EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 8 of 15  ELOG logo
ID Date Authordown Type test Category Subject
  Draft   Wed Apr 15 13:32:24 2026 JD, DWProblem Fixed Beam 

 

Quote:

Beam back on 05:15

 

  78   Sun Mar 5 01:26:58 2023 JD DWRuns General 

UN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0010.caendat

RU =  6.96 MB/s

LF = 3.65 MB/s

Plunger ;

Planger run = 607

Supposed Dist= 240 um

Actual Distance =  240.1 um

micrometer = 186.4 um

Voltage =  2.719 V

Beam dumb = 0.75 nA

Collimeter = 0.55nA

  79   Sun Mar 5 02:06:40 2023 JD DWRuns General 

UN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0017.caendat

RU =  7.86 MB/s

LF =  3.88 MB/s

Plunger ;

Planger run = 616

Supposed Dist= 240 um

Actual Distance =  239.8 um

micrometer = 185.9 um

Voltage =  2.721 V

Beam dumb = 0.75 nA

Collimeter = 0.5nA

ELOG V3.0.0-21dc563

  80   Sun Mar 5 03:11:45 2023 JD DWRuns General 

RUN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0023.caendat

RU =   7.62 MB/s

LF =  3.83 MB/s

Plunger ;

Plunger run = 626

Supposed Dist=  240 um

Actual Distance =  238.5 um

micrometer = 185.5 um

Voltage =   2.727 V

Beam dumb = 1 nA

Collimeter = 1 nA

  81   Sun Mar 5 04:04:39 2023 JD DWRuns General 

UN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0030.caendat

RU =  7.78 MB/s

LF =  3.85 MB/s

Plunger ;

Plunger run = 636

Supposed Dist=  240 um

Actual Distance = 239.0 um

micrometer =  185.8 um

Voltage =   2.724 V

Beam dumb = 1 nA

Collimeter = 1 nA

  82   Sun Mar 5 05:06:50 2023 JD DWRuns General 

RUN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0037.caendat

RU =  7.93 MB/s

LF =  3.91 MB/s

Plunger ;

Plunger run = 646

Supposed Dist=  240 um

Actual Distance = 239.5 um

micrometer =  186.0um

Voltage =   2.725 V

Beam dumb = 1 nA

Collimeter = 1 nA

  83   Sun Mar 5 06:03:26 2023 JD DWRuns General 

UN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0043.caendat

RU =  7.65 MB/s

LF =  3.86 MB/s

Plunger ;

Plunger run = 656

Supposed Dist=   240 um

Actual Distance = 239.3  um

micrometer =   186.1 um

Voltage =    2.725 V

Beam dumb = 1 nA

Collimeter = 0.75 nA

  84   Sun Mar 5 07:12:49 2023 JD DWRuns General 

RUN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0051.caendat

RU =   8.02 MB/s

LF =   3.97 MB/s

Plunger ;

Plunger run = 667

Supposed Dist=   240 um

Actual Distance = 238.8 um

micrometer =  186.0 um

Voltage =   2.723  V

Beam dumb = 1 nA

Collimeter = 0.75 nA

  102   Mon Mar 6 05:21:16 2023 JD DWRuns General 

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0026.caendat

RU =    8.24 MB/s

LF =   3.96 MB/s

Plunger ;

Plunger run = 58

Supposed Dist= 242.7 um

Micrometer =   245.0um

Position =    9.9 um

Actual distance =242.5  um

Voltage =    3.816V

Beam dumb =  2.5 nA

Collimeter =  1.1 nA

  105   Mon Mar 6 08:10:32 2023 JDRuns General 

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0043.caendat

RU =   7.3 MB/s

LF =   3.65 MB/s

Plunger ;

Plunger run = 86

Supposed Dist= 242.7 um

Micrometer =  245.3  um

Position =   9.7  um

Actual distance = 242.4 um

Voltage =  3.821  V

Beam dumb =  1.25 nA

Collimeter = 0.75  nA

  50   Fri Mar 3 09:30:15 2023 IP. KWLRuns General 

plunger run # 208

Beam dump 0.75 enA (given by operators) * 7 (following entry ID#39) = 5.25 enA

Collimator   0.75  enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0037.caendat

RU : 3.85 MB/s

LF : 7,29 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 9.3 um

Voltage = 7.93 V

  51   Fri Mar 3 10:09:20 2023 IP. KWLRuns Generalbeam intensity decreased to 0.3 enA (at beam dump) on our request

// we noticed yesterday that GE at 143 degrees counts more than those placed at 117 and 101. The 511 keV line (+ background) is much more pronounced for Ge at 143 degrees. To investigate this issue we decreased the beam intensity to 0.3 enA ( value given by operators at the beam dump ). 

