EAGLE
IRRADIATIONS
EXTERNAL
Analysis
Students Workshop
Shift Plans
GAMMA-ONLY
NEEDLE NEEDI
COULEX
PLUNGER
GENERAL
HIL102-128Cs
HIL087-176Pt
Nd148_2
176Pt
HIL109-172Os
HIL124-128Cs
HIL061
Nd148
HIL106-119Cs
HIL097-118Xe
HIL099-134Sm
April16
xdaq
HIL099-134Sm, Page 7 of 15
New
|
Find
|
Config
|
Logout
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Runs
Problems
Problem Fixed
Other
282 Entries
Goto page
Previous
1
,
2
,
3
...
6
, 7,
8
...
13
,
14
,
15
Next
All
ID
Date
Author
Type
test
Category
Subject
Text
64
Fri Mar 3 23:38:28 2023
SP
Runs
General
How different Ge count
All germanium detecors look reasonable,
as attached.
169
Wed Mar 8 17:59:38 2023
BS
Runs
General
General
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0058.caendat
RU = 9.83 MB/s
176
Thu Mar 9 02:14:09 2023
WP
Runs
General
General
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0008.caendat
177
Thu Mar 9 03:14:39 2023
WP
Runs
General
General
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0015.caendat
178
Thu Mar 9 04:17:21 2023
WP
Runs
General
General
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0022.caendat
179
Thu Mar 9 05:19:33 2023
WP
Runs
General
General
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0028.caendat
180
Thu Mar 9 06:24:10 2023
WP
Runs
General
General
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0035.caendat
181
Thu Mar 9 07:28:59 2023
WP
Runs
General
General
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0042.caendat
63
Fri Mar 3 20:50:31 2023
IK, MP, GJ
Other
Data analysis
Ge spectra
Ge rates increasing, similar to what it
was 24h before. Asking to decrease beam intensity
by a factor of 2.
159
Wed Mar 8 10:27:26 2023
IK, BS
Other
General
Ge spectra
Count rates are still a bit high (~2.6kHz
for EAGLE det4). Ge spectra looks fine compared
to earlier ones.
164
Wed Mar 8 13:04:05 2023
IK
Runs
General
Ge spectra
Ge spectra after #161 - #162 beam tuning.
206
Fri Mar 10 16:14:19 2023
IP
Other
General
Ge - the rate is higher
From 13:00 the rate of the Ge [the chanel
4] is a bit higher (~2.15 kHz). And also
the rate of other detectors.
222
Fri Mar 10 22:40:00 2023
IP
Other
General
Ge - the rate is higher
the rates of detectors are still a bit
higher
135
Tue Mar 7 14:03:20 2023
BS
Runs
General
Counting Rates
39
Thu Mar 2 23:04:01 2023
GJ
Problem Fixed
Hardware
Connection of the plunger cables, grounding, beam read-out for the operators
Notes of the measurements with different conditions
are attached.
230
Sat Mar 11 11:39:55 2023
EG
Problems
Buffers clearing
at 11:34:50 sek on 11 march a spike in
counting rate of some Ge detectors is observed.
Buffers not cleared properly?
62
Fri Mar 3 19:41:27 2023
IK
Problems
Hardware
Beamdump readout issue Vol.2.
Issue described in #61 continues to
persist.
Beam stopped from 19:20 to 19:32,
61
Fri Mar 3 17:52:41 2023
IK
Problem Fixed
Hardware
Beamdump readout issue - solved
Current readout issues from beamdump. Beam
stopped from 17:46-17:52, run 36 ongoing.
MP & GJ checking the grounding
131
Tue Mar 7 09:56:07 2023
OST
Problems
mechanics
Beam stopped and operators controlling number 15_Ge dedector.
186
Thu Mar 9 13:37:33 2023
OST
Other
Beam
Beam stopped 13:37-13:49 for control again.
Goto page
Previous
1
,
2
,
3
...
6
, 7,
8
...
13
,
14
,
15
Next
All
ELOG V3.1.5-fc6679b