EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
N-SI-85 exp22.41 N-SI-68 N-SI-69 N-SI-128 N-SI-137
  Coulex experiments  ELOG logo
Message ID: 92     Entry time: Wed Jun 14 05:12:51 2023
Author: MKOM 
Type: Runs 
test:  
Category:  
Subject: run_62 

==> DAQ started at : 23-06-14 at 05h-39m-53s
==> Shell name      : ./.user_start.sh
    File name       : run
    Run number      : 62
    User commentary :
    Start time      : 2023-06-14 05:39:24.608419
==> End of ./.user_start.sh

Beam: 115 MeV 24Mg

Target: 24Mg(1.5 mg/cm^2)

Beam current : 15 minutes after the run started operator decided to incease beam intensity; after an hour the current was 2 enA, and in the end of the run it was 7enA

Data flow: started with ~5 Mb/s; after an hour 25 Mb/s

 

==> DAQ stopped                 at      : 23-06-14 at 07h-39m-32s                                                        
                                                                                                                         
==> shell name : ./.user_stop_trunkv3.sh                                                                                 
    User commentary      :                                                                                               
    Start        time    : 2023-06-14 05:39:48.085728
    Stop         time    : 2023-06-14 07:39:34.193301
    Run          duration: 1:59:46.107573
    DATA         saved   : 6132533586
    GROUP        saved   :          0 (0,00 %)
    COUNTER      saved   :   18692169 (0,30 %)
    QDC          saved   : 4734288023 (77,19 %)
    CRRC4        saved   :          0 (0,00 %)
    TRAPEZ       saved   : 1361601715 (22,20 %)
    SAMPLER      saved   :          0 (0,00 %)
    QT2T         saved   :          0 (0,00 %)
    SCALER       saved   :          0 (0,00 %)
    ELECTROMETER saved   :          0 (0,00 %)
    MISSING TAG  saved   :          0 (0,00 %)
    MISSED  TAG  saved   :          0 (0,00 %)
    OTHER        saved   :   17951679 (0,29 %)
    DATA         lost    :          0 (0,00 %)
==> End of ./.user_stop_trunkv3.sh

Attached spectrum - scaled run 53 (blue) vs 62 - we have 24Mg beam beam

Attachment 1: Capture_d’écran_du_2023-06-14_05-42-04.png  67 kB  Uploaded Wed Jun 14 06:43:11 2023  | Show | Show all
Attachment 2: Capture_d’écran_du_2023-06-14_05-54-28.png  24 kB  Uploaded Wed Jun 14 06:52:58 2023  | Show | Show all
ELOG V3.1.5-fc6679b