Thu Mar 2 09:24:47 2023, ost-mgb, Runs, Run 27 stopped, General,
|
| Run 27 stopped |
Wed Mar 1 19:04:37 2023, BS, Runs, Run, General, Run 26 Started
|
Run 26 Started
Beam 9 enA on the collimator |
Sat Mar 11 10:46:37 2023, EG, Other, Beam intensity, ,
|
ch4 in total rate EGALE_) reached 2.4 kHz, beam intensity has been reduced to fit the required 2kHz.
|
Sun Feb 26 16:50:56 2023, GJ, Other, , General, proposal
|
| |
Sun Feb 26 17:26:45 2023, GJ, Other, , General, List of participants
|
To be filled in, with affiliation and email.
Presumably, for later publication purposes.
|
Mon Feb 27 02:49:10 2023, GJ, Runs, , General, calibs - 2x 152Eu - run 0
|
Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
|
Mon Feb 27 12:10:24 2023, BS, Other, , Target, target
|
Support of Target = 1.5 mg/cm2 Ta
Target = 1.0 mg/cm2 Cd-106
Stopper = 10 mg/cm2 Au
|
Mon Feb 27 12:13:03 2023, MB, Other, , , Plunger Informations
|
Off set of the plunger ~60 um
Distcal file distcal01_vac
|
Mon Feb 27 12:21:29 2023, MP, BS, Runs, , General, List of runs
|
A list of runs, to be filled during the experiment is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing |
Tue Feb 28 23:08:35 2023, BS, Other, , , SHIFT LIST
|
https://docs.google.com/spreadsheets/d/1e2homI9RCYrg369z8aaY3VMIPgapUPOv0zKISsl58vQ/edit?usp=sharing
The data from google sheet obtained 14:17 07/03/23 |
Tue Feb 28 23:10:36 2023, BS, Other, , , What we need to include for Plunger
|
Plunger Run :
Micrometer :
Supposed Distance: |
Wed Mar 1 00:14:28 2023, MP, Other, , Beam, beam energy
|
Beam energy measured: 148.2 MeV
Mind that this may be an overestimate (by ~1-2 MeV) |
Wed Mar 1 11:52:48 2023, MP, Runs, , , first beam
|
| Operators tune beam on the target, collecting run 0023, trigger gg. |
Wed Mar 1 12:51:33 2023, MP, Runs, , Beam, beam on the target
|
Beam on the target:
target+stopper+beam dump: 25 enA (1.7 pnA) not stable
|
Wed Mar 1 16:06:50 2023, BS, Runs, , , Run 23 Stopped
|
Run 23 Stopped due to some unexpected spikes in the
voltage of collimator.
The plunger did not responde to change distance. |
Wed Mar 1 16:07:49 2023, BS, Runs, , , Run 24 Started
|
Run 24 has been started but no beams at the moment.
EAGLE is opened.
Just colecting background. |
Wed Mar 1 20:10:38 2023, BS, DOD, Other, , General,
|
Run 26 is going on but not much for the moment in terms of any useful data.
And half of the EAGLE is opened.
20:50 EAGLE closed. |
Wed Mar 1 21:59:45 2023, MB BS, Other, , General,
|
Offset of the plunger is 60 um.
new distcal01_vac_after_opening |
Thu Mar 2 00:30:29 2023, BS, DOD, Runs, , General,
|
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data |
Thu Mar 2 04:17:40 2023, DOD, Runs, , General,
|
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data |
|