EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 9 of 14  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Type testdown Category Subject
  161   Wed Mar 8 11:42:14 2023 IKProblems GeneralRun 49

Counting rates continued to increase (det4 > 3kHz). Beam current looked fine on the beam dump, but beam is fluctuating, and can reach 2nA on the collimator.  Asked for improved focusing.

Attached screenshots and Ge spectra from before changing anything.

 

run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0020.caendat

RU =  13.3 MB/s

LF =   6.15MB/s

plunger:

plunger run = 603

actual distance =  382.7 um

supposed distance = 382.7 um

micrometer =   385.9 um

position =  150.0 um

voltage =  2.146 V

 

Beam dump 0.7 nA

Collimator ~1.5-2nA when the generator retunes itself (prob the beam gets defocused at those moments)

 

 

 

 

 

Attachment 1: Screenshot_2023-03-08_11-38-47.png
Screenshot_2023-03-08_11-38-47.png
Attachment 2: Screenshot_2023-03-08_11-38-19.png
Screenshot_2023-03-08_11-38-19.png
Attachment 3: Screenshot_2023-03-08_11-37-37.png
Screenshot_2023-03-08_11-37-37.png
  162   Wed Mar 8 12:11:59 2023 IKProblem Fixed Generalbeam tuned

Beam tuning was made, focusing significantly improved.

 

Intensity:

beam dump: 0.9-1 nA,

collimator: 0.5 nA.

 

Rates:

RU =  8.2 MB/s

LF =   4.03 MB/s

EAGLE det4: 2.2 kHz

 

  163   Wed Mar 8 13:02:38 2023 IKRuns GeneralRun 49

run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0030.caendat

RU =  7.86 MB/s

LF =   3.87 MB/s

plunger:

plunger run = 616

actual distance =  382.7 um

supposed distance = 382.7 um

micrometer =   385.7 um

position =  150.0 um

voltage =  2.147 V

 

Beam dump 0.7 nA

 

 

 

 

 

 

  164   Wed Mar 8 13:04:05 2023 IKRuns GeneralGe spectra

Ge spectra after #161 - #162 beam tuning.

Attachment 1: Screenshot_2023-03-08_13-03-10.png
Screenshot_2023-03-08_13-03-10.png
  165   Wed Mar 8 14:47:34 2023 AMRuns Beambeam unstable

two drops in beam intesitivity at 14:33, 14:37 and 14:51

  166   Wed Mar 8 15:57:53 2023 IK, AMProblems GeneralBeam issue

no beam in 15:52 - 16:21 due to power supply problem

  167   Wed Mar 8 16:51:13 2023 BSRuns General 

run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0050.caendat

RU =  6.75 MB/s

LF =   3.44 MB/s

plunger:

plunger run = 654

actual distance =  382.7 um

supposed distance = 382.7 um

micrometer =   384.4 um

position =  150.0 um

voltage =  2.147 V

 

Beam dump 1 nA

  168   Wed Mar 8 16:53:07 2023 BSRuns GeneralRates
Attachment 1: Screenshot_2023-03-08_16-52-03.png
Screenshot_2023-03-08_16-52-03.png
Attachment 2: Screenshot_2023-03-08_16-51-42.png
Screenshot_2023-03-08_16-51-42.png
  169   Wed Mar 8 17:59:38 2023 BSRuns GeneralGeneral

run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0058.caendat

RU =  9.83 MB/s

LF =   4.87 MB/s

plunger:

plunger run = 665

actual distance =  382.7 um

supposed distance = 382.7 um

micrometer =   384.4 um

position =  150.0 um

voltage =  2.148 V

 

Beam dump 1,25 ~ 1.5  nA

  170   Wed Mar 8 18:02:43 2023 BSRuns GeneralRates
Attachment 1: Screenshot_2023-03-08_18-01-49.png
Screenshot_2023-03-08_18-01-49.png
  171   Wed Mar 8 19:01:49 2023 OSTRuns Generalbeam current was very low and beam increased after this entry

run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0064.caendat

RU =  5.75 MB/s

LF =   3.50 MB/s

plunger:

plunger run = 676

actual distance =  382.8 um

supposed distance = 382.7 um

micrometer =   384.9 um

position =  150.4 um

voltage =  2.146 V

 

