EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 8 of 14  ELOG logo
Entry  Tue Mar 7 15:14:29 2023, OST, Problem Fixed, , Software, Run 46 started-15_Ge and number 5 anticompton working now. 

VME crate with CAEN digitizers was rebooted.

Run 46 started, number 15_Ge and number 5 anticompton dedector working now.

 

Entry  Tue Mar 7 16:06:16 2023, OST, Runs, , General,  

run control = 46

run data =/onlineNEDA_00/xData/hil099/run_0046_07-03-2023_15h08m38s/needleRU_i46_0046_0004.caendat

RU =  6.51 MB/s

LF =   3.44 MB/s

plunger:

plunger run = 405

actual distance =  283 um

supposed distance = 282.7 um

micrometer =   285.9 um

position =  50 um

voltage =  2.966 V

Beam dump =  0.7 nA

Collimater=  0.5 nA

Entry  Tue Mar 7 17:45:18 2023, IP, Runs, , General,  

run control = 46

run data = /onlineNEDA_00/xData/hil099/run_0046_07-03-2023_15h08m38s/needleRU_i46_0046_0013.caendat

RU =  6.10 MB/s

LF =   3.26 MB/s

plunger:

plunger run = 422

actual distance =  282.6um

supposed distance = 282.7 um

micrometer =   284.9 um

position =  49.9 um

voltage =  2.968 V

Beam dump =  0.7 nA

Collimater=  0.5 nA

Entry  Tue Mar 7 19:24:25 2023, IP, Runs, , General,  

run control = 46

run data = /onlineNEDA_00/xData/hil099/run_0046_07-03-2023_15h08m38s/needleRU_i46_0046_0022.caendat

RU =  6.22 MB/s

LF =   3.34 MB/s

plunger:

plunger run = 439

actual distance =  282.5um

supposed distance = 282.7 um

micrometer =   284.9 um

position =  49.8 um

voltage =  2.97 V

Beam dump =  0.7 nA

Collimater=  0.5 nA

Entry  Tue Mar 7 20:42:03 2023, IP, Problems, , Beam, beam unstable 

There was a problem with the beam from 20:19 to 20:30.

Now it is fine.

Entry  Tue Mar 7 20:45:13 2023, IP, Runs, , General,  

run control = 46

run data =/onlineNEDA_00/xData/hil099/run_0046_07-03-2023_15h08m38s/needleRU_i46_0046_0028.caendat

RU =  4.9 MB/s

LF =   3.14 MB/s

plunger:

plunger run = 452

actual distance =  282.4 um

supposed distance = 282.7 um

micrometer =   284.7 um

position =  49.7 um

voltage =  2.971 V

Beam dump =  0.7 nA

Collimater=  0.5 nA

Entry  Tue Mar 7 21:55:45 2023, IP, Runs, , General,  

run control = 46

run data = /onlineNEDA_00/xData/hil099/run_0046_07-03-2023_15h08m38s/needleRU_i46_0046_0034.caendat

RU =  4.78 MB/s

LF =   3.10 MB/s

plunger:

plunger run = 464

actual distance =  282.8 um

supposed distance = 282.7 um

micrometer =   285.1 um

position =  49.9 um

voltage =  2.965 V

Beam dump =  0.7 nA

Collimater=  0.5 nA

Entry  Tue Mar 7 23:39:52 2023, IP, KS, Runs, , General, run 46 stopped 

Run 46 - stopped

  • Run number: 46
  • Start time: Tue Mar 7 15:09:06 2023
  • Stop time: Tue Mar 7 23:38:07 2023
Entry  Tue Mar 7 23:54:05 2023, IP, KS, Runs, , General,  

run control = 47

run data = /onlineNEDA_00/xData/hil099/run_0047_07-03-2023_23h42m03s/needleRU_i47_0047_0000.caendat

RU =  4.47 MB/s

LF =   3.26 MB/s

plunger:

plunger run = 484

actual distance =  282.8 um

supposed distance = 282.7 um

micrometer =   285.2 um

position =  50.1 um

voltage =  2.965 V

 

Beam dump =  0.7 nA

Collimater=  0.5 nA

Entry  Wed Mar 8 00:31:05 2023, KS, KSz, Runs, , General, Run 47 standard info 

run control = 47

run data = /onlineNEDA_00/xData/hil099/run_0047_07-03-2023_23h42m03s/needleRU_i47_0047_0003.caendat

