EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 5 of 15  ELOG logo
ID Date Authordown Type test Category Subject
  240   Sat Mar 11 21:24:04 2023 OSTRuns General 

run control = 55

run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0129.caendat

RU = 6.45 MB/s

LF =   3.46 MB/s

plunger:

plunger run = 1424

actual distance =  515 um

supposed distance = 435 um

micrometer =   578.2 um

position = 282.3 um

voltage =  1.372 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

  247   Sun Mar 12 04:20:19 2023 OSTRuns GeneralRun 57 stopped, Run 58 started
  248   Sun Mar 12 07:01:31 2023 OSTRuns General 

run control = 58

run data =xdaq 2254808224 Mar 12 06:59 needleRU_i58_0058_0017.caendat

RU = 8.10 MB/s

LF =   3.79 MB/s

plunger:

plunger run = 1520

actual distance =  262.7 um

 

micrometer =   266.7 um

position = 30 um

voltage =  3.306 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

  249   Sun Mar 12 08:03:08 2023 OSTRuns General 

run control = 58

run data = xdaq 3303602776 Mar 12 08:01 needleRU_i58_0058_0024.caendat

RU = 7.88 MB/s

LF =   3.70 MB/s

plunger:

plunger run = 1530

actual distance =  262.6 um

 

micrometer =   266.8 um

position = 29.9 um

voltage =  3.308 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

  252   Sun Mar 12 17:03:12 2023 OSTRuns General 

run control = 58

run data =xdaq 1111949504 Mar 12 17:01 needleRU_i58_0058_0083.caendat

RU = 7.14 MB/s

LF =   3.46 MB/s

plunger:

plunger run = 1620

actual distance =  262.5 um

 

micrometer =   266.7 um

position = 29.8 um

voltage =  3.31 V

 

Beam dump: 0.7 nA 

Colimator :  0.5 nA

  253   Sun Mar 12 18:50:37 2023 OSTRuns General 

run control = 58

run data =xdaq  471656980 Mar 12 18:47 needleRU_i58_0058_0095.caendat

RU = 7.35 MB/s

LF =   3.50 MB/s

plunger:

plunger run = 1638

actual distance =  262.6 um

 

micrometer =   266.9 um

position = 29.8 um

voltage =  3.308 V

 

Beam dump: 0.7 nA 

Colimator :  0.5 nA

  254   Sun Mar 12 19:00:59 2023 OSTRuns GeneralRun 58 stopped and Run 59 started.

18:54 Run 58 stopped and 18:55 Run 59 started.

BEAM STOPPED.

END of EXPERIMENT.

Run 59 collects radioactivity.

 

-rw-rw-r-- 1 xdaq xdaq 295178920 Mar 12 18:59 needleLF_i58_0059_0000.adf
-rw-rw-r-- 1 xdaq xdaq 802293316 Mar 12 18:59 needleRU_i59_0059_0000.caendat

  Draft   Sat Apr 4 00:16:43 2026 OSTRuns General 

run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0045.caendat

RU = 6.18 MB/s

LF =   3.24 MB/s

plunger:

plunger run = 1060

actual distance =  434.6 um

supposed distance = 435.0 um

micrometer =   435.1 um

position =  201.3 um

voltage =  1.934 V

 

Beam dump: 1 nA

Colimator :  0.5 nA

  Draft   Thu Apr 9 15:07:01 2026 OSTRuns Beam 

beam started 18:04.

  Draft   Sun Apr 12 15:20:15 2026 OSTRuns General 

 

Quote:

RUN CONTROL = 41

Data =/onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0050.caendat

RU =   8.13 MB/s

LF =   4.21 MB/s

Plunger ;

Plunger run = 98

Supposed Dist= 242.7 um

Micrometer =  245.8 um

Position =   9.7  um

Actual distance = 242.4 um

Voltage =  3.821  V

Beam dumb =  2 nA

Collimeter = 2  nA

 

  Draft   Mon Apr 13 10:08:23 2026 OSTRuns General 

 

Quote:

run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0070.caendat

RU =  6.89 MB/s

LF =   3.42 MB/s

plunger:

plunger run = 847

actual distance =  532.2 um

supposed distance = 532.7 um

micrometer =   533.6 um

position =  299.5 um

voltage =  1.659 V

 

Beam dump: 1 nA

Colimator :  0.5 enA

 

  190   Thu Mar 9 17:57:41 2023 MWRuns General 

run control = 51

run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0007.caendat

RU =  6.45MB/s

LF =   3.47 MB/s

plunger:

plunger run = 907

actual distance =  532.8 um

supposed distance = 532.7 um

micrometer =   533.0 um

position =  299.0 um

voltage =  1.657 V

 

Beam dump: 1 nA

Colimator :  0.6 enA

  6   Mon Feb 27 12:21:29 2023 MP, BSRuns GeneralList of runs
A list of runs, to be filled during the experiment is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing
  40   Fri Mar 3 00:09:19 2023 MP, ATRuns  run 35

Started after beam current was reduced by a factor of 2

plunger run # 116

Earlier:   CUP#6  100 enA

Now: CUP#6   50eNA

Beam dump 1.8 enA

Collimator  0.8 enA

The operator is asked to keep the beam dump current not larger than the present value.

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 11.7 um

Voltage = 7.9 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

 

Observed that detectors at theta 143 degrees count most.  Is this because they see beam dump?

  92   Mon Mar 6 00:30:32 2023 MP, ANJOther Targetnew target mounted

New target mounted.

106Cd 1 mg/cm2

181Ta  1.2 mg/cm2

 

Problems in alignment. Offset of 100 um, in spite of the fact that a gap is visible at this distance, and a hair could be moved in between stopper and the target.
Decided to close and pump anyway, after several attempts to improve the alignment.

Stopper same as before, slightly more stretched.

  9   Wed Mar 1 00:14:28 2023 MPOther Beambeam energy
Beam energy measured:  148.2 MeV
Mind that this may be an overestimate (by ~1-2 MeV)
  10   Wed Mar 1 11:52:48 2023 MPRuns  first beam
Operators tune beam on the target, collecting run 0023, trigger gg.
  11   Wed Mar 1 12:51:33 2023 MPRuns Beambeam on the target
Beam on the target:

target+stopper+beam dump: 25 enA   (1.7 pnA)    not stable
5 mm collimator:  0.8 enA 

data taking continued with run 0023
  34   Thu Mar 2 16:40:45 2023 MPRuns Generalchanging the plunger distance to minimum.
Run 31 was stopped, because plunger distance is reduced to the mininimal one.
It takes time, in the meantime, after some break, run 32  was started, with no beam.
  90   Sun Mar 5 16:58:45 2023 MPProblems Otherrun 37 crashed, run 38 junk

Run 37 stopped by itslelf at 15:43. This was noticed at about 16:10 by observing that grafana data rates do not change.

Stop at Run COntrol.  LF looks  disabled.

Attempt to restart normal way --> run 38  --> failed

Attempts to load topology failed.

Cannot any more refresh or load the Run COntrol web page (192.168.0.133:5000)

Grzes is trying to fix the problem remotely, while we are starting changing of the target....

 

 

ELOG V3.1.5-fc6679b