EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 5 of 15  ELOG logo
ID Date Authordown Type test Category Subject Text Attachments
  240   Sat Mar 11 21:24:04 2023 OSTRuns General run control = 55

run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0129.caendat

RU = 6.45 MB/s
  
  247   Sun Mar 12 04:20:19 2023 OSTRuns GeneralRun 57 stopped, Run 58 started     
  248   Sun Mar 12 07:01:31 2023 OSTRuns General run control = 58

run data =xdaq 2254808224 Mar 12
06:59 needleRU_i58_0058_0017.caendat
  
  249   Sun Mar 12 08:03:08 2023 OSTRuns General run control = 58

run data = xdaq 3303602776 Mar
12 08:01 needleRU_i58_0058_0024.caendat
  
  252   Sun Mar 12 17:03:12 2023 OSTRuns General run control = 58

run data =xdaq 1111949504 Mar 12
17:01 needleRU_i58_0058_0083.caendat
  
  253   Sun Mar 12 18:50:37 2023 OSTRuns General run control = 58

run data =xdaq  471656980
Mar 12 18:47 needleRU_i58_0058_0095.caendat
  
  254   Sun Mar 12 19:00:59 2023 OSTRuns GeneralRun 58 stopped and Run 59 started.18:54 Run 58 stopped and 18:55 Run 59 started.

BEAM STOPPED.

END of EXPERIMENT.
  
  Draft   Sat Apr 4 00:16:43 2026 OSTRuns General run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0045.caendat

RU = 6.18 MB/s
  
  Draft   Thu Apr 9 15:07:01 2026 OSTRuns Beam beam started 18:04.   
  Draft   Sun Apr 12 15:20:15 2026 OSTRuns General  




  
  Draft   Mon Apr 13 10:08:23 2026 OSTRuns General  




  
  190   Thu Mar 9 17:57:41 2023 MWRuns General run control = 51

run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0007.caendat

RU =  6.45MB/s
  
  6   Mon Feb 27 12:21:29 2023 MP, BSRuns GeneralList of runsA list of runs, to be filled during the experiment
is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing
  
  40   Fri Mar 3 00:09:19 2023 MP, ATRuns  run 35Started after beam current was reduced
by a factor of 2

plunger run # 116
  
  92   Mon Mar 6 00:30:32 2023 MP, ANJOther Targetnew target mountedNew target mounted.

106Cd 1 mg/cm2

181Ta  1.2 mg/cm2
  
  9   Wed Mar 1 00:14:28 2023 MPOther Beambeam energyBeam energy measured:  148.2 MeV
Mind that this may be an overestimate (by
~1-2 MeV)
  
  10   Wed Mar 1 11:52:48 2023 MPRuns  first beamOperators tune beam on the target, collecting
run 0023, trigger gg.
  
  11   Wed Mar 1 12:51:33 2023 MPRuns Beambeam on the targetBeam on the target:

target+stopper+beam dump: 25 enA   (1.7 pnA)
  
  34   Thu Mar 2 16:40:45 2023 MPRuns Generalchanging the plunger distance to minimum.Run 31 was stopped, because plunger distance
is reduced to the mininimal one.
It takes time, in the meantime, after some
  
  90   Sun Mar 5 16:58:45 2023 MPProblems Otherrun 37 crashed, run 38 junkRun 37 stopped by itslelf at 15:43. This
was noticed at about 16:10 by observing that
grafana data rates do not change.
  
ELOG V3.1.5-fc6679b