Beam dump 0.7

  172   Wed Mar 8 20:46:16 2023 OSTRuns General 

run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0074.caendat

RU =  6.35 MB/s

LF =   3.47 MB/s

plunger:

plunger run = 693

actual distance =  382.5 um

supposed distance = 382.7 um

micrometer =   384.1 um

position =  149.8 um

voltage =  2.148 V

 

Beam dump: 1 nA

Colimator :  0.5 nA

  173   Wed Mar 8 22:36:30 2023 OSTRuns General 

run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0082.caendat

RU =  6.06 MB/s

LF =   3.44 MB/s

plunger:

plunger run = 709

actual distance =  382.9 um

supposed distance = 382.7 um

micrometer =   384.7 um

position =  150.2 um

voltage =  2.145 V

 

Beam dump: 1 nA

Colimator :  0.5 nA

  174   Thu Mar 9 01:07:48 2023 WPRuns GeneralNew run started 50 (distance change)

run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0000.caendat

 

RU =  7.43MB/s

LF =   3.61 MB/s

plunger:

plunger run = 736

actual distance =  533 um

supposed distance = 532.7 um

micrometer =   533.5 um

position =  300 um

voltage =  1.657 V

 

Beam dump: 1-1.5 enA (oscillating)

Colimator :  0.6 enA

 

  175   Thu Mar 9 01:41:50 2023 GJProblem Fixed HardwareTS zeroing - cables to S-IN from VME controller - between runs 49 and 50
Since we were observing jumps of 16 ns in timings of all channels of whole boards, the assumption was that the 
signals from logical FIFO arrive at different times to S-IN inputs to zero the TS counters.
6 originally placed cables of quite the same length were replaced with 6 cables of declared 3-ns length, same 
producer, borrowed from NW's equipment.
  176   Thu Mar 9 02:14:09 2023 WPRuns GeneralGeneral

run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0008.caendat

 

 

RU =  7.24 MB/s

LF =   3.64 MB/s

plunger:

plunger run = 748

actual distance =  532.1 um

supposed distance = 532.7 um

micrometer =   532.9 um

position =  299.4 um

voltage =  1.66 V

 

Beam dump: 1-1.5 enA (oscillating)

Colimator :  0.6 enA

 

  177   Thu Mar 9 03:14:39 2023 WPRuns GeneralGeneral

run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0015.caendat

 

 

RU =  6.91 MB/s

LF =   3.48 MB/s

plunger:

plunger run = 758

actual distance =  533.5 um

supposed distance = 532.7 um

micrometer =   533.1 um

position =  300.9 um

voltage =  1.658 V

 

Beam dump: 1-1.5 enA (oscillating)

Colimator :  0.6 enA

 

  178   Thu Mar 9 04:17:21 2023 WPRuns GeneralGeneral

run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0022.caendat

 

 

RU =  7.48 MB/s

LF =   3.59 MB/s

plunger:

plunger run = 769

actual distance =  531.1 um

supposed distance = 532.7 um

micrometer =   533.7 um

position =  300.5 um

voltage =  1.655 V

 

Beam dump: 1-1.5 enA (oscillating)

Colimator :  0.6 enA

 

  179   Thu Mar 9 05:19:33 2023 WPRuns GeneralGeneral

run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0028.caendat

 

 

RU =  7.15 MB/s

LF =   3.68 MB/s

plunger:

plunger run = 779

actual distance =  533.1 um

supposed distance = 532.7 um

micrometer =   533.4 um

position =  299.6 um

voltage =  1.66 V

 

Beam dump: 1-1.5 enA (oscillating)

Colimator :  0.6 enA

 

  180   Thu Mar 9 06:24:10 2023 WPRuns GeneralGeneral

run control = 50

run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0035.caendat

 

 

RU =  7.39 MB/s

LF =   3.60 MB/s

plunger:

plunger run = 790

actual distance =  532.8 um

supposed distance = 532.7 um

micrometer =   533.6 um

position =  300.1 um

voltage =  1.657 V

 

Beam dump: 1-1.5 enA (oscillating)

Colimator :  0.6 enA

 

ELOG V3.1.5-fc6679b