file   distcal01_vac

 
  
  49   Fri Mar 3 08:20:13 2023 KWLRuns General plunger run # 196

Beam dump 1 enA (given by operators)
* 7 (following entry ID#39) = 7 enA
  
  59   Fri Mar 3 15:04:33 2023 KWLOther Generalrun 35 stopped Run 35 stopped. An attempt to check if
we can get 5 MeV  higher beam energy.
  
  149   Wed Mar 8 00:31:05 2023 KS, KSzRuns GeneralRun 47 standard inforun control = 47

run data = /onlineNEDA_00/xData/hil099/run_0047_07-03-2023_23h42m03s/needleRU_i47_0047_0003.caendat

RU =  5.12 MB/s
  
  152   Wed Mar 8 01:24:58 2023 KS, KSzRuns GeneralNew run started 48 (new distance)run control = 48

run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0000.caendat

RU =  5.09 MB/s
  
  153   Wed Mar 8 02:45:53 2023 KS, KSzOther Beamincrease in Counting Rates Since 2:32 increased counting rate observed:

Sinde 3:45 decrease to 1.5 kHz
ch4.
  
  154   Wed Mar 8 04:24:40 2023 KS, KSzRuns GeneralRun 48run control = 48

run data =  /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0017.caendat

RU =  5.75 MB/s
  
  155   Wed Mar 8 06:25:53 2023 KS, KSzRuns General run control = 48

run data =  /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0029.caendat

RU =  6.59 MB/s
  
ELOG V3.1.5-fc6679b