| ID |
Date |
Author |
Type |
test |
Category |
Subject |
Text |
 |
|
91
|
Sun Mar 5 22:32:56 2023 |
MP | Other | | | change of the target | See pictures in the attachment:
1) stopper seen from the back (upstream
view) |
6x |
|
255
|
Sun Mar 12 19:20:37 2023 |
MP | Runs | | General | run 60, radioactivity, | Run 59 collected data using gg trigger
radioactivty
Run 60 trigger changed fropm gg |
|
|
257
|
Sun Mar 12 20:55:08 2023 |
MP | Runs | | | runc62 152 for efficiency calibration | started
source in the target position,
as precisely as possible |
|
|
260
|
Mon Mar 13 12:15:35 2023 |
MP | Other | | | measurement of radioactivity along the beam line | At about 12:00, 13/03/2023 (about
17 hours after the beam was stopped), a measurement
of activity of the beam line was performed |
|
|
261
|
Mon Mar 13 12:16:31 2023 |
MP | Other | | | run 66 | run 66 started, radiocativity (background)
|
|
|
262
|
Mon Mar 13 15:16:21 2023 |
MP | Other | | | list of files copied to Bahadir's disks | Attached are the lists of files copied
to the two 4 TB Bahadir's disks.
|
 |
|
263
|
Thu Mar 16 12:13:11 2023 |
MP | Other | | | test of radioactivity | 16/03/2023
Plunger chamber closed, some dummy
target and stopper probably inside |
  |
|
264
|
Mon Mar 20 04:55:24 2023 |
MP | Other | | | missing caendat.bz2 on Bahadir's disk | The following caendat.bz2 files were not
copied to Bahadir's disks
(because they were not bzipped at the time |
|
|
189
|
Thu Mar 9 16:54:27 2023 |
MK | Runs | | General | | run control = 51
run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0002.caendat
RU = 6.43MB/s |
|
|
Draft
|
Sat Apr 11 12:37:21 2026 |
MK | Runs | | General | | run control = 51
run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0002.caendat
RU = 6.43MB/s |
|
|
Draft
|
Fri Apr 17 18:27:19 2026 |
MK | Runs | | General | | run control = 51
run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0002.caendat
RU = 6.43MB/s |
|
|
16
|
Wed Mar 1 21:59:45 2023 |
MB BS | Other | | General | | Offset of the plunger is 60 um.
new distcal01_vac_after_opening |
|
|
5
|
Mon Feb 27 12:13:03 2023 |
MB | Other | | | Plunger Informations | Off set of the plunger ~60 um
Distcal file distcal01_vac
|
|
|
49
|
Fri Mar 3 08:20:13 2023 |
KWL | Runs | | General | | plunger run # 196
Beam dump 1 enA (given by operators)
* 7 (following entry ID#39) = 7 enA |
|
|
59
|
Fri Mar 3 15:04:33 2023 |
KWL | Other | | General | run 35 stopped | Run 35 stopped. An attempt to check if
we can get 5 MeV higher beam energy. |
|
|
149
|
Wed Mar 8 00:31:05 2023 |
KS, KSz | Runs | | General | Run 47 standard info | run control = 47
run data = /onlineNEDA_00/xData/hil099/run_0047_07-03-2023_23h42m03s/needleRU_i47_0047_0003.caendat
RU = 5.12 MB/s |
|
|
152
|
Wed Mar 8 01:24:58 2023 |
KS, KSz | Runs | | General | New run started 48 (new distance) | run control = 48
run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0000.caendat
RU = 5.09 MB/s |
|
|
153
|
Wed Mar 8 02:45:53 2023 |
KS, KSz | Other | | Beam | increase in Counting Rates | Since 2:32 increased counting rate observed:
Sinde 3:45 decrease to 1.5 kHz
ch4. |
|
|
154
|
Wed Mar 8 04:24:40 2023 |
KS, KSz | Runs | | General | Run 48 | run control = 48
run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0017.caendat
RU = 5.75 MB/s |
|
|
155
|
Wed Mar 8 06:25:53 2023 |
KS, KSz | Runs | | General | | run control = 48
run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0029.caendat
RU = 6.59 MB/s |
|