EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
N-SI-85 exp22.41 N-SI-68 N-SI-69 N-SI-128 N-SI-137
  Coulex experiments, Page 7 of 7  ELOG logo
Entry  Sat Jun 24 05:34:06 2023, Iolanda, Problems, , Hardware, TANDEM spark  
TANDEM sparked during run 56 @5:33

Will let the run continue; beam back after ~3 min ...
Entry  Mon Jun 5 12:29:06 2023, KHK, Other, , General, 62Ni coulex - proposal 62Ni_COULEX_Orsay.pdf
 
Entry  Mon Jun 5 12:35:01 2023, KHK, Other, , General, shift list 
https://docs.google.com/spreadsheets/d/1E0zoVXJh43frmIVmlyXVGJU8-V3vigXzEAF9EwyT3Ys/edit#gid=0
Entry  Thu Jun 15 11:29:03 2023, KHK, GC, Other, , General, DSSD angles and energies E_beam=233 MeV  
Angle (°) Emin Emax
(MeV) (MeV)
128 46.34 80.95
Entry  Thu Jun 15 21:47:59 2023, KHK, Other, , mechanics, targets - 15/06/2023 IMG_5211.jpg
1 hole

2 197Au 1.5 mg/cm² (Warsaw)

3 208Pb 1 mg/cm²
Entry  Sun Jun 18 01:30:21 2023, NM, MR, Other, , Other, Particle spectra Capture_d’écran_du_2023-06-18_01-13-56.png
We observed a decrease in the particle energies. We attached one channel comparing with the same but from run 5. We keep running.
 
Entry  Sun Jun 18 19:24:19 2023, All, Other, , Other, change the foils every ~2 hours 
PAY attention to the stripper foil.

If the beam intensity drops to 15 enA, check the stripper foil.

It should be ~5 enA after the target (the meter on the counter)
Entry  Fri Jun 23 05:21:17 2023, KHK, Other, , General, instructions for shifters Capture_d’écran_du_2023-06-23_05-12-03.pngCapture_d’écran_du_2023-06-23_05-16-20.png
1. start a new run every 2 hours

2. go to the HV power supply of the DSSD. On the small blue screen you will see 4 channels. Write down tyhe numbers for ch0, ch2, ch3. Ch1 is
off
ELOG V3.1.5-fc6679b