EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
N-SI-85 exp22.41 N-SI-68 N-SI-69 N-SI-128 N-SI-137
  Coulex experiments, Page 6 of 6  ELOG logo
Entry  Sat Jun 17 03:25:08 2023, KWL, JI, KHK, Runs, , General, run_3 Capture_d’écran_du_2023-06-17_03-25-14.pngCapture_d’écran_du_2023-06-17_03-53-27.pngCapture_d’écran_du_2023-06-17_03-54-33.pngCapture_d’écran_du_2023-06-17_05-29-16.png
DSSD:

ch0 24.95 V 9.8 uA

ch2 25 V 5.51 uA
Entry  Fri Jun 16 14:33:10 2023, KHK, CH, Runs, , General, run_2 Capture_d’écran_du_2023-06-16_14-40-33.png
stop - the source is stopped - no beam

target position 6, 1.5 mg/cm2

data rate 5-6 MB/s
Entry  Fri Jun 16 09:44:52 2023, KHK, GC, GL, Runs, , General, to be neglected in the analysis 
test_noDSSD_62Ni_197Au.fast - run with the FC on, good for background (the beam was on but not on the target)

test_withDSSD_62Ni_197Au.fast - 58Ni beam on the target, E~210, intensity ~20 enA

test_withDSSD_62Ni_197Au_2.fast - 58Ni beam on the target, E~210, intensity ~20 enA
Entry  Fri Jun 16 09:37:55 2023, GC KHK GL, Runs, , General, First run with 62Ni on the target Capture_d’écran_du_2023-06-16_09-37-01.png
beam current 20 enA

charge state 17

energy is yet to be checked (tuned to 210 MeV of 58Ni, Alain has to recalculate and change to 230 MeV of 62Ni)
Entry  Fri Jun 16 08:19:50 2023, GC KHK, Runs, , , test run 
==> DAQ started at : 23-06-16 at 06h-13m-35s                                                                                                                                                                     
 
==> Shell name      : ./.user_start.sh                                                                               &nbs
Entry  Thu Jun 15 21:47:59 2023, KHK, Other, , mechanics, targets - 15/06/2023 IMG_5211.jpg
1 hole

2 197Au 1.5 mg/cm² (Warsaw)

3 208Pb 1 mg/cm²
Entry  Thu Jun 15 11:29:03 2023, KHK, GC, Other, , General, DSSD angles and energies E_beam=233 MeV  
Angle (°) Emin Emax
(MeV) (MeV)
128 46.34 80.95
Entry  Mon Jun 5 12:35:01 2023, KHK, Other, , General, shift list 
https://docs.google.com/spreadsheets/d/1E0zoVXJh43frmIVmlyXVGJU8-V3vigXzEAF9EwyT3Ys/edit#gid=0
Entry  Mon Jun 5 12:29:06 2023, KHK, Other, , General, 62Ni coulex - proposal 62Ni_COULEX_Orsay.pdf
 
ELOG V3.1.5-fc6679b