Conclusion - decrease of the beam intensity does not explain above observations (se attached figs)

 

plunger run # 216

Beam dump 0.3 enA (given by operators) * 7 (following entry ID#39) = 2.1 enA

Collimator     enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0040.caendat

RU : 2.15 MB/s

LF : 5.60 MB/s

Supposed Distance = 10 um

position of the target = 10.6 um

micrometer = 8.8 um

Voltage = 7.8 V

Attachment 1: Ge_beamInten_03enA_differentYscale.png
Ge_beamInten_03enA_differentYscale.png
Attachment 2: Ge_beamInten_03enA_sameYscale.png
Ge_beamInten_03enA_sameYscale.png
  52   Fri Mar 3 10:21:18 2023 IP. KWLRuns Generalbeam intensity back to 1.25 enA at the beam dump

we increased beam intensity to 1.25 enA (readout at the beam dump)

  56   Fri Mar 3 13:43:56 2023 IP. KWLRuns  511 annihilation and 279 Au lines in Ge rings

The counting rate in 511 keV line for sum of the Ge detectors placed at 101, 117 and 143 degrees (with approved ACS). The largest intensity is visible for Ge at 143 degrees, lowest for 101 deg.

=============================== RING 101

Integration in spectrum user_ge_ring101_acceptedACS_clone.spc

RESULT : 3895

=============================== RING 117

Integration in spectrum user_ge_ring117_acceptedACS.spc

RESULT : 9392

=============================== RING 143

Integration in spectrum user_ge_ring143_acceptedACS.spc

RESULT : 15767

 

The Coulex of 197Au (279.5 keV ) line is visible in all rings with a comparable intensity:

=============================== RING 101

Integration in spectrum user_ge_ring101_acceptedACS_clone.spc

RESULT : 12491

=============================== RING 117

Integration in spectrum user_ge_ring117_acceptedACS.spc

RESULT : 11443

===============================RING 143

Integration in spectrum user_ge_ring143_acceptedACS.spc

RESULT : 10460

 

 

 

Attachment 1: ge_rings101_117_143_acceptedACS_gold_line_279keV.png
ge_rings101_117_143_acceptedACS_gold_line_279keV.png
Attachment 2: ge_rings101_117_143_acceptedACS.png
ge_rings101_117_143_acceptedACS.png
  57   Fri Mar 3 13:54:41 2023 IP. KWLRuns Generalbeam energy measurement

beam stop due to the beam energy measurement

The beam energy: ~145 MeV

  147   Tue Mar 7 23:39:52 2023 IP, KSRuns Generalrun 46 stopped

Run 46 - stopped

  • Run number: 46
  • Start time: Tue Mar 7 15:09:06 2023
  • Stop time: Tue Mar 7 23:38:07 2023
  148   Tue Mar 7 23:54:05 2023 IP, KSRuns General 

run control = 47

run data = /onlineNEDA_00/xData/hil099/run_0047_07-03-2023_23h42m03s/needleRU_i47_0047_0000.caendat

RU =  4.47 MB/s

LF =   3.26 MB/s

plunger:

plunger run = 484

actual distance =  282.8 um

supposed distance = 282.7 um

micrometer =   285.2 um

position =  50.1 um

voltage =  2.965 V

 

Beam dump =  0.7 nA

Collimater=  0.5 nA

  53   Fri Mar 3 11:37:25 2023 IPRuns General 

plunger run # 230

Beam dump 1.2  enA (given by operators) * 7 (following entry ID#39) = 8.4 enA

Collimator   0.6  enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0047.caendat

RU : 5.88 MB/s

LF : 8.35 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.94 V

  54   Fri Mar 3 11:48:29 2023 IPRuns Generalbeam stopped

The beam is gone.

  55   Fri Mar 3 12:11:24 2023 IPRuns General 

the beam comes back.

ELOG V3.1.5-fc6679b