RU =  5.12 MB/s

LF =   3.32 MB/s

plunger:

plunger run = 491

actual distance =  282.9 um

supposed distance = 282.7 um

micrometer =   285.12 um

position =  50.2 um

voltage =  2.963 V

Beam dump =  0.7 nA

Collimater=  0.5 nA

Entry  Wed Mar 8 01:24:04 2023, BS, Runs, , General, Run 47 Stopped to Change Distance Change 

Run 47 stopped and distance changed from 50 um (+ 100 um offset) to 150 um (+ 100 um offset)

Last plunger run for 50 um (+ 100 um offset) is 495

Entry  Wed Mar 8 01:24:58 2023, KS, KSz, Runs, , General, New run started 48 (new distance) 

run control = 48

run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0000.caendat

RU =  5.09 MB/s

LF =   3.15 MB/s

plunger:

plunger run = 498

actual distance =  382.7 um

supposed distance = 382.7 um

micrometer =   383.4 um

position =  149.7 um

voltage =  2.146 V

 

Beam dump =  0.7 nA

Collimater=  0.5 nA

Entry  Wed Mar 8 02:45:53 2023, KS, KSz, Other, , Beam, increase in Counting Rates  

Since 2:32 increased counting rate observed:

Sinde 3:45 decrease to 1.5 kHz ch4.

run control = 48

/onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0007.caendat
run data =

RU =  8.69 MB/s

LF =   3.79 MB/s

Eagle Rated ch4: around 2.3 kHz

plunger: (2:48)

plunger run = 514

actual distance =  382.7 um

supposed distance = 382.7 um

micrometer =   383.5 um

position =  149.8 um

voltage =  2.144 V

 

Beam dump =  1.5 nA

Collimater=  0.5 nA

Entry  Wed Mar 8 04:24:40 2023, KS, KSz, Runs, , General, Run 48 

run control = 48

run data =  /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0017.caendat

RU =  5.75 MB/s

LF =   3.21 MB/s

plunger:

plunger run = 530

actual distance =  382,7 um

supposed distance = 382.7 um

micrometer =   384.3 um

position =  150.3 um

voltage =  2.146 V

Beam dump =  1.5 nA

Collimater=  0.7 nA (?)

Entry  Wed Mar 8 06:25:53 2023, KS, KSz, Runs, , General,  

run control = 48

run data =  /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0029.caendat

RU =  6.59 MB/s

LF =   3.35 MB/s

plunger:

plunger run = 550

actual distance =  382,5 um

supposed distance = 382.7 um

micrometer =   384.6 um

position =  149.8um

voltage =  2.146 V

Beam dump =  1.5 nA

Collimater=  0.7 nA (?)

Entry  Wed Mar 8 07:30:15 2023, KS, KSz, Problems, , Beam, beam unstable 

The beam was unstable from 7:18 to 7:25.

Entry  Wed Mar 8 07:57:05 2023, IK, Problems, , Beam, beam unstable Screenshot_2023-03-08_08-17-41.png

The beam was unstable from 7:55. Stabilized around 8:03.

Counting rates are higher, EAGLE det4 went to ~2.5kHZ from ~2kHz (attached).

According to the operator, a bit of a tuning was done, current is 1nA.

 

run control = 48

run data =  /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0041.caendat

RU =  10.4 MB/s

LF =   4.3 MB/s

 

 

 

 

Entry  Wed Mar 8 09:31:43 2023, IK, Runs, , General, Run 48 stopped, run 49 started 

Run 48 stopped at 9:29 to start a new run.

Run 49 is started okay at 9:31.

 

run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0041.caendat

RU =  10.1 MB/s

LF =   4.68MB/s

plunger:

plunger run = 582

actual distance =  383.1 um

supposed distance = 382.7 um

micrometer =   385.8 um

position =  150.5 um

voltage =  2.145 V

 

Beam dump 0.7 nA

 

 

 

 

 

 

Entry  Wed Mar 8 10:27:26 2023, IK, BS, Other, , General, Ge spectra Screenshot_2023-03-08_10-24-20.png

Count rates are still a bit high (~2.6kHz for EAGLE det4). Ge spectra looks fine compared to earlier ones.


 

Entry  Wed Mar 8 10:31:10 2023, IK, Runs, , General, Run 49 

run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0008.caendat

RU =  10.6 MB/s

LF =   4.89MB/s

plunger:

plunger run = 591

actual distance =  383.0 um

supposed distance = 382.7 um

micrometer =   385.8 um

position =  150.3 um

voltage =  2.145 V

 

Beam dump 0.7 nA

 

 

 

 

 

 

ELOG V3.1.5-fc6679b