EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
N-SI-85 exp22.41 N-SI-68 N-SI-69 N-SI-128 N-SI-137
  N-SI-85, Page 1 of 4  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Mon Feb 6 16:02:40 2023, pjn,khk,gp, , , shift list 
https://docs.google.com/spreadsheets/d/1ZyDHTmK5NTfsByGTj3iUzcIghXaAduJPavtb8AAH4hg/edit#gid=0
Entry  Mon Feb 6 16:07:59 2023, All, Other, General, Test run for HPGe with 60Co 60Co-test.pngCapture_d’écran_du_2023-02-06_16-10-44.png
Detector in the visualtization online are correctly calibrated.

Example of spectra.

 
Entry  Tue Feb 7 02:17:49 2023, All, Other, General, DSSSD tunning fail - run 157 
We set the treshold for sectors except for strip 0 up to strip 10 of sector 2 , where no signal seemed to be. We see the signals for rings one analog
(osciloscope from the exp room).

For the rings, we were not able to get rid of the pedestal and see the lines of interest from the alpha source. Also, the signal is very noisy.
Entry  Tue Feb 7 02:34:56 2023, All, Other, General, run 158 
DAQ started at 23-02-07 at 02h-55m-47s

 

alpha source
Entry  Tue Feb 7 04:59:33 2023, all, Other, General, targets IMG_0252.jpeg02f7fc90-a92a-4b29-85a9-51d6629dbf75.jpg
targets:

 

1 empty
Entry  Tue Feb 7 13:44:39 2023, all, , , run 5  
=> DAQ started at : 23-02-07 at 12h-22m-08s                            
 
=> Shell name      : ./.user_start.sh                                  
Entry  Tue Feb 7 13:50:17 2023, All, , , run 6 
=> DAQ started at : 23-02-07 at 14h-12m-15s    
=> Shell name      : ./.user_start.sh          
   File name       : run                     
Entry  Tue Feb 7 15:03:04 2023, All, , , Run 7 Capture_d’écran_du_2023-02-07_14-41-51.png
==> DAQ started at : 23-02-07 at 14h-52m-42s                                                                                                                                                                     
 
==> Shell name      : ./.user_start.sh                                                                               &nbs
Entry  Tue Feb 7 15:42:57 2023, All, , , Beam problem 
Beam problems (with the ionizer). Stop experiment until Thursday morning for maintenence.
Entry  Tue Feb 7 15:58:35 2023, All, , , 152Eu 
Run for calibration with 152Eu source. Not in the center.

 

==> DAQ started at : 23-02-07 at 16h-04m-03s      
Entry  Tue Feb 7 16:41:23 2023, All, , , run_152_eff 
=> DAQ started at : 23-02-07 at 17h-03m-54s                                                                                                                                                                     
 
==> Shell name      : ./.user_start.sh                                                                                
Entry  Tue Feb 7 18:49:34 2023, all, , , 60Co - calib 
=> DAQ started at : 23-02-07 at 19h-07m-11s      
=> Shell name      : ./.user_start.sh            
   File name       : 60Co-calib                
Entry  Thu Feb 9 22:51:01 2023, khk, pjn and others, Other, General, instructions for Friday, 10.02.2023 
1. when the beam comes, start with the target position 1 - empty frame - let the operators to center on it - the wheel is now set
to 1

2. then check with the quartz - position 2 - but we would probably need about 4 pnA on a target to do that
Entry  Thu Feb 9 22:51:35 2023, khk, pjn and others, Routine, , target positions, 09.02.2023 IMG_0281.jpeg
Target positions:

1. empty

2. quartz
Entry  Sun Feb 12 17:04:04 2023, Michalina, PJN, Piku, Ananya, Other, Other, trigger settings for S1_1 Capture_d’écran_du_2023-02-12_17-01-37.png
level 4.7 mV (was 3.0)

 
Entry  Sun Feb 12 17:13:35 2023, Michalina, PJN, Piku, Ananya, Other, Other, trigger settings for S1_2 Capture_d’écran_du_2023-02-12_17-14-00.png
level 5.0 mV (was 3.0)

 
Entry  Mon Feb 27 12:12:28 2023, pjn, Other, General, Shift plan 
 Shift plan





 

06.03 Mon
07.03 Tue
Entry  Mon Feb 27 12:48:07 2023, pjn, Other, General, Proposal 40Ca_pacalto_2015.pdf
 
Entry  Mon Mar 6 15:56:02 2023, All, , , Calibration with AmBeNi source for PARIS Capture_d’écran_du_2023-03-06_12-25-59.png
Start at 12:23

 

==> DAQ started at : 23-03-06 at 12h-47m-07s    
Entry  Mon Mar 6 16:27:08 2023, Iolanda, pjn, Other, General, PARIS Configuration Layouts_new.pdf
 
ELOG V3.1.5-fc6679b